Loading...
16-106095 Mechanical City of Federal Way Fl E Permit #:16-106095-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: BARUSO Project Address: 33110 42ND PL SW Parcel Number:327905 0170 Project Description: Remove/replace gas water heater Owner Applicant Contractor GREGORY BARUSO SALINA THAPAFAST WATER HEATER FAST WATER HEATER CO(GENERAL 33110 42ND PL SW COMPANY 01) FEDERAL WAY WA 11715 NORTH CREEK PKWY S SUITE C-106 FASTWWH948BC(1/4/18) 98023-2667 BOTHELL WA 98011 1715 NORTH CREEK PKWY S SUITE C-101 BOTHELL WA 98011 • Additional Permit Information Mechanical Work Valuation? 1384 Is this an Online or O.T.C.application" Yes Hot Water Tanks 1 PERMIT EXPIRES Sunday,25 June,2017 Permit Issued on Tuesday,December 27,2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. oNILJNE Owner or agent: Date: THIS CARD IS TO REMAIN ON-SITE CITV°� Construction Inspection Record 1 a INSPECTION REQUESTS:(253)835-3050 PERMIT#: 16 106095 00 Address: 33110 42ND PL SW Project: SIIAWN M BARUSO FEDERAL WAY WA 98023-2667 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Tease schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. © Mechanical Rough-in 1(4165) © Gas Piping(4125) 1 El Final-Mechanical(4065) Approved 1 Approved to release test Approved 1 By Date , By Date By Q.— A Date — .... 0 Rough Electrical C3 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date