10-100078 • # Mec,hanical 0
City of Federal Way Permit #: 10-100078-00-M E
TCOrnmeeces
P.O.Box 9718
Federal Way,WA 98063-9718
Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609 p q
Project Name: KELLEY
Project Address: 2108 S 285TH ST Parcel Number: 422210 0190
Project Description: Install an Electric Furnace&Heat Pump
Owner Applicant Contractor
EVELYN E KELLEY SHERRELL LEARY ALL SEASONS INC(GENERAL)
2108 S 285TH ST All Seasons Inc ALLSEI*03055(12/17/09)
FEDERAL WAY WA 98003-3319 4851 S WASHINGTON ST 4851 S WASHINGTON ST
TACOMA WA 98409 TACOMA WA 98407
fligtORC
a,. H cw t '
�. , 'w1 �x, �.�h ' ,uv, � k, m � a.e s „.�a,,
n, a 'a/.-r _'� .a. ..i,„:,,,,,4, a:% .^. . 1. s^•, ^m ^r•,.$
Mechanical Valuation 4000. Is this an Online or O.T.C.application9 Yes
P
Compressors/Heat Pumps 1 Furnaces •
PERMIT EXPIRES Tuesday, July 6, 2010
Permit,Issued on Thursday,January 7, 2010
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
r and the City of Federal Way.
Owner or agent: a jjf4hQ 7-) Date: /— 7 - / 0
Finhil t Z °t /10
r
THIS CARD IS T MAIN ON-SITE
CITY OF Construction Iection Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 10-100078-00-ME Address: 2108 S 285TH ST
Owner: EVELYN E KELLEY FEDERAL WAY, WA 98003-3319
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) El Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Date 1 F/ 0
, -, _..
Fl ,
1
❑ Rough Electrical Final Electrical Right of Way
Approved Approved Approved
By Date By � Date a, 3,‘,` By Date