Loading...
10-100078 • # Mec,hanical 0 City of Federal Way Permit #: 10-100078-00-M E TCOrnmeeces P.O.Box 9718 Federal Way,WA 98063-9718 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax (253)835-2609 p q Project Name: KELLEY Project Address: 2108 S 285TH ST Parcel Number: 422210 0190 Project Description: Install an Electric Furnace&Heat Pump Owner Applicant Contractor EVELYN E KELLEY SHERRELL LEARY ALL SEASONS INC(GENERAL) 2108 S 285TH ST All Seasons Inc ALLSEI*03055(12/17/09) FEDERAL WAY WA 98003-3319 4851 S WASHINGTON ST 4851 S WASHINGTON ST TACOMA WA 98409 TACOMA WA 98407 fligtORC a,. H cw t ' �. , 'w1 �x, �.�h ' ,uv, � k, m � a.e s „.�a,, n, a 'a/.-r _'� .a. ..i,„:,,,,,4, a:% .^. . 1. s^•, ^m ^r•,.$ Mechanical Valuation 4000. Is this an Online or O.T.C.application9 Yes P Compressors/Heat Pumps 1 Furnaces • PERMIT EXPIRES Tuesday, July 6, 2010 Permit,Issued on Thursday,January 7, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington r and the City of Federal Way. Owner or agent: a jjf4hQ 7-) Date: /— 7 - / 0 Finhil t Z °t /10 r THIS CARD IS T MAIN ON-SITE CITY OF Construction Iection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 10-100078-00-ME Address: 2108 S 285TH ST Owner: EVELYN E KELLEY FEDERAL WAY, WA 98003-3319 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) El Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date 1 F/ 0 , -, _.. Fl , 1 ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By � Date a, 3,‘,` By Date