Loading...
12-105467 • S ,1V.(ctkancal City of Federal Way Community&Econ. ev.Services 33325 8th Ave S Fl L E Permit #: 12-105467-00-ME Federal Way,WA 98003 Inspection Request Line: 253 835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p q Project Name: CAVAN '7O■1 Project Address: 29511 9TH PL S Parcel Number: 515210 0100 Project Description: Replace existing gas hot water heater • Owner Applicant Contractor SHEILA K CAVAN JAIMIE HOW BRENNAN HEATING&A/C LLC 29511 9TH PL S BRENNAN HEATING&A/C (GENERAL) FEDERAL WAY,WA 98003 4601 S 134TH PL BRENNHA971R9(12/29/13) SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Valuation 985 Is this an Online or O.T.C.application? Yes Mechanical Fixtures Hot Water Tanks 1 PERMIT EXPIRES Wednesday, June 5, 2013 Permit Issued on Friday, December 7, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: E LIN Date: � L I '10 i2 i THIS CARD IS TO MAIN ON-SITE CITY OF - Construction In ection Record Federal Way INSPECTION REQU TS: (253)835-3050 PERMIT#: 12-105467-00-ME Address: 29511 9TH PL S Project: SHEILA K CAVAN FEDERAL WAY, WA 98003-3738 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El Mechanical Rough-in(4165) El Gas Piping(4125) Ei Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date • SITE Rough Electrical ❑ Final Electrical Right of Way Approved Approved Approved By Date By Date By Date