Loading...
15-101672 . �- - •uilding - gingle aii ily - C ,of FedEcon. ev S � Permit #: 15-101672-00-SF Community&Econ.Dev.ServicesF 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 • Ph:(253)835-2607 Fax (253)835-2609 p a Project Name: MARINE HILLS 12,LOT 1 Project Address: 29305 8TH AVE S Parcel Number: 515280 0180 Project Description: NEW-Construction of a 2,479 square foot 2-story single family residence with a 422 square foot covered entry,225 square foot deck and 686 square foot attached garage. Includes plumbing& mechanical. ***3 Bedrooms; $500,000 estimated selling price. , Owner Applicant Contractor Lender POWELL RENOVATIONS LLC KATIE TOMMASI POWELL RENOVATIONS LLC POWELL RENOVATIONS PUGET SOUND PERMITS POWELRL939PE(10/5/15) TODD POWELL PO BOX 275 POWELL RENOVATIONS 22211 MARINE VIEW DR S TENINO WA 98589 TODD POWELL 22211 MARINE VIEW DR S Census Category: 101 -New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 24,973,751 0 0 0 Additional Permit Information New/Additional Sq.Feet-1st Floor 1475 New/Additional Sq.Feet-2nd Floor 1004 New/Additional Sq.Feet-3rd Floor 0 Occupancy#1 -Area(Sq.Feet) 24973751 New/Additional Sq.Feet-Basement 0 Basic Plan? No Occupancy#1-Construction Type. Type V-B New/Additional Sq.Feet-Deck 225 New/Additional Sq.Feet-Garage 686 Mechanical to be Included? Yes Plumbing Work Valuation? 10000 Occupancy#1-Class R-3 New/Additional Sq.Feet-Other 422 Plumbing to be Included? Yes New/Additional Sq.Feet-Total 3812 Occupancy#1 -Use Residence(1 or 2 family) Zoning Designation. RS 9.6 Plumbing Fixtures Bathtubs 1 Dishwashers 1 Laundry Washer Outlets 1 Lavatories 5 Showers 1 Sinks 1 Water Closets 3 Hose Bibbs 1 CONDITIONS: The northerly driveway approach and curb-cut shall be removed and replaced with standard curb and gutter. A City Right of Way Permit is required for this work-contact Kathleen Mathena at(253)835-2725 for the permit application materials. Mitigation payment required if utililty pavement cuts are needed in 8th&293rd. tb(t (i G. Se.6 L lu„1 1,1011 LG Plttc- Tb (notes TD S(Tr, oral 'ti pt', P-t rt-Is $b Ica ltie" o,-1 -c iii-W-4 i 4' ' . PE EXPIRES Sund0,Moven iOr 015 r '" • a Permit Issued on Tuese`a�', Jury a, 2015 e • I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington cl the City =ederal Way. Owner or agent: ' // dit a 6/V t Date: �Q/2/ J Cityof Federal Way Y Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that. at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff, Tenant Name: MARINE HILLS 12,LOT 1 Permit#: 15-101672-00-SF Address: 29305 8TH AVE S Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B , Occupancy Load: Floor Area(sq.ft.) 24,973,751 0 0 0 Owner Name: POWELL RENOVATIONS LLC Owner Address: POWELL RENOVATIONS TODD POWELL 0 22211 MARINE VIEW DR S l / w` 3115 / =uilding Official r'Q ate The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most sever!),affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. DATE INSPECTOR AREA AND TYPE t INSPECTION B-% 2- 1,� 0 . 'i t.c iji- 3 a,14 .11 131 10�,. THIS CARD IS TO MAIN ON-SITE . , cm, cr ok • Federal WayConstruction In ection RecordINSPECTION REQUE TS: (253)835-3050 PERMIT#: 15-101672-00-SF Address: 29305 8TH AVE S Project: POWELL RENOVATIONS LLC FEDERAL WAY, WA 98003-3736 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. O SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) 0 Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By t.j, iDate o Foundation Wall(4115) 0 Drainage/Downspout(4040) 0 Plumbing Groundwork(4190) Approved to place concrete Oppro�backfill Approved to cover By PM Date Sr(3 ( 15" By Date By Date O Slab/Concrete Floor(4255) ❑ Underfloor Framing(4285) 0 Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date Shear Walls(4245) 0 Roof Sheathing(4220) 0 Rough Plumbing(4230) Approve o install siding Approved to install roofing Approved rt^QriS Seem,;ryY r.. By Date B, ---2------__< Date ot__ t rl- 1 c By<x--ii., Date Lo / _C _ l O Mechanical Rough-in(4165) 0 Gas Piping(4125) ❑ Fire/Draft Stops(409 ) Approved Approved to release test Approved By PAZ. Date (a —q_is—S— By per, Date 10•—q_1 r- By Date ❑ Interim Erosion Control(4370) Framing(4120) Prior to scheduling a Framing inspection; Ei Approved Electrical,Plumbing&Mechanical Rough-in and Approved to insulate Fire/Draft Stop inspections must be signed-off and By Date approved. IBC 109.3.4 By Date O Insulation(4150) 0 Gypsum Wallboard Nailing(4130) 0 Final Erosion Control(4375) Approved to install wallboard Approved to install mud&tape Approved By �'` Sd... Date `b.,3 p_, . By �N4..... Date 1®-�-3T..1S' . By Date o Final-Mechanical(4065) 0 Final-Plumbing(4075) 0 Final-Building(4050) Approved Approved Approved By 0_,, ji Date-2..._`Q_% b By 4,0 Date 3115//l: By yg..N) Date 6115//h O Rough Electrical Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date i • RB Engineers Inc. 1312 2ND ST. KIRKLAND,WA.98033 PH: 425 8223009 FAX: 425 822 2679 CELL: 425 3512085 EMAIL: RBE1992 aC'7.GMAIL.COM JOB:MARINE HILLS- MH2 REVISION/FIELD CLARIFICATIONS BY: R.B./MJT DATE:10/12/2015 PAGE GI OF 2 STRUCTURAL REVISIONS/ FIELD CLARIFICATIONS POWELL HOMES MARINE HILLS-MH2 BASIS FOR DESIGN: CODE: INTERNATIONAL BUILDING CODE(2012EDITION) INDEX TO COMPUTATIONS: GENERAL G1 DETAIL/SKETCHES/NOTES SKI NOTE: THE STRUCTURAL ENGINEER IS NOT RESPONSIBLE FOR THE SITE, SOILS,EXISTING CONDITIONS,TRUSSES,ARCH. &WEATHER PROOFING IMPORTANT NOTE: INFO.NOT NOTED PER CITY APPROVED PLANS p�JIM) Tq,�� 1", Cr,. r; o4 1 ; JQ/ S'ONAL ;EXPIRES: Feb 20/6 i . ' , ' 1 t "li 4 ,z C r /z. ! . f W iy gv0 1 lir XT, W' •► TR •► ! �9 Z Q I1: E7 SW-6 � --•••••"-m" INDICATES SHEARWALL w/PLYWOOD ONE v p ni 1. SHEAIHIN4` ID"'MOOD OR ar0.S.B„ONE SIDE, BLOCKED.NAIL w/1 Z 42 6'0.C. ALL EDGES AND 12 0.0.FIELD. W N 11 1 Y , 2.BOLT SILL PLATE TO CONCRETE w/5/8 DIA. x 10'A.B.$•48'0.0. W K j \ `\\... 3. NAIL BOTTOM PLATE TO FRAMING BELOW w/16d O 4'0.C. Ce H Lim 4. FASTEN DOUBLE PLATE TO JOIST OR BLOCKING ABOVE PER DETAILS ON SI &S2 ICAPAC1TY: 240 LB/FTI SHEARWALL SCHEDULE 14 (SW-41 �� — -mr — INDICATES SHEARWALL w/PLYWOOD ONE SDE 1. SHEATHING: *- •LYW0o0 .S.B., ONE SIDE. BLOCKED.NAL w/ (�K 1I x r. ••-- 4'0.C. ALL AND 12'0.C.FIELD. 2.BOLT SILL PLATE TO CONCRETE w/5/8 DIA. x 10"A.B.'S O 32'0.0. 3. NAIL BOTTOM PLATE TO FRAMING BELOW w/16d 0 3'0.C. CO 4. FASTEN DOUBLE PLATE TO JOIST OR BLOCKING ABOVE PER DETALS ON SI &S2 I ICAPACTY: 350 LB/FTI � SW-3CICM< W -- — INDICATES SHEARWALL w/PLYWf1tY1 anE SOF, LATERAL 11,11 T PANELS. �/ 1. SHEATHING: PLYWOOD O'- ' O.SB..ONE SIDE.BLOCKED.NAIL w/ Q 3"0.0. ALL 'V AND 12"0.C. 'a ^ 2. BOLT DBL.SILL PLATE TO CONCRETE w/5/8 DIA.x 10'A.B.S O 12'0. _L.,.... ....,.. - 3. FASTEN DOUBLE PLATE TO JOIST OR BLOCKING ABOVE PER DETAILS ON SI &S2 (t 4. USE(2)2x STUDS 0 16"O.C. &SEE DETAIL 0/SI. 8. USE 3x ALL FRAMING MEMEBERS RECEIVING E.N. FROM ABUTTING PANELS i "0140 pis_ (CAPACITY: 450 L8/FTI \ ■ ■ B I- I►CI z... .1. Z C.. m , =1 I -,:►4.S B.PLYWOOD,INDEX 4D UOCKED,w/FACE GRAIN M •a'•7 1 CULAT TO FRAMINGrX 2 BELOW. NB- DU�i��1� DARY,OVER SHEARWALLS v NAIL AS FOLLOWS: .. • ;,' O 6'0.C. F- ALL SUPPORTED EDGES • r O 6"0.C. FIELD 12"O.C. \ M cr) TYPICAL FLOOR SHEATHING V/�/'3/4"TALC, 0.SB., INDEX 40-20.UNBLOCKED, LAID UP 1! //FACE GRAIN PERPENDICULAR TO FRAMING BELOW. STAGGER END JOINTS, GLUE&NAIL AS FOLLOW& DIAPHRAGM BOUNDARY AND OVER 8d AT 6'DC P1492,#) EXTERIOR WALLS, SHEARWALLS &DRAG STRUTS. ALL SUPPORTED EDGES 8d AT 6'CC FIELD ed AT 10'OC r _OPTION: USE 16 SCREWS 0 15"0.C, IN ADDITION TO NAILS SPECIFIED ABOVE 6 Z5--NOT11/ TEwoaLlJY//1 N RIM FILL ALL HOLES TM NAI•EX/T.WALLS w/(2)cs16 IS ,, .B '- 3 FILL ALL CALL NAILSSHALL /iLL�HOLDOWNS w/2 1 LONG x x.131 SHAW D148 SH(MINA '% DIA. NAILS. 23 11 4. ALL POWDER DRIVEN NAILS SHALL BE 2 A 10�+33/4'LONG(MIN.)x.156 i SHANK DIA. w/MINIMUM 1 1/4 PENETR 5. USE 10d x 2 1/8"LONG COMMON NAILS WHERE CALLED M!PLANS Y •RECEIVED a ��r;OP APR 0 8 2015__s__PERMIT PPLICATION i Federal Way , 4�' CITY OF FEDERAL WAY / CDS PERBUT NUMBER I i - O / /� Z_ � TARGET DATE 5 �-S / c SITE ADDRESS LSUITE/UNIT# 2A-2,0 S . so. < W P� PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $ 2p0,000- vo 5 \ TYPE OF PERMIT ,BUILDING.PLUMBING MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT 1 i ` -7_. PROJECT DESCRIPTIONSt Detailed description of work to -7 O&irvv` C be included on this permit only P\ eQ 2!_ \ oretLoyG NO S .pr NAME ` � - �n^y,�n PRIMARY PHONE PROPERTY OWNER VY \C-C- k\--o �kes MAILING ADDRESS E-MAIL j, CITY STATE ZIP PHONE NAME Ya4 .31a. 200- 423_ Z25‘ MAILING ADDRESS /� ` E-MAIL i` CONTRACTOR ZZ��� ��I �LR�r�Y�rC. V� � Q� kD&&�' °C'�IvJ2\\ k‘OiMeS.(p�. \�..... CITY STAc/iS NAo‘�e� LT ZIP FAX WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# PRIMARY NAME � V'T IJV Vim* A. � iM�� 3Ul0 PHONE 0. `0D5 MAILING ADDRESS E-MAIL APPLICANT V.0- 2 Z'-6 impek-SOVI p wtiS, CITY STATE ZIP FAX '�0. COM "(-Qsl•Avv) V, (31.2)S$ NAME . PRIMARY PHONE PROJECT CONTACT � -1.oV•/•-v��-• .2)I1+0- 'Ot X05 (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence .® . %C Z -kkz �eks0M04r).-vv.v\s.tAi concerning this application) QTY �0 ZIPSTATE FAX q b512, NAME PROJECT FINANCING ® cOWNER-FINANCED Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorised agent of the property owner.I certify that to the best of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information suppli o the city as a part of this application. SIGNATURE: , `® DATE S/ 1 PRINT NAME: \(L VQ J\ V Bulletin#100-January 1,2013 Page 1 of 3 k:\Handouts\Permit Application - 11111 • • VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. / AIR HANDLING UNITS S FANS GAS PIPE OUTLETS OTHER(Describe) KO AIR CONDITIONER k FIREPLACE INSERTS HOODS(Commercial) BOILERS FURNACES t HOT WATER TANKS(Gas) COMPRESSORS GAS LOG SETS 16 REFRIGERATION SYST DUCTING \ GAS PIPING Bf WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of re to be installed or relocated as part of this project. Do not include existing fixtures to remain. ( BATHTUBS(or 1Lb%shower Combo) LAVS(Hand sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS 9t. URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS l SINKS(Kitchen/Utility) . WATER HEATERS(electric) HOSE BIBBS Cijf SUMPS ( WASHING MACHINES l ) TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS EXISTING/PREVIOUS USE LOT SIZE(Ia Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? 19 ❑Ye&, Ao ❑Yes S No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT 0 Or FIRST FLOOR(or Mobile Home) \L+' 41-5t SECOND FLOOR t:), tea COVERED ENTRY (n 0 DECK 2ti GARAGE CARPORT 0 (1,4 t$ OTHER(describe), ' c� 2?i 1 EXISTIPIGu Area Totals **Nidi HOMESY* ONL " / ESTIMATED SELLING PRICE$ SD v/OO 0 # OF BEDROOMS COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area OccupancyConstruction #of Additional Information in Square Feet Group(s) Type Stories NEW BUILDING ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square FeetType Stories TOTAL BUILDING TENANT AREA ONLY PROTECT AREA ONLY Bulletin#100—January 1,2013 Page 2 of 3 k:\Handouts\Perrnit Application FIGURE C2.2.0 TYPICAL DRYWELL INFILTRATION SYSTEM �--Roof Downspout House i Roof flow Downspout House Downspout Splash Block SECTION 5, TOWNSHIP 21 NORTH, RANGE 4 EAST, W.M. POWELL MH2 SANITARY MANHOLE CATCH BASIN, TYPE t RIM=312.56 RtM=391.44 � FOUND BAR & CAP tE=306.86 72" PCP (E) � IE=301.66 8"(E) APPROX. "DRYCO J4145° tE=306.84 18" RCP(N) E-307.53 8°(W) � FIRE HYDRANT L-59.&i' f2=3/9.zo --� _ 68,92" S'L� C- ,� GRADE TO PROVIDE POSITIVE - - - �- - s I - - 9�5 FINISH GRADE SURFACE DRAINAGE AWAY FROM 310 1 CONTOUR, TYP CATCH BASIN, TYPE I BASEMENT LEVEL TO SW 293RD ST -- -._ 20 STREET �� RIM=311.80 SETBACK �G 3�� o_ ( IE=308.90 12" RCP(N) .36USHi 1 a -- 314 E=308.60 12'" RCP(VI) SITE BENCHMARK ® FOUND 'BAR, & G?1P ° I RFBAR & CAP \ "DRYCq 3414f, ' FOUND 3/4" BRASS PLUG "DRYCO 5" 25 A — —III // 3X3. ?0' � ONF PUNCH IN CONIC. IN CASE LEV.=30 .6 -SET SEACK l DOWN 1. 1' a — 3�t 4' �a 316 ' 8'xl5'x6' DEEP DRYWELL a C / I ` ` -� } I ' Ui C. LOT 1 t 3t6 LOT 6 AX PARCEL 1 / 't' TAX PARCEL ttMAIL 152800180 + ' GAA� BOX ' 5152800230 TAX PARaEL BASEMENT F11 = 30 .Ot a' al 18 515?_7001�0 MAIN' FF =17.83 r 312 `d C WALL LINE ' 314 �\ \ ' rEAVE LINE < ` :: , , , .a ` . VO FULL tNFfLTPATION 5.22'� C DRIVEWAY CON . USE EX CURB CUT. 0 Catch Basin W 7.03� 7.5' SIDE ' F-0 B�R &CAI (Yard Drain) �� SETBACK, / `ORYCQ 34145" ' TAX PARCEL 0 4' 5152700130 APPROX ADJACENT BUILDING, TYP. FOUND BAR & CAP ' _ DRY WELL PLAN VIEW NTS flow ' Fine Mesh Screen Catch Basin (Yard Drain) -15' min, DRY WELL SECTION NTS 2009 Surface Water Design Manual— Appendix C LIMITED INFIL Min. 4" dia. PVC Pipe C47 NTS ides of Liner Filter F 46 inc>Oiameter "DRYCO 34145" GRAPHIC SCALE Hole Filled with ` 20 0 10 20 40 80 ' 1112-3"Washed i Drain Rock NOTE: DRYWELL SIZE SHALL BE AS CALLED OUT IN PLAN VIEW Mark Center of Hole with 1" Capped PVC or Other means Topsoil flush with Surface 1' min. Varies 48 Inch Diameter Hole Filled with 1112-3" Washed Drain Rock 1/9/2009 ■ ■ ( IN FEET ) i" = 20' (22a34) I" = 40' (ID117) ■ ■ r CONTACT INFORMATION APPLICANT: POWELL CUSTOM HOMES & RENOVATIONS 22211 MARINE VIEW DRIVE S DES MOINES, WA 98198 CONTACT: TODD POWELL 206-824-8001 ENGINEER: DUNCANSON COMPANY, INC 145 SOUTHWEST 155TH STREET, #102 SEATTLE, WA 98166 CONTACT: HAROLD DUNCANSON 206-244-4141 SITE INFORMATION SITE LOCATION: 799 S 293RD STREET FEDERAL WAY, WA 98003 PARCEL NUMBER: 5152800180 SITE AREA: 14,845 SF ZONING: RS9.6 EXISTING BUILDING COVERAGE: 0 SF NEW LOT COVERAGE: 3,751 SF TOTAL BUILDING COVERAGE: 3,751 SF (257.) DISTURBED AREA: 11,600 SFf APPROX CUT: 100 CY APPROX FILL: 350 CY UTILITY INFORMATION WATER: LAKEHAVEN SEWER: LAKEHAVEN FIRE: SOUTH KING FIRE & RESCUE SCHOOL: FEDERAL WAY SCHOOL DISTRICT ELECTRICITY: PSE GAS: PSE PHONE: CENTURYLINK OR XFINITY CABLE: COMCAST PROJECT DESCRIPTION CONSTRUCT A NEW 2,800 SF SINGLE FAMILY HOUSE, GENERAL NOTES 1. ALL WORK SHALL CONFORM TO THE CITY OF FEDERAL WAY REQUIREMENTS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION. 2. ALL DETAILS & CONSTRUCTION SHALL BE PER THE 2009 KING COUNTY SURFACE WATER DESIGN MANUAL AS ADOPTED BY THE. CITY OF FEDERAL WAY APPENDIX C. A COPY OF APPENDIX C SHALL BE ON -SITE WHENEVER WORK IS IN PROGRESS. APPENDIX C IS AVAILABLE ON-LINE AT: http: //your. kingcounty.gov/dnrp/library/water-and-land/ storm water/surface- water- design -manual/appendix-c.pdf 4. SLOPE GROUND AWAY FROM BUILDING AT 2%-MIN FOR 5 FEET. GRADE TO AVOID PONDING OR LOWSPOTS, 5. LOCATION OF EXISTING UTILITIES MAY BE APPROXIMATE AND OTHER UTILITIES MAY EXIST. FIELD VERIFY. TERMINATE, CAP, EXTEND AND RECONNECT TO EXISTING UTILITIES IN ACCORDANCE WITH PROVIDER REQUIREMENTS. 6. CONTACT DUNCANSON COMPANY IF ANY CONFLICTS ARE DISCOVERED THAT MAY NECESSITATE CHANGES TO THE WORK. SHEET INDEX C1 SITE & DRAINAGE PLAN C2 TESC/SWPPP PLAN TREE NOTE NO SIGNIFICANT TREES EXIST ON THE SITE. NONE PROPOSED FOR REMOVAL ' RECEIVED APR 0 8 201 > r Y OF FEDERAL WAY CDs BENCHMARK IS "ZSE1" NGS GPS CORS STATION. ELEV = 343.3' Know what's below. Call 48`hours ,before you dig. DUNCANSON Company, Inc. 145 SW 155th Street, Suite 102 Seattle, Washington 98166 Phone 206.244.4141 Fax 206.244,4455 1 ■ i • U. r♦ I � DATE: }� Y r 1 OF 2 SHEETS Cr X:\PROJECTS\2015 PROJECTS\15340POWELL MH2\15340 C3D\15340 MODEL.DWG