Loading...
09-103389 • • Mechanical City of Federal Way Community Development Services FILEPermit #: 09-103389-00-MEP.O.Box 9718 Federal Way, Fax (253 9718 835- Inspection Request Line: (253) 835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p a Project Name: STWAN Project Address: 33339 10TH CT SW Parcel Number: 926496 0960 Project Description: Replace gas 90k btu furnace and install 3 ton heat pump Owner Applicant Contractor STEVEN STWAN CYNDAL MILLHOLLIN WASHINGTON ENERGY SERVICES CO REBECCA JANE STWAN NORTHWEST PERMIT INC/WASHINGTON (GENERAL) 33339 10TH CT SW ENERGY SERVICES WASHIES971OB(9/2/09) FEDERAL WAY WA 98023-5312 1345 W GULF RD 2800 THORNDYKE AVE W POINT ROBERTS WA 98281 SEATTLE WA 98199 • AdditionalAddJtiortakPermItififormation Mechanical Valuation 9898.00 Is this an Online or O.T.C.application Yes • lechanical i t s , Compressors/Heat Pumps 1 Furnaces " 1 PERMIT EXPIRES Monday, March 1, 2010 Permit Issued onWednesday,September 2, 2009 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington ON end the Cit 4 f Federal Way. Owner or agent: Date: 4:111 /04 0 itti/ - . THIS CARD IS TO F AIN ON-SITE - CITY OF FicE Construction In ction Record Federai Way INSPECTION REQUE TS: (253) 835-3050 PERMIT #: 09-103389-00-ME Address: 33339 10TH CT SW Owner: STEVEN STWAN FEDERAL WAY, WA 98023-5312 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in (4165) El Gas Piping(4125) ❑ Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date 0 _ a1...._‘ 6 El Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date