Loading...
16-104701 0 • . Electrical City of Federal Way Permit #:16-104701-00-EL Community Development Dept. 33325 8th Ave S ' F _ Federal Way,WA 98003 Inspection Request Line: (253)835 3050 Ph:(253)835-2607 Fax (253)835-2609 Project Name: FABIO'S FRAME SHOP Project Address: 31843 GATEWAY CTR BLVD S Parcel Number:092104 9137 Project Description: Install new electrical circuits for tenant space Owner Applicant Contractor ANS LLC SCOTT MANNINGSKYLINE ELECTRIC SKYLINE ELECTRIC SERVICES LLC PO BOX 1941 SERVICES LLC SKYLIES872D6(3/27/17) AUBURN WA 98071 627 S HAWTHORNE ST 627 S HA 627 S HAWTHORNE ST TACOMA WA 98465 TACOMA WA 98465 Additional Permit Information Is this an Online or O.T.C.application? No � r m;���,�E�E !,, E� ,����xh�°.,a, r�r. ���� i c � ✓� x�: .,i� �?�,���5�76x6�".��e��E �, Circuits-Commercial 6 PERMIT EXPIRES Saturday,7 October,2017 Permit Issued on Friday,October 7,2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: .�',/, .cIJLI . . .�i. � /, / f t‘NI f1/4 1St) THIS CARD IS TO REMAIN ON-SITE � � Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 16 104701 00 Address: 31843 GATEWAY CTR BLVD S Project: A N S LLC FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. • ,� UFER Ground(4295) `,® Ditch cover(4030) 'f Q Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date ® Pool Bonding(4195) Temporary Power(4275) © Service(4235) Approved Approved Approved By Date By Date1 By Date ® Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020) Approved Approved Approved .By Date ,,�By/0.-7—�(o Dat. , 4 ,, �0ik• �.By Date Final-Electrical(4055) 4 r `` Approved By Date IL � 0 Rough Electrical 0 Final Electrical 0 Right of Way Approved Approved Approved By Date By Date By Date L.. • J Electrical City of Federal way FILE Permit #:16-104701-00-EL Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: FABIO'S FRAME SHOP Project Address: 31879 GATEWAY CENTER BLVD S Parcel Number:092104 9137 Project Description: Install new electrical circuits for tenant space Owner Applicant Contractor AN S LLC SCOTT MANNINGSKYLINE ELECTRIC SKYLINE ELECTRIC SERVICES LLC PO BOX 1941 SERVICES LLC SKYLIES872D6(3/27/17) AUBURN WA 98071 627 S HAWTHORNE ST 627 SHA 627 S HAWTHORNE ST TACOMA WA 98465 TACOMA WA 98465 Additional Permit Information Is this an Online or O.T.C.application9 No Circuits-Commercial 6 PERMIT EXPIRES Saturday,7 October,2017 Permit Issued on Friday,October 7,2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 1.. I E Date: • III _ { THIS CARD IS TO REMAIN ON-SITE FederalFOI I Construction Inspection Record Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 16 104701 00 Address: 31879 GATEWAY CENTER BLVD S Project: A N S LLC FEDERAL WAY WA 98003- Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ,0 UFER Ground(4295) '� Ditch cover(4030) •,Q Slab/Concrete Floor(4255) , Approved Approved Approved to place concrete By Date By Date . By Date • ,® Pool Bonding(4195) •�� Temporary Power(4275) `�® Service(4235) Approved Approved Approved By Date By Date By Date •ILI Feeders/Sub-panels(4045) ® Rough Electrical(4225) - El Ceiling Cover(4020) Approved Approved Approved •By Date - ICS Date (() _ 7_ \(p By Date • final-Electrical(40 5) Approved (0,B �/ Date ►0 0 El Rough Electrical El Final ElectricalElRight of Way Approved Approved Approved By Date By Date By Date ,