Loading...
12-102128 0 LlectricaI City of Federal Way Permit #: 12-102128-00-EL Community&Econ.Dev.Services FILE33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (2 53)(253)835-2607 Fax (253)835-2609 p q 835-3050 Project Name: COSTCO GAS STATION Project Address: 35100 ENCHANTED PKWY S Parcel Number: 219260 0290 Project Description: Install 30 Amp 208 Circuit For New Air Door At'Entrance Owner Applicant Contractor WHOLESALE CORP COSTCO KAREN HANSON BOYER ELECTRIC 999 LAKE DR BOYER ELECTRIC BOYEREC101LE(6/5/12) ISSAQUAH,WA 98027 830A N 127TH ST 830A N 127TH ST SEATTLE WA 98133 SEATTLE WA 98133-8030 Additional Permit Information Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Circuits-Commercial 1 PERMIT EXPIRES Thursday, May 15, 2014 Permit Issued on Tuesday, May 15, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington , .• th Federal Way. 4 Owner or agent: II - » ��"""" Date: 4..., ,..y. ,,,,........,__(____Th 5fitoil L r THIS CARD IS TO MAIN ON-SITE CY OF {. IT ,• i Federal WayConstruction I ection Record INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-102128-00-EL Address: 35100 ENCHANTED PKWY S Project: WHOLESALE CORP COSTCO FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground (4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date . . . . . 0 Pool Bonding(4195) 0 Temporary Power(4275) ' 0 Service(4235) Approved Approved Approved By Date By Date By Date ,0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225) �El Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date .El Final-Electrical(4055) Approved By ,•j Date S-k tz.1'. , ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date