12-102292 •
Electrical
City of Federal ay
Community&Econ.DevV Services #: 12-102292-00-EL
Way,
333258th Ave S F ' Permit
Federal Wwa 98003 Inspection Request Line: 2531}835-3050
Ph:(253)835-2607 Fax (253)835-2609 p a
Project Name: COSTCO GAS STATION
Project Address: 35100 ENCHANTED PKWY S Parcel Number: 219260 0290
Project Description: Adding/altering(3)circuits to upgrade existing additive dispensing system to automatic
•
Owner Applicant Contractor
WHOLESALE CORP COSTCO MICHELLE MARVIN INTERIOR ELECTRIC INC
999 LAKE DR INTERIOR ELECTRIC INTEREI003CP(2/17/14)
ISSAQUAH,WA 98027 21428 167TH AVE SE 21428 167TH AVE SE
MONROE WA 98272 MONROE WA 98272
Additional Permit information
Is Use Educational or Institutional? No Service greater than 999 Amps? No
",,, Electrical Fixtures
Circuits-Commercial 3
PERMIT EXPIRES Friday, May 23, 2014
Permit Issued on Wednesday, May 23, 2012
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: rNE
Date:
` (tt/t SA Z
DATE INSPECTOFAREA AND TYPE C INSPECTION
THIS CARD IS TO MAIN ON-SITE
CITY OF 110 Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 12-102292-00-EL Address: 35100 ENCHANTED PKWY S
Project: WHOLESALE CORP COSTCO FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground (4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By �� Date By Date
. 1,,-'I '‘ 2__
❑ Pool Bonding(4195) ❑ Temporary Power(4275) El Service(4235)
Approved Approved Approved
By Date By Date By Date
El Feeders/Sub-panels(4045) 0 Rough Electrical(4225) '0 Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
.
❑ Final-Electrical(4055)
Approved
B}C Date L_1 y -I_
'
❑ Rough Electrical El Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date