09-103530 veq(p Erectrical
City of Federal Way Q
Community Development Services Permit #: 09-103530-00-EL
P.O.Box 9718
Federal Way,WA 98063-9718
Inspection Request Line: (253)
Ph:(253)835-2607 Fax (253)835-2609 FILE p q 835-3050
Project Name: WEST CAMPUS BUSINESS PARK
Project Address: 33650 6TH AVE S SUITE 102 Parcel Number: 926480 0210
Project Description: PSE Lighting Retro-fit of 85 troffers
Owner Applicant Contractor
SUNLIFE ASSURANCE CO OF CANADA MICHAEL ROSS SOUTHGATE ELECTRIC INC
600 UNIVERSITY ST SUITE 1028 Southgate Electric SOUTHEI366P1(8/30/11)
SEATLTE WA 98101 23444 30 AVE S SUITE 101 23444 30TH AVE S
FEDERAL WAY WA 98032 KENT WA 98032
Additional Permit In tib �`
Is Use Educational or Institutional? No Service greater than 1000 Amps? No
, tie lectrical Fi y
Circuits-Commercial
PERMIT EXPIRES Tuesday, September 14, 2010
Permit Issued on,Monday, September 14,2009
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy arid the use will be in accordance with the laws, rules and regulations of the State of ashingto
and the City of Federal Way.
Owner or agent: � L,/AIe Date: /y ey
oq
ibliql
THIS CARD IS TO REMAIN ON-SITE _
"" Construction I ection Record
CITY R� ' -' �.,_y>,<-�"
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT#: 09-103530-00-EL Address: 33650 6TH AVE S SUITE 102
Owner: SUNLIFE ASSURANCE CO OF CAr FEDERAL WAY, WA 98003-6754
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right.top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
CI UFER Ground (4295) ❑ Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
o Pool Bonding(4195) ❑ Temporary Power(4275) ❑ Service(4235)
Approved Approved Approved
By Date By Date By Date
o Feeders/Sub-panels(4045) El Rough Electrical(4225) ❑ Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
El Final-Electrical(4055)
Approved
B'S(C) Date(e) (3.vs
El Rough ElectricalCI Final Electrical CI Right of Way
Approved Approved Approved
By Date By Date By Date