Loading...
11-102930 Electrical City of Federal Way w' E • Community Development Services Permit #: 11-102930-00-EL P.O.Box 9718 Federal Way,WA 98063-9718 t Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax (253)835-2609 p q Project Name: ST PAUL TRAVELERS Project Address: 33650 6TH AVE S Suite 200 Parcel Number: 926480 0210 Project Description: Misc.Power and Lighting For Travelers(10)circuits Owner Applicant Contractor SUNLIFE ASSURANCE CO OF CANADA ERIC OLSEN D P INC GENERAL CONTRACTORS 600 UNIVERSITY ST SUITE 1028 OLSEN ELECTRIC DPINCGC066BU (1/31/12) SEATLTE WA 98101 718 N GRIFFIN AVE#215 19909 BALLINGER WAY NE SUITE 101 ENUMCLAW WA 98022 SEATTLE WA 98155 Is Use Educational or Institutional? No Service greater than 999 Amps? No Circuits-Commercial 10 PERMIT EXPIRES Friday, July 20, 2012 Permit Issued on Thursday, July 21, 2011 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington i :INtand the City Federal Way. Owner or agent: r/ Date: 4q FW!',Y Slig/i1 THIS CARD IS T MAIN ON-SITE « °F II Construction I ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 11-102930-00-EL Address: 33650 6TH AVE S Suite 200 Project: SUNLIFE ASSURANCE CO OF CAN FEDERAL WAY, WA 98003-6754 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground (4295) El Ditch cover(4030) -El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date o Pool Bonding(4195) El Temporary Power(4275) El Service(4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels(4045) El Rough Electrical(4225) ❑ Ceiling Cover(4020) Approved Approved Approved By Date By Qi'i-a- Date r- _a,,,,_�, By ,4 �, Date ❑ Final-Electrical(4055) Approved By is Dated,-79//. FILE El Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date