11-104367 City of Federal Way •
FIlE • E'iect ical
Community Development Services Permit #: 11-104367-00-EL
P.O.Box 9718
Federal Way,WA 98063-9718
Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050
Project Name: CHRISTINE ALEXANDER
Project Address: 34210 9TH AVE S Suite 110 Parcel Number: 926480 0090
Project Description: HOOK UP 480V HEATER& INSTALL(2)METAL HALLIDE FIXTURES
Owner Aaalicant Contractor
FEDWAY GROUP LLC CHERIE OWENS MERIDIAN CENTER ELECTRIC INC
26821 SE 22ND CT MERIDIAN CENTER ELECTRIC MERIDCE3I85G(2/28/13)
SAMMAMISH WA 98075 11109 E 66TH AVE 11109 66TH AVE E
PUYALLUP WA 98373 PUYALLUP WA 98373
Ark YNINAL,AitriZZTr
Is Use Educational or Institutional9 No Service greater than 999 Amps? No
� '�� � n •> s ' � � .sem f� �,iy. ,: �� �.:$ � z
Circuits-Commercial 2
PERMIT EXPIRES Friday, October 26, 2012
Permit Issued on Thursday, October 27, 2011
hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
ONL. I1I
Ederal Way.Owner or agent: ��
Date. ��'
i1 11
THIS CARD IS TO MAIN ON-SITE
CITY OF • Construction In ection Record
Federal Way INSPECTION REQUE TS: (253) 835-3050
PERMIT#: 11-104367-00-EL Address: 34210 9TH AVE S Suite 110
Project: FEDWAY GROUP LLC FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
LIFER Ground (4295) 0 Ditch cover(4030) -IDSlab/Concrete Floor(4255)
CIApproved Approved Approved to place concrete
By Date By Date By Date
• ' Tem ora Power • '
CI Pool Bonding(4195) 0 p ppr (4275) 0 Service(4235)
Approved Approved Approved
By Date By Date By Date
`
Feeders/Sub-panels(4045) 0 Rough Electrical(4225) 0 Ceiling Cover(4020)
ElApproved Approved Approved
By Date By Date By Date
Final-Electrical(4055)
Approved
By Date \\fi_lit
r
Rou h Electrical Final Electrical
DI
Right of Way
❑ Approved IIIElectricalApproved
By Date By Date * By Date