Loading...
10-101241 Building - Single Famity City of Federal Way Community Development Services Permit ermil. #: 10-101241-00-SF P.O.Box 9718 Federal Way,WA 98063-9718 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050 Project Name: DANG Project Address: 30040 MILITARY RD S Parcel Number: 042104 9147 Project Description: ADD-Construct 256 square foot deck. ' Owner Anolicant Contractor Lender HUN C DANG HUN C DANG OWNER IS CONTRACTOR HUN C DANG HUN C DANG 2354 WALNUT RD N 2354 WALNUT RD N OLYMPIA WA 98502-4107 OLYMPIA WA 98502-4107 l Census Category: 434 -Residential alt/add-no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq ft.) 0 0 0 0 New/Additional Sq.Feet-1st Floor.. 0 New/Additional Sq.Feet-2nd Floor......: .........0 New/Additional Sq.Feet-3rd Floor 0 New/Additional Sq.Feet-Basement 0 New/Additional Sq.Feet-Deck 0 New/Additional Sq.Feet-Garage 0 Mechanical to be Included? No New/Additional Sq.Feet-Other 0 Plumbing to be Included? No New/Additional Sq.Feet-Total 0 Zoning Designation RS 7.2 : ,' PERMIT EXPIRES Monday, September 27, 2010 Permit Issued on Wednesday, March 31, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: X 3 3 I I 0 Date: A V : fi--C. D d kkiliTHIS CARD IS TO REMAIN ON-SITE CITY 4F Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 10-101241-00-SF Address: 30040 MILITARY RD S Owner: HUN C DANG FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) 0 Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date ,By , l> .> Date S—[(:1— 1'l, , Foundation Wall(4115) 0 Drainage/Downspout(4040) Slab/Concrete Floor(4255) Approved to place concrete Approved to backfill Approved to place concrete By Date By Date By Date Underfloor Framing(4285) 0 Floor Sheathing(4105) Shear Walls(4245) Approved to sheath floor Approved to install flooring Approved to install siding By Date By Date By Date Roof Sheathing(4220) 0 Fire/Draft Stops(4095) ❑ Interim Erosion Control(4370) Approved to install roofing Approved Approved By Date By Date By Date Framing(4120) El Insulation (4150) Prior to scheduling a Framing inspection; Approved to insulate Approved to install wallboard Electrical,Plumbing&Mechanical Rough-in and Fire/Draft Stop inspections must be signed-off and By Date By Date approved. IBC 109.3A 0Gypsum Wallboard Nailing(4130) 0 Final Erosion Control(4375) Final-Building(4050) Approved to install mud&tape Approved Approved By Date By Date By Date Rough Electrical Final Electrical ❑ Rightpd oofeWay Ap❑ Approved ❑ Approved By Date By Date By Date