Loading...
16-102014 0 . S Uect ical City of Fedel Comm n ty&Econ.�Devv..ay Services Permit #: 16-102014-00-EL 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax (253)835-2609 p FILE Inspection Request Line: (253)835-3050 : Project Name: COSTCO FUELING STATION g 444 Project Address: 35100.ENCHANTED PKWY S Parcel Number: 219260 0290 Project Description: GAS STATION:Install(1)3-pole ckt for Vapor Machine at tank area. Owner Applicant Contractor COSTCO WHOLESALE CORP MICHELLE MARVIN INTERIOR ELECTRIC INC 999 LAKE AVE DR SUITE 201 INTERIOR ELECTRIC INTEREI003CP(2/17/18) ISSAQUAH WA 98027 21428 167TH AVE SE 21428 167TH AVE SE MONROE WA 98272 MONROE WA 98272 Additional Permit Information Electrical Work Valuation? 2500.00 Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Circuits-Commercial 3 PERMIT EXPIRES Thursday, April 27, 2017 Permit Issued on Wednesday,April 27, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE Date: k- THIS CARD IS TO MAIN ON-SITE ` 'OF 'Cotistruction I ection Record r,. ,,F@d@rdf Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 16-102014-00-EL Address: 35100 ENCHANTED PKWY S Project: COSTCO WHOLESALE CORP FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. LIFER Ground (4295) Ditch cover O A roved 0 (4030) ❑ Slab/Concrete Floor(4255) pp Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding(4195) ❑ Temporary Power(4275) ❑ Service(4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) 0 Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date ❑ Final-Electrical(4055) Approved By C `s ,,,3 Date r1 - 2.,2„,,i (o ❑ Rough Electrical CI Electrical El Right of Way Approved Approved Approved By Date By Date By Date