16-102014 0 . S Uect ical
City of Fedel
Comm n ty&Econ.�Devv..ay Services Permit #: 16-102014-00-EL
33325 8th Ave S
Federal Way,WA 98003
Ph:(253)835-2607 Fax (253)835-2609 p FILE
Inspection Request Line: (253)835-3050
:
Project Name: COSTCO FUELING STATION
g 444
Project Address: 35100.ENCHANTED PKWY S Parcel Number: 219260 0290
Project Description: GAS STATION:Install(1)3-pole ckt for Vapor Machine at tank area.
Owner Applicant Contractor
COSTCO WHOLESALE CORP MICHELLE MARVIN INTERIOR ELECTRIC INC
999 LAKE AVE DR SUITE 201 INTERIOR ELECTRIC INTEREI003CP(2/17/18)
ISSAQUAH WA 98027 21428 167TH AVE SE 21428 167TH AVE SE
MONROE WA 98272 MONROE WA 98272
Additional Permit Information
Electrical Work Valuation? 2500.00 Is this an Online or O.T.C.application? Yes
Is Use Educational or Institutional? No Service greater than 999 Amps? No
Electrical Fixtures
Circuits-Commercial 3
PERMIT EXPIRES Thursday, April 27, 2017
Permit Issued on Wednesday,April 27, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ONLINE Date:
k-
THIS CARD IS TO MAIN ON-SITE
` 'OF 'Cotistruction I ection Record r,. ,,F@d@rdf Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 16-102014-00-EL Address: 35100 ENCHANTED PKWY S
Project: COSTCO WHOLESALE CORP FEDERAL WAY, WA 98003
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
LIFER Ground (4295) Ditch cover
O A roved 0 (4030) ❑ Slab/Concrete Floor(4255)
pp Approved Approved to place concrete
By Date By Date By Date
❑ Pool Bonding(4195) ❑ Temporary Power(4275) ❑ Service(4235)
Approved Approved Approved
By Date By Date By Date
❑ Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) 0 Ceiling Cover(4020)
Approved Approved
Approved
By Date By Date By Date
❑ Final-Electrical(4055)
Approved
By C `s ,,,3 Date r1 - 2.,2„,,i (o
❑ Rough Electrical CI Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date