Loading...
13-100764 , _• Electrical City of Federal Way ' x Permit #: 13-100764-00-E L Community&Econ.alDev.W Services 33325 8th Ave S Federal Way,WA-98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax (253)835-2609 p q Project Name: WYNSTONE EAST LOT 78 Project Address: 1026 SW 339TH ST Parcel Number: 957850 0780 Project Description: 200 AMP NEW SERVICE/SF 3400 Owner Applicant Contractor QUADRANT CORPORATION KIM FRIANT MERIDIAN CENTER ELECTRIC INC 14725 SE 36TH ST SUITE 100 MERIDIAN CENTER ELECTRIC MERIDCE318SG(2/28/15) BELLEVUE WA 98006 11109 66TH AVE E 11109 66TH AVE E PUYALLUP WA 98373 PUYALLUP WA 98373 • Additional Permit Information Is this an Online or O.T.C.application Yes Is Use Educational or Institutional? No Electrical Fixtures New Service:Residential 1 Thermostat 1 PERMIT EXPIRES Thursday, February 19, 2015 Permit Issued on Tuesday, February 19, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONlINE Date: `% Y THIS CARD IS TO MAIN ON-SITE CITY OF • Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-100764-00-EL Address: 1026 SW 339TH ST Project: QUADRANT CORPORATION FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. O UFER Ground (4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By y Date By Date By Date O Pool Bonding(4195) El Temporary Power(4275) 0 Service(4235) Approved Approved Approved. By Date By Date By Date O Feeders/Sub-panels(4045) El Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By —CS Date 4.4.0,( -2 By Date ❑ Final-Electrical(4055) Approved l?,117S Date - Z e.,0 El Rough Electrical Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date