13-100871t
I" of gederal Y+3ay
CoAmiunity & Ecen. Dev. Services
3332e 8th Ave S
Federal Way, WA 98003
Ph: (253) 835-2807 Fax: (253) 835-2609
' Building = SinghFamily
r
Permit #: 13-100871 WOO -SF
_
t e
+WJ Inspection Request Line: (253) 835-3050
Project Name: WYNSTONE EAST LOT 51
Project Address: 806 SW 338TH ST
Parcel Number: 957850 0510
Project Description: NEW - Construction of a 2,655 square foot, 2 -story, single-family residence with a 55
square foot covered entry and a 737 square foot attached garage. Includes plumbing &
mechanical.
***4 Bedrooms; $250,000 estimated selling price**
Owner
Applican
Contractor
Lender
LENNAR NORTHWEST INC
LENNAR NORTHWEST INC
LENNAR NORTHWEST INC
OWNER IS LENDER
2103 NE 129TH ST UNIT 100
2103 NE 129TH ST UNIT 100
LENNANIS93QG (11/7/13)
Occupancy # I -Use ...............................................
VANCOUVER WA 98686
VANCOUVER WA 98686
2103 NE 129TH ST UNIT 100
VANCOUVER WA 98686
Census Category: 101- New Single Family House
Includes:
#1 #2 #3 #4
Occupancy Class:
R-3
Construction T
Type V -13
Occupancy Load:
737
Floor Areas . R.
3,392 0 0 0
Additional Permit Information
New / Additional Sq. Feet - 1 st Floor....................1067
New / Additional Sq. Feet - 3rd Floor....................0
New / Additional Sq. Feet - Basement...................0
Occupancy # 1 -Construction Type ........................Type V - B
New / Additional Sq. Feet - Garage .......................
737
Occupancy # 1 - Class.............................................R-3
Plumbing to be Included? ......................................
Yes
Occupancy # I -Use ...............................................
Residence (1 or 2
family)
New / Additional Sq. Feet - 2nd Floor...................1588
Occupancy #I - Area (Sq. Feet).............................3392
BasicPlan?........................................................... No
New / Additional Sq. Feet - Deck .......................... 0
Mechanical to be Included?...................................Yes
New / Additional Sq. Feet - Other .......................... 55
New / Additional Sq. Feet - Total .......................... 3447
Zoning Designation. ............................................... RM 3600
Mechanical Fixtures
Air Handling Units ......................... 1 Ducting ........................................... 1 Fans................................................ 6
Fireplace Inserts ............................. 1 Furnaces......................................... 1 Gas Piping ......................................
Gas Pipe Outlets ............................. 5 Hot Water Tanks............................ 1
Plumbing Fixtures
Bathtubs ......................................... 2 Dishwashers................................... 1 Laundry Washer Outlets................ 1
Lavatories....................................... 5 Showers.......................................... 3 Sinks............................................... 1
Water Closets ................................. 3 Hose Bibbs..................................... 2
Sales office to be removed prior to home receivinj
occupancy of temporary sales office.
of Occupancy. Home to be finalled prior to
PERMIT EXPIRES Wednesday, October 9, 2013
Permit Issued on Friday, April 12, 2013
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and �theity of Federal Way.
Owner or agent: Date:
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that
at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building
construction or use. This certificate is valid ONLY when endorsed by City staff.
Tenant Name: WYNSTONE EAST LOT 51 Permit #: 13 -100871 -00 -SF
Address: 806 SW 338TH ST
Includes:
#1 #2 #3 #4
Occupancy Class:
R-3
Construction Type:
Type V - B
Occupancy Load
Floor Area (sq. ft.) 1
3,392 1 0 0 0
Owner Name: LENNAR NORTHWEST INC
Owner Address: 2103 NE 129TH ST UNIT 100
VANCOUVER WA 98686
Building Official Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most sevedy affect the health and safety of the general public. Although the City has made as complete a
review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor
warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction qr use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and / or occupantbf the premises.
CUT OF
Federal Way
PERMIT #:
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record"
INSPECTION REQUESTS: (253) 835-3050 ' .
13 -100871 -00 -SF Address: 806 SW 338TH ST
Project: LENNAR NORTHWEST INC FEDERAL WAY, WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ SWM Precon Site Mtg (4400)
Initial Erosion Control (4365)
E] Footings/Setback (4110)
Approved
To be done prior to breaking ground
Approved to place concrete
By Date
rBy Date
By Date
Foundation Wall (4115)
A proved to place concrete
By 12nt- Date i l � /P 3
Slab/Concrete Floor (4255)
Approved to place concrete
By Date
0 Drainage/Downspout (4040)
Approved to backfill
�4 J
By )2/2�2 Date L `1�•�
Underfloor Framing (4285)
Approved to sheath floor
By C Date ?
0 Plumbing Groundwork (4190)
Approved to cover
By Date
0 Floor Sheathing (4105)
Approved to install flooring
By Date
0 Shear Walls (4245)
❑
Roof Sheathing (4220)
0
Rough Plumbing (4230)
Approved to install siding
Approved to install roofing
Approved
BY Date
By /(<�
, Date
By
Date d,
E]
❑ Mechanical Rough -in (4165)
Gas Piping (4125)
0
Fire/Draft Stops (4095)
Approved
Approved to release test
Approved
By Date
By
DateBy
DateCjV
Insulation (4150)
Approved to install wallboard
By Date U
0 Final - Mechanical (4065)
Approved
By 0 _v Date _
Prior to scheduling a Framing inspection;
Electrical, Plumbing & Mechanical Rough -in and
Fire/Draft Stop inspections must be signed -off and
approved. IBC 1093.4
Gypsum Wallboard Nailing (4130)
Approved to install mud & tape
B Date
E] Final - Plumbing (4075)
Approved
By ��) Dated
C
0 Framing (4120)
Approved to insulate
By, j Date ill '�/�J
�/
0 Final Erosion Control (4375)
Approved
By Date
0 Final - Buildii
(1 Approved
Date
-eekC ' P 06!T
Rough Electrical Final Electrical Right of Way
Approved Approved 1:1Approved
By Date By Date By Date
RECEIVED
FEB 2 213
fA'�;RMIT
Federal Way CITY OF FEDERAL
COMMUNITY DEVEWPMENT SERVICES �qa ppLICATION
253-835-2607• FAX 253-835-2609
www. ciluoffederalwuu. com
4P,3 - l U U? 7 1
aMF CO ME PL DE EN FP
3 ZZ 13
SITE ADDRESSao� � W ^ 'TM. I
7j3O730 ✓ � 3
SUITE/UNIT #
PROJECT VALUATION
ZONING
ASSESSOR'S TAX/PARCEL #
TYPE OF PERMIT
LDING LUMBING CHANICAL
❑ DEMOLITION ❑ENGINEERING ❑FIRE PREVENTION
NAME OF PROJECT
(Tenant Name/Homeowner Last Name)
Wynstone East Lot 51
New single-family home, plan #C726
PROJECT DESCRIPTION
Detailed description of work to
be included on this permit only
NAME PRIMARY PHONE
PROPERTY OWNER
Lennar Northwest 253-590-2205
MAILING ADDRESS
E-MAIL
Z1 �8q
12815 Canyon Rd E, Suite F
marijke.vanstichel@lennar.com
CITY STATE ZIP
d
Puyallup WA 98373
NAME
PHONE
Lennar Northwest
253-590-2205
MAILING ADDRESS
E-MAIL
CONTRACTOR
12815 Canyon Rd E, Suite F
marijke.vanstichel@lennar.com
CITY
STATE
ZIP
FAX
Puyallup
WA
98373
WA STATE CONTRACTOR'S LICENSE #
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE #
v
NAME
PHONE
Lennar Northwest
253-590-2205
APPLICANT
MAILING ADDRESS
12815 Canyon Rd E, Suite F
E-MAIL
marijke.vanstichel@lennar.com
CITY STATE ZIP
FAX
Puyallup WA 98373
PROJECT CONTACT
NAME
PHONE
(Me individual to receive and
Patrick Danner, ESM Consulting Engineers
253-838-6113
MAILING ADDRESS
33400 8th Ave S, Suite 205
E-MAIL
patrick.danner@esmcivil.com
respond to all correspondence
concerning this application)
CITY
STATE
ZIP
FAX
Federal Way
WA
98033
ALTERNATE CONTACT NAME: PHONE
E-MAIL
+7 C /
'
G J r
Marijke Van Stichel 253-590-2205
PROJECT FINANCING
NAME
OWNER -FINANCED
Required value of $5,000 or more
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
(RCW 19.27.095)
I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as apart 01th application.
SIGNATURE:
PRINT NAME:
Bulletin #100 — January 1, 2011
Page 1 of 3
k:\Handouts\Permit Application
•
VALUE OFMECHAMCAL WORK $ -7 j 10 U (a copy of bid or estimate must be provided)
Indicate how many of each type offtrture to be installed or relocated as part of this project. Do not include existing fixtures to remain.
1 AIR HANDLING UNITS 5 FANS 5 GAS PIPE OUTLETS OTHER (Describe)
AIR CONDITIONER 1 FIREPLACE INSERTS HOODS (Commercial)
BOILERS 1 FURNACES 1 HOT WATER TANKS (Gas)
COMPRESSORS GAS LOG SETS REFRIGERATION SYST
DUCTING 5 GAS PIPING WOODSTOVES
Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing ftxtwes to remain.
2 BATHTUBS (or Tub/shower Combo) 5
LAVS (Hand sinks)
3 TOILETS
WATER PIPING
1 DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS 3
SHOWERS
VACUUM BREAKERS
DRINKING FOUNTAINS 1
SINKS (Mtchen/utility)
WATER HEATERS (Electric)
2 HOSE BIBBS
SUMPS
1 WASHING MACHINES
14 URfiB
Bulletin #100 - January 1, 2011 Page 2 of 3 k:UIandouts\Pennit Application
zW
11.27' ol—�
--1
9.65 43.99 I
16.59—
50
S03*1.49 A7"E
9
11
BSBL
T-� (n 00
o
L0
00
co Cl)
U
z
03
Ml
cs-
C) <
cc)
n -f
08 pq E
9
0
0
12.11' 13.4'] ------- --_.'46
LL
p LL LL -C)
0- CL CN V) 0 (N
CO co Zll]L
O
2 6 w
N
12
Zd I IN x19100
FEB 22 2013
CM OF FEDERAL WAY
CDS