Loading...
13-100871t I" of gederal Y+3ay CoAmiunity & Ecen. Dev. Services 3332e 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2807 Fax: (253) 835-2609 ' Building = SinghFamily r Permit #: 13-100871 WOO -SF _ t e +WJ Inspection Request Line: (253) 835-3050 Project Name: WYNSTONE EAST LOT 51 Project Address: 806 SW 338TH ST Parcel Number: 957850 0510 Project Description: NEW - Construction of a 2,655 square foot, 2 -story, single-family residence with a 55 square foot covered entry and a 737 square foot attached garage. Includes plumbing & mechanical. ***4 Bedrooms; $250,000 estimated selling price** Owner Applican Contractor Lender LENNAR NORTHWEST INC LENNAR NORTHWEST INC LENNAR NORTHWEST INC OWNER IS LENDER 2103 NE 129TH ST UNIT 100 2103 NE 129TH ST UNIT 100 LENNANIS93QG (11/7/13) Occupancy # I -Use ............................................... VANCOUVER WA 98686 VANCOUVER WA 98686 2103 NE 129TH ST UNIT 100 VANCOUVER WA 98686 Census Category: 101- New Single Family House Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction T Type V -13 Occupancy Load: 737 Floor Areas . R. 3,392 0 0 0 Additional Permit Information New / Additional Sq. Feet - 1 st Floor....................1067 New / Additional Sq. Feet - 3rd Floor....................0 New / Additional Sq. Feet - Basement...................0 Occupancy # 1 -Construction Type ........................Type V - B New / Additional Sq. Feet - Garage ....................... 737 Occupancy # 1 - Class.............................................R-3 Plumbing to be Included? ...................................... Yes Occupancy # I -Use ............................................... Residence (1 or 2 family) New / Additional Sq. Feet - 2nd Floor...................1588 Occupancy #I - Area (Sq. Feet).............................3392 BasicPlan?........................................................... No New / Additional Sq. Feet - Deck .......................... 0 Mechanical to be Included?...................................Yes New / Additional Sq. Feet - Other .......................... 55 New / Additional Sq. Feet - Total .......................... 3447 Zoning Designation. ............................................... RM 3600 Mechanical Fixtures Air Handling Units ......................... 1 Ducting ........................................... 1 Fans................................................ 6 Fireplace Inserts ............................. 1 Furnaces......................................... 1 Gas Piping ...................................... Gas Pipe Outlets ............................. 5 Hot Water Tanks............................ 1 Plumbing Fixtures Bathtubs ......................................... 2 Dishwashers................................... 1 Laundry Washer Outlets................ 1 Lavatories....................................... 5 Showers.......................................... 3 Sinks............................................... 1 Water Closets ................................. 3 Hose Bibbs..................................... 2 Sales office to be removed prior to home receivinj occupancy of temporary sales office. of Occupancy. Home to be finalled prior to PERMIT EXPIRES Wednesday, October 9, 2013 Permit Issued on Friday, April 12, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and �theity of Federal Way. Owner or agent: Date: City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: WYNSTONE EAST LOT 51 Permit #: 13 -100871 -00 -SF Address: 806 SW 338TH ST Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load Floor Area (sq. ft.) 1 3,392 1 0 0 0 Owner Name: LENNAR NORTHWEST INC Owner Address: 2103 NE 129TH ST UNIT 100 VANCOUVER WA 98686 Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most sevedy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner / occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction qr use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and / or occupantbf the premises. CUT OF Federal Way PERMIT #: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record" INSPECTION REQUESTS: (253) 835-3050 ' . 13 -100871 -00 -SF Address: 806 SW 338TH ST Project: LENNAR NORTHWEST INC FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg (4400) Initial Erosion Control (4365) E] Footings/Setback (4110) Approved To be done prior to breaking ground Approved to place concrete By Date rBy Date By Date Foundation Wall (4115) A proved to place concrete By 12nt- Date i l � /P 3 Slab/Concrete Floor (4255) Approved to place concrete By Date 0 Drainage/Downspout (4040) Approved to backfill �4 J By )2/2�2 Date L `1�•� Underfloor Framing (4285) Approved to sheath floor By C Date ? 0 Plumbing Groundwork (4190) Approved to cover By Date 0 Floor Sheathing (4105) Approved to install flooring By Date 0 Shear Walls (4245) ❑ Roof Sheathing (4220) 0 Rough Plumbing (4230) Approved to install siding Approved to install roofing Approved BY Date By /(<� , Date By Date d, E] ❑ Mechanical Rough -in (4165) Gas Piping (4125) 0 Fire/Draft Stops (4095) Approved Approved to release test Approved By Date By DateBy DateCjV Insulation (4150) Approved to install wallboard By Date U 0 Final - Mechanical (4065) Approved By 0 _v Date _ Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in and Fire/Draft Stop inspections must be signed -off and approved. IBC 1093.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape B Date E] Final - Plumbing (4075) Approved By ��) Dated C 0 Framing (4120) Approved to insulate By, j Date ill '�/�J �/ 0 Final Erosion Control (4375) Approved By Date 0 Final - Buildii (1 Approved Date -eekC ' P 06!T Rough Electrical Final Electrical Right of Way Approved Approved 1:1Approved By Date By Date By Date RECEIVED FEB 2 213 fA'�;RMIT Federal Way CITY OF FEDERAL COMMUNITY DEVEWPMENT SERVICES �qa ppLICATION 253-835-2607• FAX 253-835-2609 www. ciluoffederalwuu. com 4P,3 - l U U? 7 1 aMF CO ME PL DE EN FP 3 ZZ 13 SITE ADDRESSao� � W ^ 'TM. I 7j3O730 ✓ � 3 SUITE/UNIT # PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL # TYPE OF PERMIT LDING LUMBING CHANICAL ❑ DEMOLITION ❑ENGINEERING ❑FIRE PREVENTION NAME OF PROJECT (Tenant Name/Homeowner Last Name) Wynstone East Lot 51 New single-family home, plan #C726 PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER Lennar Northwest 253-590-2205 MAILING ADDRESS E-MAIL Z1 �8q 12815 Canyon Rd E, Suite F marijke.vanstichel@lennar.com CITY STATE ZIP d Puyallup WA 98373 NAME PHONE Lennar Northwest 253-590-2205 MAILING ADDRESS E-MAIL CONTRACTOR 12815 Canyon Rd E, Suite F marijke.vanstichel@lennar.com CITY STATE ZIP FAX Puyallup WA 98373 WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # v NAME PHONE Lennar Northwest 253-590-2205 APPLICANT MAILING ADDRESS 12815 Canyon Rd E, Suite F E-MAIL marijke.vanstichel@lennar.com CITY STATE ZIP FAX Puyallup WA 98373 PROJECT CONTACT NAME PHONE (Me individual to receive and Patrick Danner, ESM Consulting Engineers 253-838-6113 MAILING ADDRESS 33400 8th Ave S, Suite 205 E-MAIL patrick.danner@esmcivil.com respond to all correspondence concerning this application) CITY STATE ZIP FAX Federal Way WA 98033 ALTERNATE CONTACT NAME: PHONE E-MAIL +7 C / ' G J r Marijke Van Stichel 253-590-2205 PROJECT FINANCING NAME OWNER -FINANCED Required value of $5,000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as apart 01th application. SIGNATURE: PRINT NAME: Bulletin #100 — January 1, 2011 Page 1 of 3 k:\Handouts\Permit Application • VALUE OFMECHAMCAL WORK $ -7 j 10 U (a copy of bid or estimate must be provided) Indicate how many of each type offtrture to be installed or relocated as part of this project. Do not include existing fixtures to remain. 1 AIR HANDLING UNITS 5 FANS 5 GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER 1 FIREPLACE INSERTS HOODS (Commercial) BOILERS 1 FURNACES 1 HOT WATER TANKS (Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING 5 GAS PIPING WOODSTOVES Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing ftxtwes to remain. 2 BATHTUBS (or Tub/shower Combo) 5 LAVS (Hand sinks) 3 TOILETS WATER PIPING 1 DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS 3 SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS 1 SINKS (Mtchen/utility) WATER HEATERS (Electric) 2 HOSE BIBBS SUMPS 1 WASHING MACHINES 14 URfiB Bulletin #100 - January 1, 2011 Page 2 of 3 k:UIandouts\Pennit Application zW 11.27' ol—� --1 9.65 43.99 I 16.59— 50 S03*1.49 A7"E 9 11 BSBL T-� (n 00 o L0 00 co Cl) U z 03 Ml cs- C) < cc) n -f 08 pq E 9 0 0 12.11' 13.4'] ------- --_.'46 LL p LL LL -C) 0- CL CN V) 0 (N CO co Zll]L O 2 6 w N 12 Zd I IN x19100 FEB 22 2013 CM OF FEDERAL WAY CDS