10-105268 •
. Mechanical
City of Federal Way ill
Community Development Services Permit #: 10-105268-00-ME
P.O.Box 9718
Federal Way,WA 98063-9718 1^ r Inspection Request Line: (253) 835-3050
Ph:(253)835-2607 Fax'(253)835-2609
Project Name: DONOVAN
Project Address: 32704 33RD AVE SW Parcel Number: 951090 0360
Project Description: gas furnace change out
•
Owner Applicant Contractor
DENNIS J DONOVAN SHANNON BUCKINGHAM EMERALD AIRE INC(GENERAL)
32704 33RD AVE S EMERALD AIRE INC EMERAAI055BL(04/01/11)
FEDERAL WAY WA 98023-2732 5108 D ST NW 5108"D"ST NW
AUBURN WA 98001 AUBURN WA 98001
•
O / y \ -Vi g 41,-,V.V., -,1',,!%441(
71'44..c,. Vii. ti -��...TF: s,.,. �<.,/ •�`;.r • 1z<x,a ,�'.P>,w aza.'..
Mechanical Valuation 3272.85 Is this an Online or O.T.C.application Yes
a
%Z", �V•�6'y�4' ;tE�'���ttil t al,i' S t g •
Furnaces... 1
PERMIT EXPIRES Wednesday, June 15, 2011
Permit Issued on Friday, December 17, 2010
I hereby certify that the above information is correct and that.the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and theSiity of Federal Way. ' '
o/
Owner oragent: 01•1/191411W Date:
FWIALED Iz/so/io
. THTIS CARD IS TO REMAIN ON-SITE
CITY OF • Construction Inspeion Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 10-105268-00-ME Address: 32704 33RD AVE SW
Project: DENNIS J DONOVAN FEDERAL WAY, WA 98023-2732
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El Mechanical Rough-in (4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065)
Approved Approved to release test Approved
By Date By Date By Datea 'd•42
,iil
Fi' 1 L 7::::
El Rough ElectricalEl Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date