Loading...
10-101466 • Mechanical City of Federal Way Community Development Services Permit #: 10-101466-00-ME P.O.Box 9718 Federal Way,WA 98063-9718 ae A. Ph (253)835-2607 Fax (253)835-2609 Y 21)33 Inspection Request Line: (253)835-3050 Project Name: FIELD Project Address: 31400 49TH PL SW Parcel Number: 189870 0280 Project Description: Remove existing gas furnace and replace with new gas furnace Owner Applicant Contractor RUSSELL MCNEAL&WENDEE FIELD SARAH TURNER GLENDALE HEATING&A/C 31400 49TH PL SW GLENDALE HEATING&A/C GLENDHA053Q2 (11/2/11) FEDERAL WAY WA 98023-2003 12462 DES MOINES WAY S 12462 DES MOINES WAY S SEATTLE WA 98168-2266 SEATTLE WA 98168-2266 fi yvAk AAAm J0 04:' ffi & '�i 3. M ., ='d$ F • • Mechanical Valuation 2596.92 Is this an Online or O.T.C.application Yes _�`t1t.rax, to-40th � i Z�. s .a+'�"y , ; ° Furnaces 1 PERMIT EXPIRES Sunday, October 10, 2010 Permit Issued,on Tuesday, April 13, 2010 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. 4115/10 Owner or agent: 0 MLL$ Date. FINM 1 c ftl (o . THIS CARD IS T MAIN ON-SITE CrryOF4.01 Construction In Rection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 10-101466-00-ME Address: 31400 49TH PL SW Owner: RUSSELL MCNEAL & WENDEE FIE FEDERAL WAY, WA 98023-2003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ Mechanical Rough-in(4165) El Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By Date 0'0 r i j _I I E 1 ❑ Rough ElectricalEl Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date