Loading...
15-105309 'Electrical C ,of Federal way Permit #: 15-105309-00-EL Community 8 Econ. ev.Services 33325 8thth Ave S Federal way,WA 98003 .--... Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p Q Project Name: FAST WAY SHELL STATION Project Address: 31660 PACIFIC HWY S Parcel Number: 092104 9248 Project Description: Connect existing propane tank circuit to new propane tank. Install propane tank E-Stop switch. ' OwnerApplicant Contractor P SQUARE PETROLEUM INC PETYER ALLISON ALLISON ELECTRICAL CONSTRUCTION 8315 S 212TH ST ALLISON ELECTRICAL CONSTRUCTION INC INC WA 98032 PO BOX 926 ALLISEC0880M(9/14/16) PUYALLUP WA 98371 PO BOX 926 PUYALLUP WA 98371-0081 Additional Permit Information Is this an Online or O.T.C.application? Yes Is Use Educational•or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Circuits-Commercial 1 PERMIT EXPIRES Saturday, April 16, 2016 Permit Issued on Monday, October 19, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. i Owner or agent _oe-- � Date: /0-off ?7 S ONLINE N ,se.s ilk - • THIS CARD IS TO iv.ON-SITE CITY OF , Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 15-105309-00-EL Address: 31660 PACIFIC HWY S Project: P SQUARE PETROLEUM INC FEDERAL WAY, WA 98003-5408 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ UFER Ground(4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding(4195) '0 Temporary Power(4275) 0 Service(4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels(4045) ' 0 Rough Electrical(4225) .❑ Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date 0 Final-Electrical(4055) Approved By iltalS Date to f 2.4 (15-- , ❑ Rough Electrical El Final Electrical Right of Way Approved Approved Approved By Date By Date By Date