15-102043 a
" ' 0 Electrical
City of Community&Econ. Services Permit #: 15-102043-00-EL
33325 8th Ave S
Federal Way,WA 9e003 Inspection Request Line:
Ph:(253)835-2607 Fax (253)835-2609 p eq (253)835-3050
Project Name: BANK OF AMERIFCA
Project Address: 32011 PACIFIC HWY S Parcel Number: 150050 0130
Project Description: 6 altered circuits,2 altered data line.disconnect& reconnect 6 furniture cubicles for new
carpet instalL job#505530 contact:jeff 206-947-7796
Owner Applicant Contractor
BANK OF AMERICA BRENDA BROWN COCHRAN INC
32011 PACIFIC HWY S COCHRAN INC COCHRI*088JS(4/11/16)
FEDERAL WAY WA 98003 12500 AURORA AVE N PO BOX 33524
SEATTLE WA 98125 SEATTLE WA 98133
Additional Permit Information
Is this an Online or O.T.C.application Yes Is Use Educational or Institutional? No
Service greater than 999 Amps? No
Electrical Fixtures
Circuits-Commercial. 6 Low Voltage-Other(Commercial 2
PERMIT EXPIRES Sunday, October 25, 2015
Permit Issued on Tuesday,April 28, 2015
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: 0 NLINE Date:
100.ESII
itt
X
410 THIS CARD IS T MAIN ON-SITE
CITY OF Construction Inspection Record
Federal Way INSPECTION REQUESTS: (253)835-3050
PERMIT#: 15-102043-00-EL Address: 32011 PACIFIC HWY S
Project: BANK OF AMERICA FEDERAL WAY, WA 98003-6001
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 UFER Ground (4295) El Ditch cover(4030) ❑ Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
O Pool Bonding(4195) ❑ Temporary Power(4275) 0 Service(4235)
Approved Approved Approved
By Date By Date By Date
10 Feeders/Sub-panels(4045) El Rough Electrical(4225) ' CI Ceiling Cover(4020)
Approved ...
Approved Approved
By Date ` �S Date 5---j-?-5---j-?—„ �— By Date
`
O Final-Electrical(4055)
Approved
By V46 Date le ( ` I S”
❑ Rough Electrical El Final ElectricalEl Right of Way
Approved Approved Approved
By Date By Date By Date