06-100997 o
il 110 •
City of Federal Way Demolition Permit #: 06-100997-00-DE
Community Development Services
P.O.Box 9718
Federal Way,WA 98063-9718
Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050
Project Name: CHI
Project Address: 30025 1ST PL S Parcel Number: 891420 0030
Project Description: Demolition of fire damaged residence w/foundation to remain.
,
Owner Applicant Contractor
CHUN CHA CHI RANDY JOHNSON UNIVERSAL BUILDING
30025 1ST PL S UNIVERSAL BUILDING UNIVEBI005MF(7/1/07)
FEDERAL WAY WA 98003-4301 8300 6I ST AVE NE 8300 61ST AVE NE
OLYMPIA WA 98516 OLYMPIA WA 98516
Additional Permit Information
CONDITIONS:
PERMIT EXPIRES Saturday, March 1, 20,9,,,,S
:P rmiit IssuedOn _ a �M 2, 2006 ;:
herebyI certifyh�e a.
_ - Inform- � ,; o� ct and that the constructionon�above described property and,
the occupancy and t - - 'll b- - '.rdance with the laws, rules and regulations of the State of Washington
/ / and the City of Federal Way.
Owner or agent: _.ihI ,lV Date: ' 2 '
►/
0 THIS CARD IS TO *MAIN ON-SITE
CITY OF Community Development Inspection Record
Federal Way IVR INSPECTION REQUEST PHONE # (253) 835-3050
PERMIT#: 06-100997-00-DE
Owner: CHUN CHA CHI
Address: 30025 1ST PL S
FEDERAL WAY, WA 98003-4301
This card is part of your required inspection documents. Scheduled inspections may be failed if this card is not onsite. DO NOT LOSE THIS CARD.
Inspections are listed as close to sequential order as possible(read left to right.top to bottom). Please schedule inspections as appropriate. Work must not
be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections
are logged on the back of this card.
0 Final-Building(4050)
Approved
By Lej Date sl-4,.. 0
OS——t02 5-39
REcEiviv -
CITY ofcf& 0 0 1
FederalWay MAR 0 2 2006 PERMIT
• COMMU1Vf1YDEVELO?ME NT SERVICER SF MF CO ME EL PL D� N FP
33325 55 AVENUE SOUTHpr29•PO BOX 9718
IT L I CATION
n
FEDERAL WAY,WA 98063-971r•)')'Y OF FEREIV
Z53witno.6o7•PAX 253 d35m BUILDING 0(r _/ v q /-
u�ww.dttroffcderphimu.00m �
The ollowin' is re•wired i ormation-an Inco •lets a• •lication will not be acce•ted. Please •rint legibly in in or ty• .
■ PROPERTY INFORMATION
SITE ADDRESS 3 b Z 5 G � { filet- -C" 5 • SUITE/UNIT#
ASSESSOR'S TAX/PARCEL# v < ( f v- v 0 c J 0 LOT SIZE(sl
LEGAL DESCRIPTION(e.g.Acme Estates,Lot 1)
/Attach separate page far lengthy legal description)
■ PROJECT INFORMATION,
TYPE OF PERMIT 0 BUILDING . 0 PLUMBING 0 MECHANICAL
)(DEMOLITION P(ELECTRICAL 0 ENGINEERING 0 FIRE PREVENTION SYSTEM
PROJECT DESCRIPTION(Provide detailed description of work included on this permit only)
GINN(C VE F'1R� Q J rW.A-(--t L=1D k a-Avv\.I r..9
1 ��4-��c -t�,�.� c '2 Fr 0 (,.. o r�--f'eivo) Ls9-N ca(Lc-cz= DAA
r-et c--` € o . / 4,-(-=."4-us--- 14 L-1— U.f(.7 U 1-I 4-I t7 c-5 J.
PROJECT NAME(Name of Business or Owner Last Name) C., `
M.
• PEOPLE INFORMATION
PROPERTY NAME PRIMARY PHONE
i't
OWNER ( -t}U►^-� C-4I (Z>“3 ) - /98 2_
MAILING ADDRESS CITY,STATE,ZIP
07-5 t S} Pty 5D�-1to1.- lit A- 9 8 003
CONTRACTOR COMPANY NAME APPLICANT NAME OFFICE PHONE
U N \/..7--.1<--S041.--cR0I-- 7l,.��J �,�,� 30 Ise-•• ( '3(o)459 - (404(0
MAILING ADDRESS ✓ CITY,STA ,ZIP CELL PHONE
8�CYO Co( �u: Gr , 691- Lit (.t.)74 (36,0 ) "79 9- 1 S S
CITY OF FEDERAL WAY BUSINESS LICENSE NUMBER EXPIRATION DATE FAX NUMBER
•- - B L / l ( 36"'D)CL9 - 162”
CONTRACTOR'S REGISTRATION NUMBER)copy of card required with each application) EXPIRATION DATE
U N t V E- 3 L o o 5 PIA P / 0
APPLICANT CO PANY NAME rr '' APPLICANT NAME OFFICE PHONE
L.E1^-54-t- t5vluD J0147.35- ( ) -
MAILING ADDR CITY,STATE,ZIP CELL PHONE
( )
RELATIONSHIP TO PROJECT FAX NUMBER
❑Architect ❑`Tenant 0 Agent ❑ Other(Describe) ( ) -
CONTACT N E PRIMARY PHONE E-MAIL ADDRESS ^
ir/_tn` J t N e (5(oo.) 4-r7) - l(D4-�p u N,V L ikt-6vI Llai' Q
l( ,
LENDER NAMrNET
• f 3 11 .`.�` # :� ? � �._.3°7' WV.. A5 41
MAILING
7-2 o ,ADDRESS . 3 2i9 CITY,STATE,
z4), G1/4 9&b (ZS3 ) ?iv/ - 3,g o5
■ DETAILED BUILDING INFORMATION (�
EXISTING USE' �c7 PROPOSED USE 5F d2---
EXISTING ASSESSED/APPRAISED VALUE $ VALUE OF PROPOSED WORK $ 5/ 000 •
SPRINKLERED BUILDING? 0 YES XNO FIRE SUPPRESSION SYSTEM PROPOSED%REQUIRED? 0 YES XNO
WATER SERVICE PROVIDER )4,LAKEHAVEN ❑ HIGHLINE ❑ TACOMA ❑ PRIVATE(WELL)
SEWER SERVICE PROVIDER LAKEHAVEN 0 HIGHLINE ❑ PRIVATE(SEPTIC)
• •
PROJECT FLOOR AREAS
AREA DESCRIPTION EXISTING PROPOSED TOTAL
SQ.FT. SQ.FT. SQ.FT.
BASEMENT
FIRST
SECOND
THIRD
FOURTH
•
yADDITIONAL FLOORS(DESCRIBE)
DECK(COVERED?)
GARAGE 0 CARPORT 0
NUMBER OF FLOORS
moans*
raorosso ror
**NEW HOMES ONLY** NUMBER OF BEDROOMS E: D SELLING PRICE $
r'IXTURES
Indicate number of each type of fixture to •be installed or 'located as part of this p %' ct. Do not include existing fleares to remain
MECHANICAL
Value of Mechanical Work $
AIR HANDLING UNITS •ORATIVE COOLERS GAS LOGS REFRIG.SYSTEMS
BBQS ANS HOODS icemmerdd) WOODSTOVES
BOILERS FIREPLACE INSERTS RANGES MISC(Describe)
COMPRESSORS FURNACES GAS WATER HEATERS
DUCTS GAS PIPE OUTLETS
PLUMBING •
BATHTUBS(or Tub/sh• combo) SHOWERS WATER CLOSETS Qoe,t MISC(Describe)
DISHWASHERS SINKS DRINKING FOUNTAINS
GAS PIPE 0 S SUMPS RAINWATER SYST
WASHING ACHINES URINALS HOSE BIBBS
LAVS(eath,00m VACUUM BREAKERS ELECTRIC WATER HEATERS
DISCLAIIVIERJSIGNATURE BLOCK
I certify under penalty of perjury that the information furnished by me is true and correct to the best of my knowledge,and further,that I
am authorised by the owner of the above promises to perform the work for which the permit application Is.made. I further agree to hold
harmless the City of Federal Way as to _ claim!including costs, expenses, and attorneys'fees Incurred to the investigation and defense of
such claim),which may be mad p,- son,including the undersigned,and filed against the City of Federal Way,but only where such claim
arises out of the relic • oft Iuding its officers and employees,upon the accuracy of the information supplied to the city as a part of
this application.
2/
.moi
NAME/TI • �>� DATE
(Signatu ) (Title)
RELATIONSHIP TO PR•• ECT q Owner 0 Agent • Contractor ❑Architect O Other •
F .. ' �? ,1/ , , r ,`7iu;: 9x1�"`� 'ri� .% '1{3cu� R f�3^ �) '4y�31e �x� � , ; ). „1.,,,-,,z: 'z,-,. .1;4.. ' 4
Bulletin#100j—January 1,2006 Page 2 of 4 kulandouts�Permit Application
r •
DEPARTMENT OPOMMUNITY DEVELOPMENT SERVICES
33325 8th Avenue South
Ali PO Box 9718
CITY OF Federal Way WA 98063-9718
253-835-2607;Fax 253-835-2604
Federal www.citvoffederalway.com
DEMOLITION PERMIT REQUIREMENTS
A demolition permit is required to remove any structure or structures on a subject property. Check with the City's Planning
Division to see if the proposal exceeds thresholds that trigger an environmental review.An environmental review and
submittal of an environmental checklist may be required,which will extend the time period before a demolition permit can
be issued.
0 Prior to submitting a demolition permit,the following items(as applicable)must be signed by the respective
agency(see attached Demolition Permit Contact List).
NOTE TO APPLICANT: Utilities shall be disconnected and services performed,ifapplicable,prior to issuance of the demolition permit.All applicable
items below are to be signed and dated by the respective agency representatives.
1.ASBESTOS ABATEMENT 6.E CTRICITY
(Copy of approval form and asbestos survey from Puget Sound Clean Air ( dty ltAo Ahut off and meter removed)
provided)A9eY i`
At K. (Puget Sound Energy)
!'moo-��--
(City of Federal Way Building Official)
2.GAS SUPPLY 7.FUEL STORAGE TANKS N
(Gas tu, off,meter removed and final bill paid) (Above or below grade fuel tanks,have been pumped or removed
,N)/�c(//f- under Fire ent permit prior to any dismantle/excavation)
(Puget Sound Energy)
(Federal Way Fire District#39)
3.SEPTIC SYSTEM 8.WATER-Public Source (Check applicable b ..t. /n5 .
(Tank to removed or tank to be drained and filled) 1LMeter,to be removed and final utility bill paid-- �G9�S��'
/ ❑Meter to remain and be protected
/ /.. L €a. 1 , oo.__ W P\-5—V- V+1�
((// (King County Environmental Services) (Water Supplier)
******OR******
4.SANITARY SEWER (Check applicable box) 9.WATER-Private Well(Check applicable box)
❑Sewer line capped at property line ❑Private well filled and capped
[Existing • ., line to remain and be used by proposed new structur ❑Private g be used for other purposes if/j/ —
�/�
(Sewer District) (King County Environmental Services)
S.GARBAGE
(All household gage disposed off and final bill paid)
ln`JI (RST Disposal/Federal Way Disposal) RECEIVED
•
El Completed Construction Permit Application form MAR 0 2 2006
0 Provide the following fees: 1.Demolition Permit Fee $65.50 CITY OF FEDERAL WAY
2.Automation Fee 5.00 BUILDING DEPT.
3.WA State Surcharge 4.50
4.Cash Bond Deposit 500.00 (Refundable upon Completed Final Inspection)
$575.00
Bulletin#122—January 1,2006 Page 1 of 1 k:\HHandouts\Demolition Permit Requirements V
9—\
• Agency Case No. 'PUGET SOUND CLEAN ARECDVED
j
iAGENCY j
f 110 Union Street.Suite 500
200600258 -�-• Seattle.WA:98101-2038FEB 2 2006
www.pscleanainorg
dfilletteggl NOTICE OF INTENT '"` '`�'AgiclrliEAN
A.Project Tyne: 1. ❑ Friable Asbestos Removal 2. ❑ Friable Asbestos Removal&Demolition 3. 14 Demolition Only
B. / /� �
Property Owner: �e N �--t-t,s} Gt{- . I Phone:
Mailing Address: 30 O / t f/a-C--Q. S 1 City: Fe_L rG( Woy I State Wei.- I Zip: 96f'Lb 3
i'
C. Asbestos LE15E PEW CLEARLY.T/lLoBILL BE)(RIRRErt'RNAUIL/Nt;LIBEL.
Contractor: N/A-- Owner/CEO:
Mailing Address: Contractor
Phone: Job No.:
City: I State: I Zip: Fax:
Sitt..
I D. Add 3 Op z..5 � P 1,2,eS . I �
Site City: 't"(��'U) e- J Zip: 98.22403Manager. p.O ... o t•4-,.as i.,.....) I Local Phone: J
E. R4 Asbestos Survey or I No.of Date of Asbestos Was Friable Asbestos Identified? Utes No
0 Marl Presumed Structures: Survey; FCrs 4 o {o I Was Nonfriable Asbestos Identified? ❑Yes No
AHERA Building_ Certification#:Tinfie )64I 0•- Attach a copy of the survey when friable asbestos
Inspector: ol en. 4 5 1 r.A.e,..g Exp.Date: e1)4r24.0oL• _ i31 has not been identified.
•
An AHERA Survey is required before all demo/inion projects
F. Demolition Start No.of 1.❑ Training Fire(List Fire Dept.)
Information: Date: M*4-C* fo O b
Demolition Insert demolition contractor's mailing address on back ttllctttreS. � 2. CI Ordered Demolition(attach copy of Order)
Will nonfriable asbestos be left in place during demo? U Yes 121No
Contractor. U14t Ve-e-S 13()i a .i ,-.. ...r-Ko• If yes,list type and qty. Note disposal requirements in Step 6(on back).
G. Friable Asbestos Work Days: M T W Th F Sa Su
Project Information: I Start Date: (VOLAE Completion Date: Hours:
Will all friable asbestos ❑ Yes
Linear Ft.
Total Qty.to be Removed: Square Ft. materials be removed? 0 No
U BoiierWurnace Insulation U Duct Insulation 0 Pipe Insulation ❑Firproofing ❑Paints 0 Plaster 0 Textured Coatings
■ Cement Board • Cement Pipe Friable Flooring ❑Friable Roofing Material Other:
H Asbestos/Demolition Project Categories: Notification Period Project Demolition
1. Single-Family Residence(owner-occupied):
A.0 Asbestos Removal Project Only Fee Surcharge
B. ' XB.
1100 Days*s* B. $50 Demolition Project(with or without asbestos removal project) A.Prior yice A. $25
*{Asbestos removal ca
,. n begin upon noti€teatisrr detnoliti�rn-�rtusrwait-'Y(t days) -.- ------ _ ., l'1"k4---_
Note:If the single family residence is awned by one family who has been or will be using the residence as their domicile,the above boxes
IA or I B may be checked If this is not an owner-occupied residence,one ofthe categories listed below must be used instead A single
family residence does not include rental property,multi-fam0,units, or any mixed-use building.
2. U All Other Demolitions(with no Asbestos removal or Nonfriable Asbestos 10 Days
only or less than 10 linear feet and/or 48 square feet of friable Asbestos) $100
Friable Asbestos Projects(other than Single Family Residence): Asbestos Demo
3. LI >_10-259 linear feet and/or z 48- 159 square feet of asbestos Prior Notice 10 Days $100
4. LI 260-999 linear feet and/or 160-4,999 square feet of asbestos ? $100
5. LI >1,000 linear feet and/or>5.000 square feet of asbestos 10 Days $200 $100
6. LIEme 10 Days $600 $100
rgency Asbestos Project or Emergency Demolition Project i Prior Notice $50 Emergency Fee
(Single-Family Residences are exempt from emergency fee:however,property owners must provide a written emergency request)
1-�' • t the info contained in this notification&supplemental data is,to the best of my knowledge,accurate&complete. Age;,
` ,- A� t / Only/f
Agy Si:nature
Re. - Date _ Reviewed By
uget Sound Clean Air Agency Form No.: 66-160(Revised 2/05)TS . I
C° 2/2 `1 ZS-6
AMOUNT :5-0 .
CX. NO. ! 0 1('t (0
IPA AM -.Alh 'tel 3 GQ
r
. .
N WI K!
C7‘;----)
r-:-,) O M N1
ENVIRONMENTAL MANAGEMENT Gz COMPLIANCE
Asbestos Inspection
Residential Home
30025 1st Place S
Federal Way, WA 98003
tiVIPAIG;v4e:tdjcw-01:
ilk
Client
Universal Buildings Inc.
8300 61st Ave NE
Olympia, WA 98516
•
INTRODUCTION
On February 2, 2006 Nowicki Environmental Services, Inc. (NES) inspected this residential
home for asbestos materials. The structure was heavily damaged by fire with the roof being
burnt away. It has been open to the weather for one year. Any previously undiscovered
suspect materials should be assumed to contain asbestos. The contractor should contact
NES for sampling and analysis.
This inspection report includes data that describes the type of materials found, their
quantities, where appropriate and their asbestos content. The report can also be used as a
program planning tool for all construction, maintenance, abatement and demolition work
associated with the structure.
INSPECTION & SAMPLING PROCEDURES
Puget Sound Clean Air Agency (PSCAA) and Labor & Industries regulations require an
inspection of all buildings greater than 120 square feet for the presence of asbestos
containing materials prior to renovation and/or demolition. Asbestos containing materials
are defined as those building materials containing one percent or more of asbestos as
verified by laboratory analysis.
Asbestos containing materials are sub-divided into three types: surfacing materials, thermal
system insulation, and miscellaneous materials. Surfacing materials are defined as those
materials that are sprayed-on, troweled-on or otherwise applied to surfaces including, but
not limited to, acoustical plaster on ceilings, paints, fireproofing materials on structural
members, or other materials on surfaces for decorative purposes. Thermal system
insulation indicates material applied to pipes, fittings, boilers, tanks, ducts, or other
structural components to prevent heat loss or gain. All other materials are considered to be
miscellaneous materials. All surfacing materials, thermal system insulation and flooring .
installed in structures prior to 1980 are presumed to contain asbestos unless proven
otherwise by a licensed building inspector.
The number of samples collected depends on the type of material and its quantity. In order
to prove that suspect or presumed materials do not contain asbestos; surfacing materials
require at least three samples of each homogeneous area. Five samples are required for
areas greater than 1000 square feet and seven are required for areas greater than 5000
square feet. Thermal system insulation requires at least three samples be collected. One
sample of each suspect miscellaneous material must also be collected.
Each sample was collected and placed into a separate, sealed, unadulterated plastic bag.
They were then individually numbered. When possible, samples were collected from areas
or materials that had been previously damaged. Sampling equipment was decontaminated
after each sample was collected.
Once collected, the samples were delivered to an accredited laboratory, accompanied by a
chain of custody describing each sample. The samples were then analyzed using
Polarized Light Microscopy (PLM) Stain Dispersion technique in accordance with EPA
Method 600/R-93/116. Additional treatment and tests may have been used as required to
define a sample's composition.
• •
BUILDING DESCRIPTION
This residential home covers an estimated 3500 square feet on three levels. It was built in
the early 1990's. The main floor functions as living space, kitchen, bathroom and utility.
Sleeping areas are found upstairs. The basement houses the two gas furnaces, a family
room, bedroom and a small apartment. Inside walls and ceilings are gypsum wallboard. A
combination of oak, vinyl carpet and ceramic tile are used over oriented strandboard (OSB)
subfloor material. Vinyl framed windows are used and the siding is generally OSB lap
siding. Brick is used on the front of the home as accent. A large deck covers the
apartment and ground floor patio. Cedar shakes were used as roofing. Fiberglass
insulation is used throughout.
The fire that started in the downstairs apartment burned the apartment, back deck and the
shake roof severely. The house is heavily water damaged from the fire and the year that it
has been open to the elements.
ASBESTOS CONTAINING MATERIALS
No asbestos materials were found during this survey.
NON ASBESTOS CONTAINING SUSPECT MATERIALS
Following is a list of suspect materials that NESI identified, tested and determined to be non
asbestos containing.
Material Type Location Quantity Description
Gypsum Walls and 10,000 Standard gypsum wallboard throughout on walls
Wallboard ceilings sq/ft and ceilings
throughout
Sheet vinyl Utility 100 sq/ft Utility room floor covering
Sheet vinyl Family room 200 sq/ft Floor tile mastic
Red brick veneer 1000 Front veneer siding
sq/ft
Cement mortar Brick veneer 1000 Front veneer siding
In/ft
Ceramic tile Under 1000 Cream mastic under all ceramic tile
mastic bathroom In/ft
tiles
15 lb asphalt felt Exterior 5,000 Under shakes and OSB siding
shakes sp/ft
Brown Kraft Under oak 2000 On subfloor under oak floors
paper floor sq/ft
0 •
,
CONCLUSION
No asbestos containing materials were found during this inspection.
All asbestos must be removed prior to demolition or renovations in which it will be
disturbed. Contractors are advised that the potential to find asbestos-containing materials
including thermal system insulation in hidden spaces is always present during demolition or
renovation projects. Should suspect materials be discovered during the work, the contractor
is advised to call NES for an inspection of the suspect material.
PSCAA and Washington WISHA regulations require that all asbestos containing materials
be properly handled during demolition and renovation and that a survey of the asbestos
containing materials be provided to all contractors and posted at the site to prevent
potential accidental asbestos exposure.
INSPECTOR ENDORSEMENT
Inspector: v =t.. ----:::51( t i IL' 1 ,.. _..J
Reviewed by: /,, :i> ,7 , f " lit. ' �C: .�.
Attachments: Laboratory Analysis
Certificate
-...,N . S
(...(7k
; Felon Environmental Services
34004 9th Avenue South •Building A Suite 5 •Federal Way,Washington 98003-6740
WBE W2F5912535 Telephone Seattle(253)874-8118 *Tacoma (253)952-6717 ♦ Facsimile(253)927-4714*email ORION6717@aol
Polarized Light Microscopy Test Report
EPA Method 600/R-98/116
Client Nowicki Environmental Services, Inc. Date February 6, 2006
33516 9th Avenue South, Building#6 Page Page 1 of 2
Federal Way, WA 98003 Invoice 060554
Date Received February 3, 2006
Project Client/Number Universal Construction
Project Name 30025 — 1St Place South
Federal Way, Washington
Client Orion Sample Asbestos Other
Number Number Stereo Scope Exam Treatment Percent Type Fibers
Ola 60203-73a Texture - ND - -
Assoc. w/Olb
Olb 60203-73b Gypsum Wallboard - ND - Cellulose
Homogeneous
02a 60203-74a Texture - ND - -
Assoc. w/02b
02b 60203-74b Gypsum Wallboard - ND - Cellulose
Homogeneous
03a 60203-75a Texture - ND - -
Assoc. w/03b
03b 60203-75b Gypsum Wallboard - ND - Cellulose
Homogeneous
04a 60203-76a Texture - ND - -
Assoc. w/04b
04b 60203-76b Gypsum Wallboard - ND - Cellulose
Homogeneous
05 60203-77 Green/Beige Geometric - ND - -
Pattern Vinyl Sheeting
Homogeneous
06a 60203-78a Cream Vinyl Sheeting w/ - ND - Cellulose
Gray Felt Backing
Homogeneous
06b 60203-78b Rose Vinyl Sheeting - ND - Cellulose
Assoc. w/06a
07a 60203-79a Red Brick Crush ND - -
Homogeneous
* • •
Orion Environmental Services
34004 9th Avenue South • Building A Suite 5 • Federal Way,Washington 98003-6740
WBE W2F5912535 Telephone Seattle(253)874-8118*Tacoma (253)952-6717 • Facsimile(253)927-4714 *email ORION6717@aol
Polarized Light Microscopy Test Report
EPA Method 600/R-98/116
Client Nowicki Environmental Services, Inc. Date February 6, 2006
33516 9th Avenue South, Building#6 Page Page 2 of 2
Federal Way, WA 98003 Invoice 060554
Date Received February 3, 2006
Project Client/Number Universal Construction
Project Name 30025 — 1st Place South
Federal Way, Washington
Client Orion Sample Asbestos Other
Number Number Stereo Scope Exam Treatment Percent Type Fibers
07b 60203-79b Light Gray Mortar Crush ND -
Assoc. w/07a
08 60203-80 Gray Cement Mortar Crush ND - Cellulose
Homogeneous
09 60203-81 Off-White Mastic Chloroform ND - Cellulose
Homogeneous
10 60203-82 Felt Paper Ash ND - Cellulose
Homogeneous
11 60203-83 Kraft Paper Ash ND - Cellulose
Homogeneous
Dup: Laboratory QA/QC Duplicate;M;Mastic [(a),(b),(c),etc.]: Sample layers numbered from front to back.
Comments: For layered samples,each component has been analyzed separately. ND means non-detect for
asbestos fiber by EPA Method 600/R-98/116. Per EPA guidelines,samples will be archived for 30 days and
then disposed of. Disclaimers: PLM has been known to miss asbestos in a small percentage of samples that
contain asbestos. Thus negative PLM results cannot be guaranteed. This report may only be reproduced in full
with written approval of ORION Environmental Services.
0 0 .
. , rion Environmental Services
34004 9th Avenue South ♦ Building A Suite 5 • Federal Way,Washington 98003-6740
W Ill: 1\2 1'19 1253? Telephone Seattle(253)874-8118 *Tacoma (253)952-6717• Facsimile(253)927-4714*email ORION6717@aol
Polarized Light Microscopy Test Report
EPA Method 600/R-98/116
Client Nowicki Environmental Services, Inc. Date February 6, 2006
33516 9th Avenue South,Building#6 Page Page 2 of 2
Federal Way, WA 98003 Invoice 060554
Date Received February 3, 2006
Project Client/Number United Construction f t)Nt ne. BOI..0:-._i
Project Name 30025 — 1st Place South
Federal Way, Washington
Client Orion Sample Asbestos Other
Number Number Stereo Scope Exam Treatment Percent Type Fibers
Dup:Laboratory QA/QC Duplicate;M;Mastic[(a),(b),(c),etc.]: Sample layers numbered from front to back.
Comments: For layered samples,each component has been analyzed separately. ND means non-detect for
asbestos fiber by EPA Method 600/R-98/116. Per EPA guidelines,samples will be archived for 30 days and
then disposed of. Disclaimers: PLM has been known to miss asbestos in a small percentage of samples that
contain asbestos. Thus negative PLM results cannot be guaranteed. This report may only be reproduced in full
with written approval of ORION Environmental Services.
Analyst
r' i /' V;/'?L —C~_--==- Reviewed By (> > vim'
Donna (
McNeal Allen Clark
Laboratory Director, CEO Laboratory Analyst
Leading Environmental compliance Consulting into the 2J' Century
iC'.i ENV9''isoNMENTAL SERVO , INC. ,
4,r Laborat;.;ry Services Ca
6167 r 0 IC�� ,3- CHAIN OF CUSTODY
Client: gri( 'd G�.` FT. Projects � _5 i 10e e S f---:
SCJ
Address: Date Sampled: a 2_/per
Sampled By: A;, , . .5 --,i
Telephone: Laboratory ID:
Fax Number: Turn, round-Time Please Check Appropriate Box
Cell Number:
4-Hour ❑ 24-Hour 3-day 0
Sample N Description of Sample ,nalysis
0 ) &Ii_)/ -5 - d i 14/72 (aCe0- 7 --q-3 _
62,2 ,(_,c),e,c __. AAA, --ry
aL3 &L6)6 e6 - kc(i • :, 5—
cf ���vC6 - 770
S /
6 c---5--- .`� 11 J i,{-tr r r -Cizeazelbl, egveeo
a A o Fc.�7 .c t/Li iOO/ Cir P L c
`7 f e___ li e 70 efiz -79f
.C' C.e kii,,,J (A.clev &.L.,—ff iia Li b(--)
-rt ( e 0-45—L —cfece-u-A 1
_I l _ _ GSA a-c-/- / p2 leer-- dr6z4-_ _ __ .
e)
2 /) ---, ,
Relinquished by: tee- -a._ Received by: 14' 1. IF
Signature: f�. ,../A, �� � , z.G i �, Signator r.1
Company Name: A _ Company Name: (..:-
Time: -__.553
�Time: 3 U Date: Mr - Time: 11(�5--- Date: ,34,j
Sample Disposition:All samples will be disposed of after 30 days Received by:
of receipt.
Sampie Condition: Good 0 Accept 0 Reject O Signature: _
(samples am not properly contained and sealed or present in adequate Company Name:
quantity for method analysis.)
Time: Date:
If sample is insufficient in quantity and the client desires analysis regardless, please check 0.
Analysis method is in accordance with EPA Method 600/R-93-996 for PLM.
33516 9th Avenue South, Bldg#6 ® Federal Way, WA 98003 m (253)927-5233 o (253) 924-0323 FAX
•
•
CITY OF CITY HALL
` 33325 8th Avenue South
4 Federal Way Mailing Address: PO Box 9718
Federal Way,WA 98063-9718
(253)835-7000
www.cityoffederalway.corn
Ms. Chun Cha Chi March 22,2006
30025 1St Place South
Federal Way,WA 98003-4301
Re: Permit#05-102539-00-VO; STATUS OF DEMOLITION
Fire Damage-Chi;300251'`Place South i w
Dear Mrs,Chi:
This letter is to follow up with you and your insurance company to request a status for the demolition
and/or repair or reconstruction of the fire damaged structure.The home located as noted above was
damaged by fire on or about May 31, 2005.Now,nearly nine and one-half months later,work is yet to
begin to rebuild or repair this structure.
The City is concerned about this long delay on behalf of the neighborhood.The structure has become an
attractive nuisance and a potential harborage for vermin. Additionally,the neighborhood suffers
esthetically the longer the home remains in this condition.While the City does not want to add any
burden to you or your family,having already suffered the loss of your home, some time in the near future
the City will be in the position of having to take action under the provisions of the International Property
Maintenance Code(IPMC).
The IPMC,adopted by reference by the Federal Way City Code(FWCC) Section 5-166,gives the City
the authority to order the repair or demolition of structures that have been rendered uninhabitable by fire
or other causes.In these cases,the City may issue a Notice and Order for the repair or demolition of the
structure. Such orders have deadlines for completion of landmark tasks that lead to reasonable progress,
and also impose monetary fines for failure to complete such tasks.As stated before,the City would prefer
not to take this action,but cannot reasonably continue to allow conditions in the neighborhood to remain
as they are today.
Please reply to this letter with a schedule for repair or demolition of the structure.We would like to work
with you(or your agent),and/or your insurance company,to establish a reasonable schedule for abating
the condition of your property.Please be aware that a Notice and Order and its potential monetary fines
accrue to the property owner.For this reason, we are hopeful that we can gain your cooperation voluntarily
and begin to make reasonable progress towards the resolution of this situation.
Respectfully yours,
/14 tt. /k td--.-
MK.Martin
Building Official
c: Randy Johnson,Universal Building
Doc.I.D.35549