Loading...
RES 17-721 - Adopting 2018-23 TIP & ASIPRESOLUTION NO. 17 -721 A RESOLUTION of the City of Federal Way, Washington, adopting an extended and revised Transportation Improvement Program and Arterial Street Improvement Plan for 2018 -23, and directing the same to be filed with the Washington State Secretary of Transportation and the Transportation Improvement Board. WHEREAS, pursuant to the requirements of Chapters 35.77 and 47.26 RCW, the Federal Way City Council adopted an original Transportation Improvement Program ( "TIP ") on July 23,1991 (Resolution No. 91 -67); and WHEREAS, the Federal Way City Council updated a TIP annually thereafter; and WHEREAS, the Federal Way City Council held a public hearing on the revised TIP on June 20, 2017, in compliance with the requirements of State laws; and WHEREAS, the City Council has determined current and future City street and arterial needs, and based upon these findings has prepared a revised and extended TIP and an Arterial Street Improvement Plan ( "ASIP ") for the ensuing six calendar years; and WHEREAS, pursuant to. Chapters 35.77 and 47.26 RCW, the City Council is required annually to revise and adopt an extended TIP and ASIP; and WHEREAS, the City's SEPA Responsible Official has adopted a Determination of Non - Significance ( "DNS "), Federal Way File 17- 102278- 00 -SE, issued for the City's 2018 -23 TIP and ASIP, which includes the extended and revised projects contained in the TIP adopted herein; and WHEREAS, adoption of the City's 2018 -23 TIP and ASIP DNS reflects the fact that there will be no significant adverse environmental impacts as a result of adoption or implementation of the extended and revised TIP and ASIP adopted herein. Resolution No. 17 -721 Page 1 of 3 NOW THEREFORE, THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, RESOLVES AS FOLLOWS: Section 1. Program Adopted. The extended and revised Transportation Improvement Program and Arterial Street Improvement Plan for the City of Federal Way, a copy of which is attached hereto as Exhibit A and incorporated herein by this reference, which sets forth the City's transportation project locations, types of improvements, and the estimated costs thereof, is hereby approved and adopted for the ensuing six (6) calendar years (2018 -23 inclusive). Section 2. Filing of Program. Pursuant to Chapter 35.77 RCW, the City Clerk is hereby authorized and directed to file a copy of this Resolution, together with Exhibit A, with the Washington State Secretary of Transportation and the Washington State Transportation Improvement Board. Section 3. Severability. If any section, sentence, clause or phrase of this resolution should be held to be invalid or unconstitutional by a court of competent jurisdiction, such invalidity or unconstitutionality shall not affect the validity or constitutionality of any other section, sentence, clause or phrase of this resolution. Section 4. Corrections. The City Clerk and the codifiers of this resolution are authorized to make necessary corrections to this resolution including, but not limited to, the correction of scrivener /clerical errors, references, resolution numbering, section/subsection numbers and any references thereto. Section 5. Ratification. Any act consistent with the authority and prior to the effective date of this resolution is hereby ratified and affirmed. Resolution No. 17 -721 Page 2 of 3 Section 6. Effective Date. This resolution shall be effective immediately upon passage by the Federal Way City Council. RESOLVED BY THE CITY COUNCIL OF THE CITY OF FEDERAL WAY, WASHINGTON this 20th day of June, 2017. ATTEST: CITY OF FEDERAL WAY: ANIE COURTNEY, C, CITY CLERK APPROVED AS TO FORM: J. RYAN CALL, CITY ATTORNEY FILED WITH THE CITY CLERK: 06/14/2017 PASSED BY THE CITY COUNCIL: 06/20/2017 RESOLUTION NO.: 17 -721 Resolution No. 17 -721 Page 3 of 3 CITY OF FEDERAL WAY 01 0 N 4,569 569 r N 6,121 10,460 0 N o .- 8031 2,000 o o O N p OG m N 8501 6,000 201,2671 Total 2,8001 3,770 o O m N 1,920 1,500 1,044 750 1 320 2,218 tQ r 3,360 3,360 N N C, r N e O O O v N N n 2023 __ O N �pp m O p O e 62,1871 m O] 10 2001 O O r In n r to 2022 3201 N1 O r 2,1231 m 4001 150 500 v m 2,2381 c ^ o o ui N N_ 7 Costs in $ thr 2020 1 5,612 O Io0 O n O d N ONi 7 Costs in $ thr 130 O to 7 Costs in $ thi 2020 I O O 900 800 800 pOp O O O N 1,300 N C> O <I- & O) 2018 3,200 3,200 N 0 ID ID °0 O 130 O 10 O 0 10 0 0000 W 0 0 N (O 0 e n 5001 200 6501 320 0 r b r OOp 10 O N o o.- r 0 a CO 00 N r N N O N O N N V O W N N N tOD 100 O N 4,519 N n Ip O) O m N V ONi O) O Previous Years 472 1,200 3201 O pNl O N Previous Years O N TRANSPORTATION IMPROVEMENT OADWAY CAPITAL PROJECTS Description Update environmental documentation for modified access at S 320th St & S 324th St Add HOV lanes on S 320th St, realign ramps in SE quadrant Extend 3 lane principal collector and signal at SR -99 Install traffic signal Add SB right -turn lane Widen to 5 lanes Widen to 5 lanes, bike lanes, sidewalks, illumination Add EBL, WBL, WBR, NBT, SBR; widen to 5 lanes N to 3t6 or Alternatlive Measure Add HOV lanes, install raised median; roundabout at 340th St, turn lanes at 348th Add SB auxiliary lane Construct compact roundabout Implement Adaptive Traffic Control System Install variable lane use control signs Overlay I Overlay Add EB right-turn lane, sidewalk Install compact roundabout Widen to 5 lanes MOTORIZED CAPITAL PROJECTS Description Pedestrian Connection Shoulder improvements Install sidewalk on west side Install sidewalk on south side Install mid -block crossing treatments -� Install sidewalk and streetlights on south side Install sidewalk and streetlights on south side Install sidewalk and streetlights on south side Implement greenway plan Construct multi -use path '.. Subtotal Non - Motorized Capital Projects STREET LIGHTING CAPITAL PROJECTS Location Description I Citywide I LEO Retrofits Subtotal Street Lighting Capital Projects y O O F O W 0 0. 0. 4 4 C 4 4 O 4 4 f O I- City Center Access Phase 1 - Environmental City Center Access Phase 2 - S 320th St @ 1 -5 Bridge S 352nd St: SR 99 - SR 161 SW 320th St @ 47th Ave SW S 312th St @ 28th Ave S SW 340th St: 37th Ave SW - City Limits S 356th St: SR 99 - SR 161 S 320th St & 1st Ave South SR 99 HOV Lanes Phase 5: S 340th St - S 356th St 16th Ave S: S 344th St - S 348th St Military Rd S @ S 298th St Citywide Citywide SW Campus Dr: 1st Ave S - 19th Ave SW 16th Ave S: SR 99 - SR 18 Military Rd S @ S Star Lake Rd 1st Ave S @ SW 301st St SW 340th St: 31st Ave SW - 37th Ave SW '.. Subtotal Roadway Capital Projects 21st Ave S: S 314th St - S 316th St 1st Ave S: S 292nd St - S 312th St 21st Ave S: S 316th St - S 320th St SR 509: 11th PIS - 16th Ave S Citywide Pedestrian Safety SR 509: SW 312th St - 21st Ave SW S 312th St: 24th Ave S - Steel Lake Park S 312th St: Steel Lake Park - 28th Ave S Citywide 16th Ave S Trail: S 284th St - SR 509 eo' ��N CI Qo Or O 01 O '' N CI O Ul br O°r ANNNN (y yl {p N1ONN