Loading...
13-104544 . .� ! • Electrical 1 City & Federal Way n Permit #: 13-104544-00-EL Communi &Econ.Dev.Services 33325 8th Ave S Federal Way,WA 98003 :'.77'.31- � �� Ph:(253)835-2607 Fax:(253)835-2609 :S9p Inspection Request Line: (253) 835-3050 Project Name: KEY BANK Project Address: 32400 PACIFIC HWY S Parcel Number: 162104 9044 Project Description: Installing L/V calbling of voice,data,CCTV,and alarm wiring. Owner Applicant Contractor KEY BANK OF WASHINGTON TELDATA SYSTEMS TELDATA SYSTEMS PO BOX 560807 PKWY SE 12600 INTERURBAN AVE S TELDASI995PB (10/02/15) DALLAS TX 75356 TUKWILA WA 98168 12600 INTERURBAN AVE S TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional9 No Service greater than 999 Amps? No Electrical Fixtures Low Voltage-Other(Commercial 1 PERMIT EXPIRES Saturday, April 12, 2014 Permit Issued on Monday, October 14, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington end thCity of Federal Way. f Owner or agent: 4//A-----:-.7' Date: (01//i3 • THIS CARD IS TO "MAIN ON-SITE • CITY OF •" Construction Inssppection Record. Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT#: 13-104544-00-EL Address: 32400 PACIFIC HWY S Project: KEY BANK OF WASHINGTON FEDERAL WAY, WA 98003-8502 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ElRough Electrical(4225) - •❑ Ceiling Cover(4020) D Final-Electrical(4055) Approved Approved Approved By Date By Date By Date t 3 ttAi, D Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date • �tECEIVED CITY OF o EL CTRICAL Federal Way OCT 14 2013 PERMIT APPLICATION CITY OF FEDERAL WAN CDS PERMIT NUMBER — 0 k 5 — / SUITE/UNIT/SPACE# SITE ADDRESS: e-q00 Paf flL HO ' Fcie 642y p30,3 PROJECT VALUATION ASSESSOR'S TAX/PARCIFt# CURRENT/PROPOSED USE $ 6 )< 00 — — - — PROJECT NAME (Tenant or Homeowner Last Name) . 411 le tn PROJECT DESCRIPTION kr.ki VE,'Age. or 17 CG I . `1 ` Detailed description of work to be included on this permit only NAME • PRIMARY PHONE PROPERTY OWNER K &� < (!`J3 ) 'I -3O3 MAILING ADDRESS E-MAIL 'C? aril es b r' __t�-r��n��r;� t^ CC.V CITY STATE ZIP FAX hat"q"(1 wC,t,y w R C/600 ( ) - NAME C'�/'` / PRIMARY PHONE IJJ k A j aC, (z0 )60e-- 0..7Z MAILI f ,q E-MAIL j ELECTRICAL //5-9 ,�/t�v�-4i Q� dolavi { -tC'ici61,C/47f'."' CONTRACTOR CITY STATE ZIP FAX %g1c3 ( )6196- 0107 WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# NAME PRIMARY PHONE • APPLICANT %� FI: ' P^ � tre(I6 ) Z53 7q7SS MAILING A1)DRESS E-MAIL R9X 89q93 CITY STATE ZIP FAX (Jr 13e (WWI ) 15Z - o.7o7 . NAME PRIMARY PHONE PROJECT CONTACT /k, t,�L� �, (Z j 3 ) t(G, - 'O_-; I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses, and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. SIGNATURE: „ / /07(.4(7/3 DATE PRINT NAME: /(..t jC.11 .ti/ Bulletin#160—January 1,2013 Page 1 of 2 kaHandouts\Electrical Permit Application