Loading...
13-103472 Plumbing Community of Eccoon.Devv..Services Permit #: 13-103472-01-P L 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: 4111 Ph:(253)835-2607 Fax:(253)835-2609 p q (253)835-3050 Project Name: TOTAL WINE Project Address: 32095 PACIFIC HWY S Parcel Number: 150050 0110 Project Description: Main underslab sanitary and storm sewer connections. Revised to add plumbing fixtures, domestic water,roof drains and waste and vent above-ground. Owner Applicant Contractor HARSCH INVESTMENT PROPS LLC ALEGIS CONSTRUCTION ALEGIS CONSTRUCTION PO BOX 2708 3701 S NORFOLK ST SUITE 300 ALEGICI894CN(2/19/15) PORTLAND OR SEATTLE WA 98118 3701 S NORFOLK ST SUITE 300 97208 SEATTLE WA 98118 No Fixtures'Associated With This Permit!! PERMIT EXPIRES Wednesday, February 19, 2014 Permit Issued on Friday,August 23, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 'tti___ Date: 2- 3-- A-'V4 — z ` 3 FINALED DATE INSPECTOI AREA AND TYPE E INSPECTION ® CITY OFW411**Insm. • THIS CARD IS TO MAIN ON-SITE Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-103472-01-PL Address: 32095 PACIFIC HWY S Project: HARSCH INVESTMENT PROPS LL FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Plumbing Groundwork(4190) ❑ Rough Plumbing(4230) ❑ Final-Plumbing(4075) Approved to cover Approved Approved By Date By nn Date By S Date '-24--Y 0 Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date ,ik RECEIVED AUG 05 2013PERMIT IPPLICATION CMI OF Federal Way CITY OF FEDERAL WAY CDS PERMIT NUMBER / - r a 3 7 _ TARGET DATE SITE ADDRESS SUITE/UNIT# W 17A C 5 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# te ob - a ( l TYPE OF PERMIT 0 BUILDING PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT cL VOL due PROJECT DESCRIPTION 5130,S t k S;V m A-) 8-C./1 r VAS c-r S C Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER , ( 1164(- BJP MAILING ADDRESS E-MAIL 22 ZZc7E , CITY STATE ZIP'1 2°8 X02 t Jr� 2_ I NAME PHONE 4L (S COIL)SKvcr-rte MAILING ADDRESS CONTRACTOR '9,10'9,10 t L — S 1_- SU tom-30b CITY � STATE ZIP 1 FAX 'nt i/ '`TE c WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# NAME PRIMARY PRIMARY PHONE C-4fP4: APPLICANT MAILING ADDRESS E-MAIL CITY STATE ZIP FAX NAME PRIMARY PHONE PROJECT CONTACT g2®((, k .(5� 3 S (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence concerning this application) CITY STATE ZIP PAX NAME PROJECT FINANCING 0 OWNER-FINANCED Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),whic . ay be made by any person,including the undersigned,and filed against the city, but only where such claim arises out o the r i• - e of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a p•;, t op•I•tion. SIGNATURE: 1110 / DATE PRINT NAME: Bulletin#100—January 1,2013 Page 1 of 3 k:\Handouts\Permit Application VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(Commercial) BOILERS FURNACES HOT WATER TANKS(Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. BATHTUBS(or Tub/Slower Combo) LAVS(Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOW TTAINS_________—_- —__SINKS(witch/Utility} WATER HEATERS-IEtestrie-- HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑Yes❑ No ❑Yes ❑ No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE FIRST FLOOR(or Mobile Home) • 0 4 COVERED ENTRY DECK 5 GARAGE 0 CARPORT 0 OTH R(describe y Area Totals EOSTD10 PROPOSED TOTAL ESTIMATED SELLING PRICE$ #OF BEDROOMS COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet Type Stories I7ILISI3IU „ o � ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet Type Stories •TOTAI BUILDIN d �r� TENANT AREA ONLY Bulletin#100—January 1,2013 Page 2 of 3 k:\Handouts\Permit Application