Loading...
12-103381 Federal WdifECEIVED'- PERMIT r' M 4PA' MF E PL DE EN FP COMMUNI7YDEVELOPMENT SERVI $ 23 zoilAPPLICATION 253-835-2607•FAX 253-835-2 wwwcit ijoffegeralwau.com CITY OF FEDERAL WAY SITE ADDRESS CDS SUITE/UNIT# PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $ 7, 9r3 at q z d c- a 7. - 6 a / 0 TYPE OF PERMIT BUILDING 0 PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT (Tenant Name/Homeowner Last Name) 6-Ev ,11 &lEp sj 2 /11./,I: iCl{l J$ O - CL� F/1 - Tey- a e__)<, s4Z.,�7 �3 . /4- rook, a,-,I i•-ts, /..,/,t),--1. PROJECT DESCRIPTION r A n.Sv (� . Detailed description of work to L 4S " // Z •1 / " y �s - d i i 4 i'. ./A o"-).,, .-- .".s,71-.".s,71- /- /( (& -// be included on.this permit only / (/r) so 'ny r"'.-e•-..4.-.--,..cNAME / PRIMARY PHONE PROPERTY OWNER 6.7 e.,-, /J o,,,,,e i,4,-.Q �I /2 7 MAILING ADDRESS(! 4 A✓� C f^ E-MAIL CITX STME ZIP NAME 4 / PHONE X2.1`-er.�uJ i,---(00 "V$' v-C-e--C 2.3-3-3/& X15 /2 MAILING ADDRESS E-MAIL // / ��JJ CONTRACTOR /0/S- /gr—A, 5 -5: /ye ,-P4 tJ Se,/tj i cvs6:7z- C s CITYFAX s � lFlyy I53-5`39— /s- WA���CONTRACTOR'S C 'S�L�LICENSE � EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# NAME / ��t e PHONE5-S/e-x'7/13. APPLICANT MAILING ADDRESS E-MAIL CITY rE 2IPF '3 i 7 FAX PROJECT CONTACT N jar�� ( PHONE (The individual to receive and '' �' respond to all correspondence MAILING ADDRESS f - E- L concerning this application) ` -2�3 Z/-3✓ .5 CITY STA'1�E ZIP / e J FAX ALIITEFtNATE CON*CCT N PHONE E-MAIL Ce-c.(, x zZ- 35-1-zaz PROJECT FINANCING NAME / a•-ig„ ER-FINANCED Required value of$5,000 or more (RCW 19.27.095) MAILING ADDRESS,CITY,STATE,ZIP PHONE I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person,including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the ci • a p• • this application. SIGNATURE:` DATE 7/2--3// c PRINT NAME: //,'/ k -t.--41-- Bulletin#100-January 1,2011 Page 1 of 3 k:\Handouts\Permit Application t • v •Building - Commercial City of Federal Ways Community&Econ.Dev.Services 'r " t, t Permit #: 12-103381 -00-CO 33325 8th Ave S Ela tw L-' al Federal Way,WA 98003 Inspection Request Line: (253) 835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p q Project Name: WEST CAMPUS OFFICE PARK Project Address: 32105 1ST AVE S Parcel Number: 926502 0020 Project Description: REP-Remove existing hot roofing and insulation and replace with(1)layer of 2" Polyiso rigid insulation and install 60 Mil TPO Owner Applicant Contractor Lender SDGJ ASSOCIATES LLP PREFERRED ROOF SERVICES INC PREFERRED ROOF SERVICES OWNER IS LENDER 32123 1ST AVE S#A3 1015 145TH STS INC FEDERAL WAY WA TACOMA WA 98444 PREFERS936QT(11/30/13) 98003 1015 145TH ST S TACOMA WA 98444 Census Category: 555 -Non-structural roofing permits Includes: #1 #2 #3 #4 Occupancy Class: Construction Type: Occupancy Load: Floor Area(sq.ft.) 0 0 0 0 Additional Permit Information Mechanical to be Included9 No Number of Stories. 2 Permit for Building Shell Only? No Plumbing to be Included? No No Fixtures Associated With This Permit!! PERMIT EXPIRES Saturday, January 19, 2013 Permit Issued on Monday, July 23, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington Owner or agent: / Jhe City of Federal Way.�� `- Date: /Z. 1 PHALUI'D tee A. • THIS CARD IS TO MAIN ON-SITE CITY OF'' In ection Record Federal WayConstruction INSPECTION REQUE TS: (253) 835-3050 PERMIT#: 12-103381-00-CO Address: 32105 1ST AVE S Project: SDGJ ASSOCIATES LLP FEDERAL WAY, WA 98003-5702 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) 0 Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By Date El Foundation Wall(4115) El Drainage/Downspout(4040) �El Re-steel(4215) Approved to place concrete Approved to backfill Approved to place concrete or grout By Date By Date By Date . .,o Slab/Concrete Floor(4255) ' ❑ Underfloor Framing(4285) Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date— By Date By Date , • 0 Shear Walls(4245) Roof Sheathing(4220) 0 Fire/Draft Stops(4095) Approved to install siding Approved to install roofing // Approved By Date By Date i-z -/ By Date . ❑ Interim Erosion Control(4370) Prior to scheduling a Framing inspection; El Framing(4120) ' ApprovedApproved to insulate . Electrical,Plumbing&Mechanical Rough-in and Fire/Draft Stop inspections must be signed-off and By Date approved. IBC 109.3.4 By Date • •0 Insulation (4150) ❑Gypsum Wallboard Nailing(4130) 0 Suspended Ceiling Grid (4265) Approved to install wallboard Approved to install mud&tape Approved to drop tile By Date By Date By Date '0 Final-Fire Department(4060) Final Erosion Control(4375) ❑ Final-Building(4050) Approved Approved Approved By Date By DateBy %4- Date i 2 -12. ❑ Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date