Loading...
15-106080 41 10 411) Elecitrkal City Federal Way Communiy&Econ.DevServices Permit #-• 15-106080-00-EL 33325 8th Ave S Federal way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 1 i 1 p Insion Request Line: (253)835-3050 Project Name: INTERNATIONAL HOUSE OF PRAYER Project Address: 33320 1ST WAY S Parcel Number: 926500 0250 Project Description: Install low voltage CCTV system Owner Applicant Contractor GARY WU JENNIFER COVELLO AD T LLC WU PROPERTIES LLC AD T LLC ADTLLL*881D0(3/20/16) 17455 NE 67TH CT SUITE 100 11824 NORTH CREEK PKWY SUITE 105 11824 NORTH CREEK PKWY SUITE 105 REDMOND WA 98052 BOTHELL WA 98011 BOTHELL WA 98011 Additional Permit Information Electrical Work Valuation? 700 Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Low Voltage-Burglar Alarm(Cor I PERMIT EXPIRES Monday, May 30, 2016 Permit Issued on Wednesday, December 2, 2015 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: c NJ1.1 1 E Date: �„t • 'THIS CARD IS TO AIN ON-SITE CITY°F Construction In ection Record Federal Way INSPECTION REQUN„'TS: (253)835-3050 PERMIT#: 15-106080-00-EL Address: 33320 1ST WAY S Project: GARY WU FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 UFER Ground (4295) 'El Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date El Pool Bonding(4195) 0 Temporary Power(4275) 'El Service(4235) Approved Approved Approved By Date By Date By Date 0 Feeders/Sub-panels(4045) ❑ . Rough Electrical(4225) '0 Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date El Final-Electrical(4055) iy Date l,-27k"//r------� 1, • • El Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date