14-104291 w .
III Electrical
City of Federal ay , ,
Community&Econ.Dev.Services Permit #: 14-104291-00-EL
33325 8th Ave S FILE
Federal Way,WA 98003
Inspection Request Line:
Ph:(253)835-2607 Fax:(253)835-2609 P q (253)835-3050
Project Name: HEMINGWAY
Project Address: 29803 1ST AVE S Parcel Number: 513710 0050
Project Description: Replace furnace with an 80K gas furnace and 3 ton A/C 1111
Owner Applicant Contractor
FRANK C HEMINGWAY NORTHWEST PERMIT/WESCO PACIFIC AIR SYSTEMS(ELECTRICAL)
29803 1ST AVE S 1345 W GULF RD PACIFAS912RQ(12/17/15)
FEDERAL WAY WA 98003-3642 POINT ROBERTS WA 98281 12811 PACIFIC HWY S
LAKEWOOD WA 98023
Additional Permit information.'.
Is this an Online or O.T.C.application Yes Is Use Educational or Institutional No
Electrical Fixtures'.
Circuits-Residential I
PERMIT EXPIRES Wednesday, February 18, 2015
Permit Issued on Friday,August 22, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: Date:
______elNuNs.__________
FINALED
J
' t
CITY OF Construction In ection Record
Federal Way INSPECTION REQ TS: (253)835-3050
PERMIT#: 14-104291-00-EL Address: 29803 1ST AVE S
Project: FRANK C HEMINGWAY FEDERAL WAY, WA 98003-3642
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
❑ UFER Ground(4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
• . • . •
o Pool Bonding(4195) ❑ Temporary Power(4275) 0 Service(4235)
Approved Approved Approved
By Date By Date By Date
o Feeders/Sub-panels(4045) 0 Rough Electrical(4225) 0 Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
O Final-Electrical(4055)
Approved
/�
By Date 1 I IS I Idi
El Rough Electrical El Final ElectricalEl Right of Way
Approved Approved Approved
By Date By Date By Date