Loading...
14-101476 to 0 • Electrical City of Federal Way Permit #: 14-101476-00-EL Community&Econ.Dev.Services 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 p Project Name: HOME STREET BANK FULFILLMENT CENTER Project Address: 33405 8TH AVE S SUITE 200 Parcel Number: 926500 0060 Project Description: Installation of modular furniture(connect to existing wiring). Owner Applicant Contractor LBA REALTY FUND II-COI LLC S E S INC SES INC PO BOX 847 1402 AUBURN WAY N PMB 371 SESIN**990RA(12/1/15) CARLSBAD CA 92018 AUBURN WA 98002 1402 AUBURN WAY N PMB 371 AUBURN WA 98002 Additional Permit information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional'? No Service greater than 999 Amps? No Electrical Fixtures Circuits-Commercial 1 PERMIT EXPIRES Sunday, September 28, 2014 Permit Issued on Tuesday,April 1, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and t e City of Federal Way. //� Owner or agent: /1/1'1)1^/ �� Date: `�"I // ::_ IIL - ..,Ab4. THIS CARD IS TO MAIN ON-SITE y CITY OF � Federal Way0 Construction In ction Record INSPECTION REQ TS: (253)835-3050 PERMIT#: 14-101476-00-EL Address: 33405 8TH AVE S SUITE 200 Project: LBA REALTY FUND II-CO I LLC FEDERAL WAY, WA 98003-6305 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. O UFER Ground (4295) ❑ Ditch cover(4030) El Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date • • • • • O Pool Bonding(4195) 0 Temporary Power(4275) El Service(4235) Approved Approved Approved By Date By Date By Date o Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date ' O Final-Electrical(4055) Approved B S Dat'1 t_ 14\ El Rough ElectricalEl Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date „.. , . . „A • E&CTRICAL CITY OF Federal Way PERMIT APPLICATION aceivED PERMIT NUMBER 1 L .. _ 1 0 t . 7 1 APR 01 2014 CITY OF Fagg,* SITE ADDRESS: - -s4.0 .--- 5 lve s CDS PROJECT VALUATION ASSESSOR'S TAX/PARCEL/ ' # CURRENT/PROPOSED USE $ 7 b 92- 625- 00 - 000 PROJECT NAME �� �_ /� /- / f ��I (Tenant or Homeowner Last Name) , m' 3J 2-ee-/ X4IL'L 7 -t6 (/V$1 r,u PROJECT DESCRIPTION - 1-371-42-1( i?2d1)hd - 414-'44'4141 ( A-Ic 14) ill �.y D� ) Detailed description of work to / be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER ( ) - MAILING ADDRESS E-MAIL CITY STATE ZIP FAX ( ) - NAME PRIMARY PHONE 5.S , . - ( sof) 7(4 -3(4 MAILING, ADDRESS//,� Ai/1y 1 ,, f E-MAIL ELECTRICAL i 4102- b(.i/VAJ (i it). '3 I ( ipL1.LD& r.erktcaS-I,.1i CONTRACTOR STATE ZIP FAX "vv to-Al (A)A 61006 2— ( s-5)5'Zv -c4 36 WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE N 66.5-TA) t A (NO 1 /2.-/ D( / IS-- -2,o-o2,-1D062:g-4o-61.- NAME �. PRIMARY PHONE APPLICANT r 4 6 I COY (204 ) 7('( - R6 MAILING REss i 154 D/`d I/��n LA 14 , /v . if c7 1/ d LtL kt 4 0 e alma(i.puit- 1STATE FAX rw�tl ail 1600 t�OZ- (26-3) 516 - Olv 3‘ NAME PRIMARY PHONE PROJECT CONTACT -76)4A7 Add ICO (104') 7(`i/- 36 6 I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part ofofthis application. 3 SIGNATURE: �/,i�G2f �6i/K�vC7 7DATE 7/�hcr PRINT NAME: / L Lk/ c. (CO Bulletin#160—January 1,2013 Page 1 of 2 k:'Handouts\Electrical Permit Application