Loading...
16-100661 '*- -- A. 0 0 Electrical' City of Federal Way Community&Econ.Dev.Services Permit #: 16-100661-00-EL 33325 8th Ave S Federal Way,WA 98003F ILE Request Line: 253 Ph:(253)835-2807 Fax (253)835-2609 Inspectionq � )835-3050 Project Name: SOUTH 352ND ST EXTENSION(STATE ROUTE 161 TO STATE ROUTE 99) Project Address: 35200 PACIFIC HWY S Parcel Number: 292104 9048 Project Description: Install(1)new 100A 120/240V electrical service for new traffic signal and street lighting in right of way on southeast corner of S 352nd Street Owner Applicant Contractor YOUNGSPRING LLC ROGER SHERWOOD WEST COAST SIGNAL INC 813 LONNA LN WEST COAST SIGNAL INC WESTCCS8928G(11/21/17) CUPERTINO,CA 95014 20111 208TH AVE SE 20111 208TH AVE SE RENTON WA 98058 RENTON WA 98058 Additional Permit Information Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures New Service:0- 100 amps(Comm 1 PERMIT EXPIRES Friday, February 3,.2017 Permit Issued on Thursday, February 4, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the . - hill be in accordance with the laws, rules and regulations of the State of Washington e.-, and the C�of,Federal Way. --Z----Owner or a• / Date: / 16 r r THIS CARD IS TO MAIN ON-SITE 4 c ri OF - • Construction In ection Record + Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 16-100661-00-EL Address: 35200 PACIFIC HWY S Project: YOUNGSPRING LLC FEDERAL WAY, WA 98003-8319 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. UFER Ground (4295) ❑ Ditch cover(4030) ❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding(4195) ❑ Temporary Power(4275) ❑ Service(4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels(4045) E Rough Electrical(4225) ❑ Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date ID Final-Electrical(4055) Approved By M Date /4-1 24-I ( , Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date 110 ELECTRICAL CITY OF Federal Way PERMIT APPI4FcigffeT PERMIT NUMBER \ ' 0 0 0 I _ � ' FEB 0 4 2016 CITY OF FEDERAL WAY SUITE/UNIT/8 / SITE ADDRESS: 35200 Pacific Highway South Federal Way, WA PROJECT VALUATION ASSESSOR'S TAX/PARCELS CURRENT/PROPOSED USE $ 4500.00 2 9 2 1 0 4 - 9 0 4 8 R/W Improvements PROJECT NAME (Tenant orHomeowner Last Name) South 352nd St Extension SR161 to SR99-Federal Way Install new 100A 120/240V electrical service for new traffic signal and street lighting in right of way PROJECT DESCRIPTION on southeast corner of S.352nd St. Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER City of Federal Way ( 253) 835 - 2700 MAILING ADDRESS E-MAIL 33325 8th Ave S CITY STATE ZIP FAX Federal Way WA 98003 ( ) - N AME PRIMARY PRONE West Coast Signal, Inc. ( 206 ) 595 _ 6656 MAILING ADDRESS E-MAIL ELECTRICAL 20111 208th Ave SE moge@westcoastsignal.com CONTRACTOR CITY STATE ESP FAX Renton WA 98058 ( N/A ) - WA STATE CONTRACTOR'S LICENSE a EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE S WESTCCS8928G 11 / 21 / 17 20-12-100610-00-BL NAME PRIMARY PRONE APPLICANT West Coast Signal, Inc. ( 206 ) 595 - 6656 MAILING ADDRESS E-MAIL 20111 208th Ave SE moge@westcoastsignal.com CITY STATE ZIP FAX Renton WA 98058 ( N/A) NAME PRIMARY PRONE PROJECT CONTACT Jon Mogensen ( 206 ) 595 _ 6656 I certify under penalty of perjury that I am the property owner or authorised agent of the property owner.I certify that to the best of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit.I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim?,which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the injbrmation s -•• • to the city as a part of his application. SIGNATURE: i/ , DATE 1/20/2016 PRINT NAME: :ecky Moge en -- I 71 ,C,% U � ' • Bulletin#160—January 1,2013 Page 1 of 2 k:\l landouts\Electrical Permit Application