14-100292 s C ,j r
. s
S Electrical
City of Federal Way
Community&Econ.Dev.Services F33325 8th Ave S ' L E Permit #. 14-100292-00-EL
Federal Way,WA 98003
Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253)835-3050
Project Name,: HOME STREET BANK FULFILLMENT CENTER
Project Address: 33405 8TH AVE S SUITE 200 Parcel Number: 926500 0060
Project Description: CAT-V data cable.
Owner Applicant Contractor
HOME STREET BANK JOSH TOKARSYCK INTEGRATED TECHNOLOGIES GROUP INC
601 UNION ST SUITE 2000 INTEGRATED TECHNOLOGIES GROUP INC INTEG**932L1(6/21/15)
SEATTLE WA 98101 PO BOX 1267 PO BOX 1267
BOTHELL WA 98041 BOTHELL WA 98041
Additional permit Information
Is this an Online or O.T.C.application? Yes Is Use Educational or Institutional? No
Service greater than 999 Amps? No
Electrical Fixtures''.
Low Voltage-Other(Commercial 1
PERMIT EXPIRES Sunday, July 20, 2014
Permit Issued on Tuesday, January 21, 2014
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
a 't} Fe r
Owner or agent: Date:
® i THIS CARD IS TO MAIN ON-SITE
CITY OF "", • Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 14-100292-00-EL Address: 33405 8TH AVE S SUITE 200
Project: HOME STREET BANK FEDERAL WAY, WA 98003-6305
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
O UFER Ground(4295) El Ditch cover(4030) 0 Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
I .
O Pool Bonding(4195) 0 Temporary Power(4275) ❑ Service(4235)
Approved Approved Approved
By Date By Date By Date
o Feeders/Sub-panels(4045) [C] Rough Electrical(4225) D Ceiling Cover(4020)
Approved Approved Approved
By Date By Date Date' (,EI(.\
0 Final-Electrical(4055)
Approved
By A. Date
4-10-11,
FILE
0 Rough ElectricalEl Final Electrical El Right of Way
Approved Approved Approved
By Date By Date By Date