Loading...
17-100494 Electrical City of Federal Way FILE Permit #:17-100494-00-EL Community Development Dept. 33325 8th Ave S Federal way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: FARMERS INSURANCE Project Address: 33650 6TH AVE S Parcel Number:926480 0210 Project Description: Relocate VAV's Owner Applicant Contractor CAMPUS BUSINESS PARK JAM!COONTSDELTA CONNECTS INC DELTA CONNECTS INC PO BOX 1316 22522 29TH DR SE SUITE 104 DELTACI858K7(5/29/17) TACOMA WA 98401 BOTHELL WA 98021 22522 29TH DR SE SUITE 104 USA BOTHELL WA 98021 Additional Permit Information Is this an Online or O.T.C.application? Yes ..IIN �� .� Thermostat 4 PERMIT EXPIRES Friday,2 February,2018 Permit Issued on Thursday,February 2,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: 014LINIE Date: 4 THIS CARD IS TO REMAIN ON-SITE � Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 100494 00 Address: 33650 6TH AVE S Unit 110 Project: CAMPUS BUSINESS PARK FEDERAL WAY WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. i •ID UFER Ground(4295) ..1:1 Ditch cover(4030) El Slab/Concrete Floor(4255) ' Approved Approved Approved to place concrete By Date By Date By Date • ,® Pool Bonding(4195) ,,El Temporary Power(4275) „® Service(4235) Approved Approved Approved By Date By Date By Date ® Feeders/Sub-panels(4045) ® Rough Electrical(4225) ® Ceiling Cover(4020) Approved Approved Approved By Date ti By Date By t I,..1 Date 2-1 n_ in El Final-Electrical(4055) Approved By C-�j.,, Date ea, 1 f)�1'1 , 0 Rough Electrical 0 Final ElectricalD Right of Way Approved Approved Approved By Date , By Date By Date