Loading...
14-104834 4 • 111 Electrical Community&Econ.D City of Federalvv Services ay M Permit #: 14-104834-00-EL 33325 8th Ave S itImen I C Federal Way,WA 98003 Ph (253)835-2607 Fax:(253)835-2609 Inspection Request Line. (2 53)835-3050 Project Name: MIRZA Project Address: 34841 8TH PL SW Parcel Number: 132174 0430 Project Description: replace gas furnace and install heat pump Owner Applicant Contractor FARIDA MIRZA JAIMIE HOW BRENNAN HEATING&A/C LLC WAHEED MIRZA BRENNAN HEATING&A/C (ELECTRICAL) 34841 8TH PL SW 4601 S 134TH PL BRENNHA962DU(3/31/16) FEDERAL WAY WA 98023 SEATTLE WA 98168 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C.application Yes Is Use Educational or Institutional? No Electrical Fixtures'. Circuits-Residential 2 PERMIT EXPIRES Wednesday, March 18, 2015 Permit Issued on Friday, September 19, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: ONLINE 'INA LES 4' . • THIS CARD IS TO ' • I ON-SITE CITY OF Construction Ins t •ction Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 14-104834-00-EL Address: 34841 8TH PL SW Project: FARIDA MIRZA FEDERAL WAY, WA 98023 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. O LIFER Ground(4295) El Ditch cover(4030) ❑ Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date ❑ Pool Bonding(4195) ❑ Temporary Power(4275) ❑ Service(4235) Approved Approved Approved By Date By Date By Date ❑ Feeders/Sub-panels(4045) ❑ Rough Electrical(4225) ❑ Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date ❑ Final-Electrical(4055) Approved By Date Rough Electrical Final Electrical El Right of Way 1:1Approved ElApproved Approved By Date By Date By Date