09-103454 III �� • Mechanical
ty dWay #: Q
CommunCiity Dof evelopmentFeeral Services Permit 09-103454-00-M E
P.O.Box 9718
Federal Way,WA 98063-9718
Ph.(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253) 835-3050
Project Name: EGGER
Project Address: 3217 SW 325TH ST Parcel Number: 873190 2000
Project Description: replace gas 100k btu furnace and 50 gall hot water heater
Owner Applicant Contractor
G T EGGER CYNDAL MILLHOLLIN WASHINGTON ENERGY SERVICES CO
3217 SW 325TH ST NORTHWEST PERMIT INC/WASHINGTON (GENERAL)
FEDERAL WAY WA 98023-2500 ENERGY SERVICES WASHIES971 OB(9/2/09)
1345 W GULF RD 2800 THORNDYKE AVE W
POINT ROBERTS WA 98281 SEATTLE WA 98199
Additionalrmtnformatiion,
Mechanical Valuation 6517.00 Is this an Online or O.T.C.application? Yes
,i Mee iced ixtures *
` .R� �., , ..�-, R. .. _%�q....
Furnacesx,.,..., 1 f-lot Water Tanks 1
•
PERMIT EXPIRES Wednesday, March 3, 2010
Permit issued an Friday, September 4, 2009
I hereby certify that the above information is correct and that the Construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way. /�
Owner or agent: afr_,,,/,,,4,
Date: 9 90'7
\fc)
-4**44,„,%. ' • ' THIS CARD IS TOyMAIN ON-SITE
CITY OF • Construction Ilection Record.
Federal Way INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 09-103454-00-ME Address: 3217 SW 325TH ST
Owner: G T EGGER FEDERAL WAY, WA 98023-2500
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El Mechanical Rough-in (4165) -❑ Gas Piping(4125) ❑ Final-Mechanical (4065)
Approved Approved to release test Approved
By Date By DateBy Date(O(c. f. mow?
'
•
0 Rough Electrical Final Electrical El Right of Way
Approved Approved Approved
By Date ° By Date By Date