Loading...
13-100420 • • Plumbing City of Federal Way ww nn Community&Econ.Dev.Services Permit #: 13-1OV((���'F2V-0 O-PL 33325 8th Ave S Federal Way,WA 98003 Request Ph:(253)835-2607 Fax:(253)835-2609Inspectionq st Line: (253)835-3050 Project Name: YADON Project Address: 30605 21ST AVE SW Parcel Number: 416730 0010 Project Description: Replace tub/shower faucet. Owner Applicant Contractor , KENNETH YADON M T S PLUMBING CONTRACTORS INC M T S PLUMBING CONTRACTORS INC 30605 21ST AVE SW PO BOX 517 MTSPLCI164D7(7/6/14) FEDERAL WAY WA 98023-2375 AUBURN WA 98071 PO BOX 517 AUBURN WA 98071 Plumbing Fixtures Bathtubs 1 PERMIT EXPIRES Saturday, July 27, 2013 Permit Issued on Monday, January 28, 2013 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and t u e ill be in ac ort ce with the laws, rules and regulations of the State of Washington a ity of Federal Way. z Owner or agent _l Date: 11, THIS CARD IS TO IN ON-SITE f , CITY OF Construction In ection Record Federal Way INSPECTION REQUE TS: (253)835-3050 PERMIT#: 13-100420-00-PL Address: 30605 21ST AVE SW Project: KENNETH YADON FEDERAL WAY, WA 98023-2375 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspecti s n sequence. On-going inspections are logged on the back of this card. 0 Plumbing Groundwork(4190) Ei ' c igh Plumbing(4230) ❑ Gas Piping(4125) Approved to cover Approved Approved to release test By Date G5 Date I.,2G9..��_2 By Date ❑ Final-Plumbing(4075) Approved —13‹,. Date— 2 c"-- /3 ❑ Rough Electrical El Final ElectricalCI Right of Way Approved Approved Approved By Date By Date By Date r RElliVED CIT10P PERMI APPLICATION Federal Way IAN 2 S 2013 17014 CITY JOF FEDERAL WAY PERMIT NUMBER /3. - / DS0 7' ® _ / TARGET DATE SITE ADDRESS SUITE/UNIT 9 30Pa$ PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL 9 TYPE OF'PERMIT 0 BUILDING E PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT 4 4, J PROJECT DESCRIPTION 2x-c74.. o � Detailed description of work to (` %.„.74.e- IC-l t7<c 14-x"U 5 iV � be included on this permit only IPr NAME PRIMARY PHONE PROPERTY OWNER "CP 4 t.(fp4 i}P z6(-4% t MAILING ADDRESS I E-MAIL 30&o 2 i r w- -� CITY STATE ZIP, C4i> t).4 1 Z'3 NAME C `S 'FL,owttewe-) 6,t77-.. (Ur . 243 MAILING ADDRESS E-MAIL CONTRACTOR P.O �t3ts�` Sl A- Ace-'-(`-N.ai`l's£r} y' f CITY STATE ZIP FAX ?-)P,o,2 i,jfr ay-ra--t 1 Z,;-3 -`s 33-_3Yz Z. WA STATE CONTRACTOR'S LICENSE 9 EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE 4 tA'r5 `Pi,CT" i w- '- / iD / NAME PRIMARY PHONE APPLICANT MAILING ADDRESS E-MAIL ter CITY STATE ZIP FAX NAME PRIMARY PHONE PROJECT CONTACT L &4{2 (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence 0 +tea ei-tmtauo-tc&iiLe7I r concerning this application) CITYsr*Tg 72FAX NAME PROJECT FINANCING OWNER-FINANCED Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the re ance of the city, including its officers and employees, upon the accuracy of the information suppli to the city as apart oft a plication. '4d1 SIGNATURE: 1'‘2 DATE //Z.-eVC PRINT NAME: C i"1 Td 3Z`I S t C7 t-5— Bulletin#100-January 1,2013 Page 1 of 3 k:\Handouts\Permit Application „, ,,, • il VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(eommereisi) BOILERS FURNACES HOT WATER TANKS(Goo) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. I BATHTUBS(or1ub/shower Combo) LAVS(Hand sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS / OTHER(Describe DRAINS SHOWERS VACUUM BREAKERS 4I$)- V.`p DRINKING FOUNTAINS I SINKS)Kitchen/Utility) WATER HEATERS(eketric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS $ EXISTING/PREVIOUS USE LOT SIZE(Ia Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑Yes ❑ No ❑Yes ❑ No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) SECOND FLOOR COVERED ENTRY DECK GARAGE ❑ CARPORT ❑ OTHER(describe) Area Totals TOTAL **NEW HOMES maxi* ESTIMATED SELLING PRICE$ #OF BEDROOMS COMMERCIAL-NEW/ADDITION AREA DESCRIPTION Area Occupancy Construction #of in Square Feet P�cY Groups) TYPe Stories Additional Information NEW BUILDING ADDITION COMMERCIAL-REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet TYPe Stories TOTAL BUILDING TENANT AREA ONLY PROJECT AREA ONLY Bulletin#100-January 1,2013 Page 2 of 3 k:\Handouts\Permit Application