Loading...
12-101148 • *4 a t• Elerioal City of Federal Way . Community&Econ. Services FILE Permit #• 12-101148-00-EL 33325 8ththAveve S dWa ,WA Ph:(253) Fe835-2607eral yFax:(253)98003 835-2609 Inspection Request Line: (253)835-3050 Project Name: PARK CENTER BUILDING Project Address: 33400 8TH AVE S Parcel Number: 926500 0110 Project Description: Relocate(7)thermostats Owner Applicant Contractor BONHAM INVESTMENTS-PARK CTR1 NICK ADAMS NARROWS HEATING&AIR 1015 3RD AVE STE 900 NARROWS HEATING&AIR CONDITIONING CONDITIONING(ELECTRICAL) SEATTLE WA 5121 S BURLINGTON WAY NARROHCOO6DA (3/1/14) 98104 TACOMA WA 98409 5121 S BURLINGTON WAY TACOMA WA 98409 • Additional Permit information Is Use Educational or Institutional? No Service greater than 999 Amps? No Electrical Fixtures Thermostat. 7 PERMIT EXPIRES Wednesday, March 12, 2014 Permit Issued on Monday, March 12, 2012 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington oNt:IN Erat Way. Owner or agent: Date: - 7,• -Q THIS CARD IS TO MAIN ON-SITE FeOF deral Way • Construction In ection Record INSPECTION REQUE TS: (253)835-3050 PERMIT#: 12-101148-00-EL Address: 33400 8TH AVE S Project: BONHAM INVESTMENTS-PARK Cl FEDERAL WAY, WA 98003-6382 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El UFER Ground (4295) 0 Ditch cover(4030) 0 Slab/Concrete Floor(4255) Approved Approved Approved to place concrete By Date By Date By Date I 0 Pool Bonding(4195) 0 Temporary Power(4275) Service(4235) Approved Approved Approved By Date By Date By Date __, 0 Feeders/Sub-panels(4045) 0 Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By Date By 0.}4.,,___ Date —23 --I 2 El Final-Electrical(4055) Approved By 0 1s „ )—. Date c" — t 1 .--1, El Rough Electrical El Final ElectricalEl Right of Way Approved Approved Approved By Date By Date By Date