Loading...
14-101567 4110 ;Mezhanical Comm n &f Econ.Devv Services PEermit #: 14-101567-00-ME 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: Ph:(253)835-2607 Fax(253)835-2609 FIL P q (253)835-3050 Project Name: DANFORTH Project Address: 31238 8TH AVE SW Parcel Number: 555920 0095 Project Description: Install Heat Pump&Fan Coil to existing Gas Furnace Owner Applicant Contractor VALERIE K DANFORTH DAVE TREAT AUBURN SHEET METAL INC(GENERAL) 31238 8TH AVE SW AUBURN SHEET METAL INC AUBURI*222RQ(4/30/15) FEDERAL WAY WA 844 S MT VILLA DR PO BOX 1354 98023 ENUMCLAW WA 98022 ENUMCLAW WA 98022 Additional Permit Information Is this an Online or O.T.C.application? No Mechanical Fixtures Compressors/Heat Pumps 1 PERMIT EXPIRES Saturday, October 4, 2014 Permit Issued on Monday,April 7, 2014 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington tilit:iNit Way. Owner or agentON Date: \•+ *N1t111111‘%°t1°1 THIS CARD IS To. MAIN ON-SITE F . CITY OF - ' Construction In ection. Record Federal Way . INSPECTION REQ TS: (253)835-3050 PERMIT#: 14-101567-00-ME Address: 31238 8TH AVE SW Project: VALERIE K DANFORTH FEDERAL WAY,WA 98023-4625 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) ❑ Gas Piping(4125) 0 Final-Mechanical(4065) Approved Approved to release test Approved By Date By Date By --e-.. Date(_I Q_ iL) FILE El Rough Electrical Final Electrical Right of Way Approved Approved Approved By Date By Date By Date