16-100031 Ellectrical
City of Federal Way •
Community&Econ.Dev.Services
333W 8th Ave S F Permit6-100031-00-EL
Federal Way,WA 98003
Ph:(253)835-2607 Fax (253)835-2609
Inspection Request Line: (253)835-305
Project Name: SHEA
Project Address: 34513 8TH AVE SW Parcel Number: 132170 0340
Project Description: Install low voltage intrusion alarm
Owner Applicant Contractor
TIMOTHY H SHEA JENNIFER COVELLO AD T LLC
34513 8Th AVE SW ADT LLC ADTLLL*881D0(3/20/16)
FEDERAL WAY WA 11824 NORTH CREEK PKWY SUITE 105 11824 NORTH CREEK PKWY SUITE 105
98023-8403 BOTHELL WA 98011 BOTHELL WA 98011
•
Additional Permit Information
Electrical Work Valuation? 238 Is this an Online or O.T.C.application Yes
Is Use Educational or Institutional? No
Electrical Fixtures
Low Voltage-Burglar Alarm(Res 1
PERMIT EXPIRES Sunday, July 3, 2016
Permit Issued on Tuesday, January 5, 2016
I hereby certify that the above information is correct and that the construction on the above described property and
the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington
and the City of Federal Way.
Owner or agent: ONLINE Date:
��'�.02z
r 0 THS CARD IS TO MAIN ON-SITE w lb
CITY of � �. ��
Construction In ection Record
Federal Way INSPECTION REQUE TS: (253)835-3050
PERMIT#: 16-100031-00-EL Address: 34513 8TH AVE SW
Project: TIMOTHY H SHEA FEDERAL WAY, WA 98023-8403
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as
possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until itis approved. Check with your
inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
El UFER Ground (4295) El Ditch cover(4030) El Slab/Concrete Floor(4255)
Approved Approved Approved to place concrete
By Date By Date By Date
❑ Pool Bonding(4195) '0 Temporary Power(4275) ❑ Service(4235)
Approved Approved Approved
By Date By Date By Date
El Feeders/Sub-panels(4045) El Rough Electrical(4225) `El Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
El Final-Electrical(4055)
Approved
By `j" Date 3 _1 s_l L
❑ Rough Electrical CI Final ElectricalCI Right of Way
Approved Approved Approved
By Date By Date By Date