Loading...
01-08-2015 Future Phases for I5 & SR InterchangeFuture phases for I-5/SR 18 /SR 167 interchange Phase 11 A -E $22M B and D $37.5M C $22.5M $34.6M N S 348th St New access ramps to SR 161 will reduce congestion on S. 348th St. Rebuilds ramp to allow drivers more time to switch lanes before SR 161/S. 348th intersection Build flyover ramp to directly connect Weyerhaeuser Way to S. 348th St. Weyerhaeuser Way COMPLETED September 2012 New ramps help move traffic better and provides direct access from south bound 1 -5 to new ramps at SR 161 Build new exit at S. 356th to SR 161 Build a two lane ramp to increase capacity and allow drivers more time to switch lanes before Weyerhaeuser Way Add left turn lane from SR 161 to S. 356th St. S3 Add northbound auxiliary lane on 1 -5 to improve traffic flow Add southbound auxiliary L lane to improve merge from SR 18 to 1 -5 Rebuild SR 161 bridge to make room for new southbound auxiliary lane on 1 -5 S 360th St