Loading...
16-104104 Demolition City of FederalWay Permit #: 16-104104-00-D E Community&Econ.Dev.Services 33325 8th Ave S Federal Way,WA 98003 Ph:(253)835-2607 Fax:(253)835-2609 Inspection Request Line: (253) 835-3050 Project Name: CFA LOGISTICS INC Project Address: 1300 S 343RD ST Parcel Number: 202104 9125 Project Description: Demolition of 1800 squarefoot storage/warehouse building. Owner Applicant Contractor UMID CHAKHALOV UMID CHAKHALOV OWNER IS CONTRACTOR CFA LOGISTICS INC CFA LOGISTICS INC 11729 SE 249TH ST 11729 SE 249TH ST KENT WA 98030 KENT WA 98030 Additional Permit Information Demolition Valuation 9000 PERMIT EXPIRES Sunday, August 19, 2018 Permit Issued on Friday, August 19, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. y��^^; \ �j / / Owner or agent: Date: (/G / L /6 THIS CARD IS TO REMAIN ON-SITE CITY OF - `'�" Construction Inspection Record Federal Way INSPECTION REQUESTS: (253) 835-3050 PERMIT#: 16-104104-00-DE Address: 1300 S 343RD ST Project: UMID CHAKHALOV FEDERAL WAY, WA 98003-6738 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. El SWM Precon Site Mtg(4400) 0 Initial Erosion Control(4365) 0 Interim Erosion Control(4370) Approved To be done prior to breaking ground Approved By Date By Date By Date 0 Final Erosion Control(4375) ,El Final-Building(4050) Approved Approved By DateBy t `� Date ((S(4- ❑ Rough ElectricalEl Final Electrical Right of Way Approved Approved Approved By Date By Date By Date Al,O 9 2016 PERMIIIAPPLICATION ,,,_411kh....... CITY OF Federal-.Way CITY OF FEDERAL WAY ."- PERMIT NUMBER A -- - `/ 0 V / Q V _ 4E TARGET DATE SITE ADDRESS / SUITE/UNIT# 1370 .._.5 34/ 3'c'I C�7+. F-eq(-o j of l W AA VL'/-{ 9 200 PROJECT VALUATION ) ZONING ASSESSOR'S TAX/PARCEL# (''' i 0 () (,) (7.Z_ 0 al j 0 Y'- 9 • ( (2._,S- BUILDING ❑ PLUMBING ❑ MECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION NAME OF PROJECT CF4 o c i CT t L S PROJECT DESCRIPTION Pc'_j^ l of t l y nen/love rt t (obi,'ci ,i la(t'n , Detailed description of work to be included on this permit only NAME PRIMARY PHONE C'FA �-0,c1` V�'c S /Fit/ lrn I'd C'G.a of lvil tot' 2 5 3 z 36 k 5-06 PROPERTY OWNER MAILING ADDRESSE-MAIL II}'2 `i 2 Li 5I- tirnl`dCf.io i'S, nit'1/&®ill CITY STATE ZIP . IA f r11---- twit� `� goose V NAME,:-. � PHONE / 1 ,.,",/l, q�-C./ MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# NAME / / i' PRIMARY PHONE 1 ill Ifd ChlAVIPw\ICV -253 -73 6 k Sob APPLICANT MAILING ADDRESS _ / E-MAIL I1 -721 5 4: Z ii 1 t� iuNrv'dKot IC%i`SiIY5613m itCof) CITY STATE ZIP FAX -vv 1 Wl- q'hod 0 2 S3- 7 3E S `-i 3 3 NAME/ ,/ PRIMARY PHONE PROJECT CONTACT Vl m 11 Q C Llt A I(N'OV (The individual to receive and MIAILING ADDRESS a E-MAIL respond to all correspondence I l' 2 l+� 5 Z ti '11- >C,1 concerning this application) CITY STATE ZIP FAX V\-C1V,r (.. 1 g303 (? NAME PROJECT FINANCING ❑ OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs, expenses, and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person,including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a partjof this application. SIGNATURE: ) DATE 0 PRINT NAME: V1 � Vl . kt,t(01/ 01 Bulletin#100—February 22,2016 Page I of 2 k:\Handouts\Permit Application • • VALUE OF MECHANICAL WORK MECHANICAL PERMIT Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial) BOILERS FURNACES HOT WATER TANKS(Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing fixtures to remain. BATHTUBS(or Tub/Shower Combo) LAVS(Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS(kitchen/Utility) WATER HEATERS(Eeruio) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑ Yes ❑ No ❑Yes n No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) SECOND FLOOR COVERED ENTRY DECK GARAGE ❑ CARPORT ❑ OTHER(describe) EXISTING PROPOSED TOTAL Area Totals **NEW HOMES ONLY** ESTIMATED SELLING PRICE$ # OF BEDROOMS COMMERCIAL-NEW/ADDITION AREA DESCRIPTION Area in Occupancy Group(s) Construction #of Additional Information Square Feet Type Stories NEW BUILDING ADDITION COMMERCIAL-REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Occupancy Group(s) Construction #of Additional Information Square Feet Type Stories TOTAL BUILDING TENANT AREA ONLY PROJECT AREA ONLY Bulletin#100—February 22,2016 Page 2 of 2 k:\Handouts\Permit Application • RECEIVED • A, . COMMUNITY DEVELOPMENT DEPARTMENT 33325 8th Avenue South AUG 19 2016 Federal Way,WA 98003-6325 - CITY OF 253-835-2607;Fax 253-835-2609 Federal \IVay CIT( OF FEDERAL WAY CDS www.cityoffederalway.com DEMOLITION PERMIT REQUIREMENTS A demolition permit is required to remove any structure on a subject property. Demolition of separate structures may require separate permits. ❑ Address of Demolition: I.3CJ > 5 :7-33Tes, S---r- / ApP ac)Q(bki 9 /6 ❑ Prior to submitting a demolition permit, the following items must be signed by the respective agency or their approvals attached. Items not applicable to your project should be marked N/A. El A completed Construction Permit Application form is also required. 1.ASBESTOS ABATEMENT (Provide copy of Notice of Intent from Puget Sound Clean Air Agency 5. ELECTRICITY a e py of inection report by AHERA-certified� inspector) it &I-erg(City of Federal Way Bu lding Official)Viet /` r RA S -01 -ifAi `� 1.-0,5 be eel A/044,41 (Puget sound Energy) 2. FUEL STORAGE TANKS 6.GAS SUPPLY /A- , o Under grade tank(s)is/are present N Above grade tank(s)are present ❑Tank(s)has been pumped or removed under South King Fire& (Puget Sound Energy) Rescue permit prior to any dismantling or excavation N/A (South mg Fire and Rescue) 7.WATER- Public Source 1//'� c2'vteq..t.,— _) L-Pt leC IAV (t n t_`7r tS7. u li r) 3. SEPTIC SYSTEM (VIC-tE2 'fa r2mASk 116 - �-7Ep J / (7/r111408.WATER- Private Well (King County Environmental Services) A , �( (King Coun Environmental Services) 4.SANITARY SEWER 7 (Lakehaven Utility District) Bulletin#122—May 13,2015 Page 1 of 1 k:\Handouts\Demolition Permit Requirements DEPARTMENT OF COM�NITY DEVELOPMENT SERVICES 33325 8th Avenue South CITY OF 411111111:1114.1Federal Way,WA 98003-6325 Federal Way 253-835-2607;Fax 253-835-2609 www.ci tvoffederalway.corn DEMOLITION PERMIT CONTACT LIST This list of agencies may assist you in expediting the demolition permit process.Refer to the demolition permit requirements for signature blocks.All applicable signatures are required prior to permit approval. 1. Asbestos Removal: Puget Sound Clean Air Agency 110 Union Street, Suite 500 Seattle,WA 98101-2038 206-343-8800—OR—800-552-3565 www.pscleatiair.org • 2. Electricity: Puget Sound Energy Tacoma Public Utilities Attn: Construction Coordinator Customer Service 22828 68th Avenue South, Suite#102 —OR— 747 Market Street Kent,WA 98032 Tacoma,WA 98402 888-225-5773 253-383-9600 or 253-383-2471 3. Gas: Puget Sound Energy • 805 156`h Avenue NE Bellevue,WA 98004 888-225-5773 4. Telephone: Qwest Communications 801-962-2475 (phone)/801-237-6491 (fax) 5. Water: Lakehaven Utility District Tacoma Public Utilities Technical Service Division Customer Service 31623 First Avenue South —OR— 747 Market Street Federal Way,WA 98003 Tacoma,WA 98402 253-941-2288 253-383-9600 or 253-383-2471 6. Garbage: Waste Management 655 Second NW Auburn,WA 98071 253-833-3333 (residential)—OR—253-939-9792 (commercial) 7. Sewer: Lakehaven Utility District Technical Services Division 31623 First Avenue South Federal Way,WA 98003 253-941-2288 8. Septic: King County Environmental Services 14350 SE Eastgate Way Bellevue,WA 98007 206-296-4932 9. Fire Department: South King Fire&Rescue 33325 8th Avenue South Federal Way,WA 98003 253-946-7248 Bulletin#109—January 1,2011 Page 1 of 1 k:\Handouts\Demolition Permit Contact List • RECEIVED AUG 19 2016 pscleanair.org Puget Sound Clean Air Agency CITY OF FEDERAL WAY Notification Case #: 201604114 CDS This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III,4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # AUOFEA9DE8C9 Transaction Date 08/19/16 Owner's Name CFA Logistics Inc. Phone (206)422=5540 Project Street Address 1300 S 343rd City Federal way Zip 98003 Contact Person Umid Chakhalov Phone (206)422-5540 Mailing Address 11729 SE 249th St Kent,WA 98030 This project includes a demolition. Demolition Start Date 08/29/16 Completion Date 09/29/16 Demolition will be completed by a demolition contractor Demo Contractor Property Owner Contractor Job # Contact Phone Mailing Address (1) I certify that the information I have provided is to the best of my knowledge true and accurate. (2) I understand that I must file an Amendment to this Notification if: • The type of project has changed.The project types are asbestos and demolition. • The quantity of friable asbestos to be removed meets a larger project category. • The project's start or completion date has changed. (3) I understand one Notification must be filed for each structure. The only exception is for a single-family residence that includes multiple ancillary structures, such as a detached garage or other outbuildings having the same street address. If there is no street address, I have used a building number. (4) I understand the fees for this Notification are nonrefundable. Create Another Notification View History Loq Out If you have questions, contact us at asbestos@pscleanair.org or 206.689.4058. 9 0 - Asbestos Northwest, LLC - Survey Report 30620 Pacific Hwy S, #103, Federal Way, WA 98003 EyV�® 253.941.4343 AUG 19 2016 CITY OF FEDERAL WAY CDS -,..,1.'„,,,' rl,,,,!it h �X £`Yfyljiii e, to _._,,, ___ _ _ __ � 4 • Survey Location: 1300 S 343rd Federal Way, Wa Prepared for: Umid Chakhalor Date: August 16th, 2016 Asbestos Northwest Batch Number: 201611517 Inspectors: Dan Lafley (15-3556) Sean Butler (15-7824) E-mail: Danl(a�asbestosnw.com • • Table of Contents: 1. Background and Scope of Work 2. Building information 3. Material Sampling information 4. Asbestos Containing Material 5. Conclusions Appendices Appendix A Appendix B Appendix C Page 2 of 13 • • 1. Background Information and Scope of Work On August 16th, 2016 Asbestos Northwest, LLC conducted a survey of a shop located at 1300 S 343rd Federal Way, Wa The survey was conducted by Dan Lafley (15-3556) and Sean Butler (15-7824) who are Asbestos Hazard Emergency Response Act (AHERA) certified building inspectors. The survey was conducted to determine the presence of Asbestos Containing Materials (ACMs) before demolition of the building. The survey included the exterior and interior components of the building. Materials were located and sampled. They were then analyzed in-house at Asbestos Northwest. See section 3 for detailed sampling information. See appendix B for a detailed floor plan of the building including the survey area and any inaccessible areas, and appendix C for the complete laboratory report. Page 3 of 13 • ( • 2. Building Description The structure was a -1800ft2 garage / shop of unknown build date. The building was semi occupied at the time of the inspection and was in poor condition. The building has a main room which served at the garage, a bathroom, and a room off the garage. Interior The floor of the building was concrete and plywood with sheet vinyl in the bathroom. Walls and ceilings were textured drywall. Mechanical system The garage was not equipped with a heating system, and the plumbing was newer copper piping. Electrical system Wiring was newer rubber/plastic coating wiring, with an electrical box containing breakers. Roofing system and exterior The garage had two separate layers of corrugated metal roofing, with asphaltic felt between them. Siding was wood and metal. Insulation: The building was insulated with newer yellow fiberglass insulation. Page 4 of 13 0 • 3. Material Sampling Information Asbestos survey work performed by Asbestos Northwest meets inspection regulatory requirements enforced by federal, state, and local agencies, including Asbestos Hazard Emergency Response Act (AHERA), WAC 296-62-077 (WISHA) and 40 CFR Part 61 (NESHAP) and 29 CFR Part 1926.1101 (OSHA) Definitions Homogenous — Materials having the same appearance, texture, color, and were applied during the same general construction period are considered to be homogenous. Surfacing Material — Material that has been sprayed-on, troweled-on or otherwise applied to surfaces, such as acoustical plaster, fireproofing materials on structural members. Thermal Insulation Material — material applied to pipes, fittings, boilers, breaching, ducts, and other interior structural components to prevent heat loss or gain Miscellaneous Material — Building materials such as structural components, structural members or fixtures not included in surfacing and thermal insulation. Survey Methodology Before sampling began, inspectors documented the total surveyed area. A sketch of each space was created, and total square footage was measured and determined. The inspectors then determined the extent of each visible homogenous material throughout the survey area. Description Material Type Extent and Sample #'s and Condition Locations Texture, Joint Compound Miscellaneous / Walls and ceiling 1- East room wall and drywall Surfacing Material throughout building 2-East room Ceiling Friable 4-Bath Wall Semi Damaged 5-Bath ceiling 6-main room ceiling 7-main room wall Tan and Gray Sheet Vinyl Miscellaneous Floor of bathroom 3-Bath Floor Material Non Friable Good Condition Asphaltic paper Miscellaneous In between roof and on 8- Roof, East side Material siding. 9-Roof, West side Non Friable Good Condition Page 5 of 13 • 4. Asbestos Containing Material S A homogenous material is considered to be ACM (Asbestos Containing Material) if one or more samples are reported to have greater than 1% asbestos. Analysis can result in both positive and negative sample results in materials containing <10%, have very fine asbestos fibers, have been hand mixed, or have asbestos fibers tightly bound in the matrix. EPA recommends a minimum of three samples be analyzed by PLM for these types of materials. All materials that were sampled during the inspection were analyzed under PLM, EPA Method 600/R-93/116. During the inspection, the inspectors determined that no Asbestos Containing Material was located within the structure. Page 6 of 13 • • 5. Conclusions No Asbestos Containing Material was found during the inspection. Page 7 of 13 • 0 Appendix A — Certifications 0 CO 0 -. sio+k , a C) 0 7 ar ii3 (1% — ...., si4 ..... CD z 0 1'4: Sc 40;4- _ (.1 tt,„ iF, b" ;) CI a '<°' (/c41 c2* co oti a *F7-,*; lla C") z x. ...... w .t m to T., ........ 0 0 2 cr et't, >, CO -Itt 41 p1+ COI T)I 4 ,‘ C>5 ,,‘.. ,... 2 r+ 03 a 0 gm P ca. 3 ii ,„ , ...) ,„,•,, t.....,4_, . 0 ,..., 0 6 -- 4% CI - 0 ii 4. 6-. -0 r t,,/' (i) = 0 5, ,iz 0 •,, ut , -, 0 ,z, c, . cl. o wz Is 0 —0 r) '''' 0 eti—i 3 nri ,t1 , ' <-1") <0 0„-.• -tt -0 (II) Z 0 0 0 0 ar 0 it5 zr 0 o 0 o a3 c,f, •-,, Z. 0 •Z ,a) -. C) at is,..) 0- - 01 al a 0 g 0 ,:: :90 z 0, 0, ,c, .,--'•- CII 33 Page 8 of 13 • 1900 W Nickerson St,#315 Seattle,WA 98119 16 10.;I g 206185.3373 wcertifiesiv assmamssi:72 This certilles that Sean T. Butler has satisfactorily completed 4 hours of refresher training as an • Asbestos Building Inspector complies with TSCA Title II)40 CFR 763(AHERA) 6P144,044‘ . Aftmok Certificate# 157824 Instructor Cass Date:jun 29,2016 EPA Provider Certificate#1085 Expires: Jun 29.2017 1900 W Nickerson St,#3151 Seattle, A 98119 206 1 r ff..285.3373 VVji ......1 ...,,,,...“ ,,,,N,.-.i 1 This certifies that Daniel J. Lafley has satisfactorily completed 4 hours of refresher training as an Asbestos Building Inspector complies with TSCA Title ii!40 CFR 763(AHERA) Certificate# 153556 Class Date. Oct 21,2015 Instructor Expires: Oct 20,2016 EPA Provider Cervficace d 1085 Page 9 of 13 • Appendix B — Building Layout ij $ } t s i 9 # ' $ 4.444,4 444* } t k ; f • . + � a � k .._...pec._.. ,.._.,...... ,._._.__ ........._._. ." _ .•-__..._ .-x+>.. , I f 0 33 , 33I ._ btr33_3 , { f f .... t ts t { r t s l i 1 } --- _ # E e g ' 1 t r� -t ;31 € fI. 1 1 1 1 IP, ;T I 1 _r .411 r r ...t__... t i. I i i t } ,.E umimi S tRana. "Ma t { # t _ I NIP ; i NM I r bt i f 3 # i i i 1 amok i I ! 4- -11„-_ r _w miisma 4, j F , _ MIjr r —c • 1 , l „- • y -t 1 , 1 } t $ 3 t t' 4 gg t f I i a $ ._ Page 10 of 13 S 0 Appendix C — Laboratory Report , ri n.ORTHWESTiigi ASBESTOS \I- iigaikk Asbestos NW Batchtt \V2O MON Pada('Hwy S.MB,t ederal'W ay,WA 911003 T..7 f 253)4414343 ... N't.1.ST 1 ab it:20099341 Bulk Samples Chain of Custody(EPA 600/R-93/116) Name: Date: EV a,/zptica_ , Address: Fax 4: .....___ Project Manager Om : C..V.M.14WLV PM Cell#: Zito-q 22,-zf 4 41 Project Loeation: 1300 5 1 41Adird Project#: # Number of Samples; cyol (ii.„)ckyties..14V Turn around time: CI_ 4 Customer Sample ID Description Location/Condition A 06.41A-Ilk\ Ea e-k- P,pt,.y." 2 TWe -IL A Chi Pk 1 Ex ,f... isyy, cv\.? , 3e- 6e7t- kill-VI.t Bat-kr,, +1 cst-ile- 4 A tt N,,,......._.0. Zo° tjTh, LA30...1\ 5 ..r. ""C... A. ' )1114 t.A.- 4,_ 114IPP aa Cekli 6 TeYkOlre 3—C-- A. Dv0At. k Mocir‘ ovrv-t Zi . a- A it. vos a A z a s o S s'ti- IC. VI. it lett, • .r2,:b Sid-e R1C_, tA')ezi f--, .-,,ict:to lo i 1 12 13 14 I5 16 17 18 19 20 21 11 23 24 25 11,44 *Client will he notified if subcontracting is required Print Sign Company DateTimei _ Sampled by: r Relininished b • NA, I .0C'2,4 belivered by: it,. -4rglett .. . -- _.,Aceepted by: q 7 1./ Analyzed by: ( 1 tlyy 4/ fit/ A/ 1\-t g-44.)-/ - 2 OD Reviewed by: Page 11 of 13 • S • ASSESTOSaktirlijah' NORTHWEST 200993-0 Asbestos Northwest,LLC 30620 Pacific Hwy S.#103,Federal Way,WA 98003tc1m6ber: 201611517 Ph:(253)941-4343 Fax:(253)941-4175 PLM Analysis by EPA Method 600/M4-82-020 and 60B0a/R-h9 Attn: Date Received: 8/16/2016 timid Chakhalov Date Analyzed: 8/16/2016 1300 S 343rd Federal Way,Wa Samples Received: 9 Samples Analyzed: 9 Project: 1300 S 343rd Federal Way,Wa Project#: Client Sample %Non-Asbestos %Asbestos Fibers ID Lab Sample ID Layer Description Matrix Fibers and Type White powdery material Binder/filler, 1 1 40%Cellulose None Detected with paint and paper Paint White chalky material Filler/binder, 2 35%Cellulose None Detected with paper Gypsum/binder White powdery material Binder/filler, 2 2 40%Cellulose None Detected with paint and paper Paint White chalky material Filler/binder, 2 35%Cellulose None Detected with paper Gypsum/binder 3 3 1 Tan and Gray sheet vinyl Vinyl/binder None detected None Detected Tan fibrous material with Filler, 75%Cellulose, None Detected mastic Mastic/binder Synthetic fibers White powdery material Bindcrifiller, 4 4 1 40%Cellulose None Detected with paint and paper Paint White powdery material 2 Filler/binder 30%Cellulose None Detected with netting White chalky material Filler/binder, 3 Gypsum/binder 35%Cellulose None Detected with paper White powdery material Binder/filler,, 5 5 30%Cellulose None Detected with paint and netting Paint 7411/31711 ,,e41 Analyzed By-Cathy Butler Page 1 of 2 'e 4 • rira1ey Page 12 of 13 0 S ASBESTOS ;, #. '.�.., r,, ? NORTHWEST 200993-0 Asbestos Northwest,L1..0 30620 Pacific Hwy S,#103,Federal Way,WA 98003 Batch Number: 201611517 Ph:(253)9414343 Fax:(253)941-4175 PLM Analysis by EPA Method 600/M4-82-020 and 600/R-93/116 Attn: Date Received: 8/16/2016 Umid Chakhalov Date Analyzed: 8/16/2016 1300 S 343rd Federal Way,Wa Samples Received: 9 Samples Analyzed: 9 Project: 1300 S 343rd Federal Way,Wa Project#: Client Sample %Non-Asbestos %Asbestos Fibers ID Lab Sample ID Layer Description Matrix. Fibers and Type White chalky material Filler/binder, 2 35%Cellulose None Detected with paper Gypsum/binder 6 6 I White powdery material Binder/filler, Iter, 40%Cellulose None Detected with paint and paper Paint White chalky,material Filler/binder, 2 35%Cellulose None Detected with paper Gypsum/binder 7 7 1 White powdery material Binder/filler, 5%Cellulose None Detected with paint Paint White chalky material Filler/binder, 35%Cellulose None Detected with paper Gypsum/binder 8 8 Black asphaltic fibrous Asphalt/binder 75%Cellulose None Detected material asphaltic fibrous 9 9 2 Black as P Asphalt/binder 80%Cellulose None Detected material 00(21/1 Fti t6( **) A O Analyzed By:Cathyzed Butler Page 2 of 2 ' vowed By. ip Page 13 of 13