Loading...
16-101213 4. . • r ` .: . . pa= Building -Single Family City of Federal Way ILE Community&Econ.Dev.Services a Permit #: 16-101213-00-SE 33325 8th Ave S Ph (253)Fed835eral-2607Fway,WAax:(29583°)735 -2609 ns 5 p Q IInspection Request Line: (253)835-3050 : Project Name: GILLETT Project Address: 2645 S 298TH ST Parcel Number: 768380 0291 Project Description: ADD-Contruction of a 500 square foot addition to be used as a workshop.No Mechanical or Plumbing. Owner Applicant Contractor Lender CHARLES GILLETT CHARLES GILLETT OWNER IS CONTRACTOR OWNER IS LENDER MARY ANNE GILLETT 3429 S 308TH PL 3429 S 308TH PL FEDERAL WAY WA 98002 AUBURN WA 98001-3212 Census Category: 434 -Residential alt/add-no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 0 0 0 0 Additional Permit information New/Additional Sq.Feet-1st Floor 500 New/Additional Sq.Feet-2nd Floor 0 New/Additional Sq.Feet-3rd Floor 0 New/Additional Sq.Feet-Basement 0 Calculated Structure Valuation 22315.00 Occupancy#1 -Construction Type. Type V-B New/Additional Sq.Feet-Deck 0 New/Additional Sq.Feet-Garage 0 Mechanical to be Included? Yes Occupancy#1 -Class R-3 New/Additional Sq.Feet-Other 0 Plumbing to be Included'? Yes New/Additional Sq.Feet-Total 500 Occupancy#1-Use Residence(1 or 2 family) No Fixtures:Associated With This Permit!! PERMIT EXPIRES Saturday, December 17, 2016 Permit Issued on Monday,June 20, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and City of Federal Way. Owner or agent: "� g/ Date: 6 THIS CARD IS TO REMAIN ON-SIT> d . ' .. • cnrr of'���li � Construction Ins ection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 16-101213-00-SF Address: 2645 S 298TH ST Project: CHARLES GILLETT FEDERAL WAY, WA 98003-4220 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ❑ SWM Precon Site Mtg(4400) ❑ Initial Erosion Control(4365) 0 Footings/Setback(4110) Approved To be done prior to breaking ground Approved to place concrete By Date By Date By A,3 Date al 7/112 ❑ Foundation Wall(4115) ❑ Drainage/Downspout(4040) . ❑ Plumbing Groundwork(4190) Approved to place concrete Approved to backfill Approved to cover By 9.) Date °161.((/ By 11`(‘) Date 1.4114)/7 By Date ❑ Slab/Concrete Floor(4255) ❑ Underfloor Framing(4285) ❑ Floor Sheathing(4105) Approved to place concrete Approved to sheath floor Approved to install flooring By Date By Date By Date ❑ Shear Walls(4245) 0 Roof Sheathing(4220) 0 Rough Plumbing(4230) Approved to install siding Approved to install roofing Approved By A.,ij Date 1,1j71/7 By Date By Date * . �►-U.S l o-y-tb ❑ Mechanical Rough-in(4165) El Gas Piping(4125) ElFire/Draft Stops(4095) Approved Approved to release test Approved By Date By Date By Date ❑ Interim Erosion Control(4370) Framing4120 Approved to scheduling a Framinspectin; ( ) PP Electrical,Plumbing&Mechanicaling Rongb oin and Approved to insulate Fire/Draft Stop inspections must be signed-off and By Date approved. IBC 109.3.4 By (2_4Aja Date 14...) <El'- ❑ Insulation(4150) . ❑Gypsum Wallboard Nailing(4130)- ❑ Final Erosion Control(4375) Approved to install wallboard Approved to install mud'&tape Approved By Loa... Date ,) o.. Cl By 4. . Date `"f I j ti/) 1 By Date ❑ Final-Mechanical(4065) Final- 'lumbi. 1 (4075) ❑ Final-Building(4050) Approved •pro • Approved By Date By I . By FAL Date 11 .444.47 ui-ev_ or, - 9)1 116 *', El Rough Electrical C3 Final Electrical Right of Way ' ApprovedApproved ❑ Approved By Date By Date By Date "`�.�.�►► PERMITPPLICATION CITY OF wawa)Federal Way 0 12- 1 3 5 �' MAR_10 2016 tl 7 PERMIT NUMBER _ - TARGERA0F FEDERAL WAY CD SITE ADDRESS SUITE/UNIT# 5 S iq -11•L PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# lv g 3 45- O p -Z- 7 TYPE OF PERMIT BUILDING 0 PLUMBING ❑ MECHANICAL ❑ DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT i )60 <40,4 PROJECT DESCRIPTION ;le, 04:9 x ®� S�-Z� Detailed description of work to be included on this permit only � .-- PRIMARY PHONE 6°'/' C� ' 4c , 24 25-5-6 '74° —94/g5"-- PROPERTY OWNER MAILING ADDRESS E-MAIL 3` � ? S • 39b A''- 9' /e 571 ter • . CITY STATE ZIP 1-4" ' NAME PHONE MAILING ADDRESS E-MAIL CONTRACTOR CITY STATE ZIP FAX WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# .. NAME PRIMARY PHONE Y -. /1e APPLICANT MAILING ADDRESS E-MAIL CITY STATE ZIP FAX NAME .... - PRIMARY PHONE PROJECT CONTACT Q4-,7 e-," \. (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence concerning this application) CITY STATE ZIP FAX NAME PROJECT FINANCING © Pk OWNER-FINANCED When value is$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. SIGNATURE: DATE ?"/D / PRINT NAME: Z Bulletin#100-February 22,2016 Page 1 of 2 k:\Handouts\Permit Application • VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ P•iPr- Indicate how many of each type of fi ture to be installed or relocated as part of this project.Do not include existing ures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial) BOILERS FURNACES HOT WATER TANKS(Gao) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES PLUMBING PERMIT VALUE OF PLUMBING WORK Indicate how many of each type of fixture to be installed or relocated as part of this project.Do not include existing res to remain. BATHTUBS(or Tub/Shower Combo) LAVS(Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS SINKS(Kimhen/Utuity) WATER HEATERS(Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS NJ D C1,1,/, � $ EXISTING/PREVIOUS USE LOT SIZk(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? 22- , 3 2 o ❑Yes ❑ o ❑Yes No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR(or Mobile Home) ( 1-)0 50 0 ' 1(0 7 0 SECOND FLOOR COVERED ENTRY DECK GARAGE ❑ CARPORT ❑ OTHER(describe) Area Totals EXISTING PROPOSED TOT �r0 5®D Ile U **NEW HOMES ONLY** ESTIMATED SELLING PRICE$ #OF BEDROOMS COMMERCIAL—NEW/ADDITION AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information Square Feet Type Stories NEW BUILDING ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area in Occupancy Group(s) Construction #of Additional Information Square Feet Type Stories TOTAL BUILDING TENANT AREA ONLY PROJECT AREA ONLY Bulletin#100-February 22,2016 Page 2 of 2 k:\Handouts\Permit Application