Loading...
14-104515 A • �. •. � Building - Multi Family City of Federal Way Permit #: 14-104515-00-ME,.. Community&Econ.Dev.Services 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (2 53)(253)835-2607 Fax (253)835-2609 pe a 835-3050 Project Name: HIGH POINT APARTMENTS BUILDING M(fa Bldg P) Project Address: 1066 S 320TH ST Bldg M Parcel Number: 082104 9188 Project Description: NEW-Construction of a 3-story building with a 6-car garage on first floor and 2-story duplex on the second&third floors,including plumbing&mechanical. •Owner Applicant Contractor Lender HIGH POINT 320 LLC JEF MONDONEDO HEARTLAND CONSTRUCTION CITIBANK 10900 8TH AVE S R D+A(ROSS DECKMAN& HEARTCI052Q7(1/3/18) ONE SANSOME ST FLOOR 27 BELLEVUE WA 98004 ASSOCIATES) 11100 MAIN ST SUITE 301 SAN FRANCISCO CA 94104 207 4TH AVE SE BELLEVUE WA 98004 PUYALLUP WA 98372 Census Category: 103 -New Two-Family Building Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 3,392 0 0 0 Additional Permit Information New/Additional Sq.Feet-1st Floor 1720 New/Additional Sq.Feet-2nd Floor 1672 New/Additional Sq.Feet-Garage 1583 Mechanical to be Included? Yes Number of Stories. 3 Permit for Building Shell Only? No Plumbing to be Included? Yes New/Additional Sq.Feet-Total 4975 Occupancy#1-Use Residence(1 or 2 Zoning Designation. CC-F family) Mechanical Fixtures Ducting 12 Fans 10 Plumbing Fixtu Bathtubs6 Dishwashers 2 Drains 12 Laundry Washer Outlets. 2 Lavatories S 6 Sinks 2 Water Closets 6 Water Heatert 2 Hose Bibbs 2 DITIQNS: Prior to Building Final and/or Certificate of ccupancy(C of 0),all street improvements,street lighting,and traffic signal improvements shall be complete and approved by Public Works. Prior to Building Final and/or Certificate of Occupancy(C of 0),the owner shall dedicate right of way for the 11th P1 S road extension through the site. Prior to Building Final and/or Certificate of Occupancy(C of 0),the owner shall dedicate a 10-foot Tract X along the west property frontage between 11th P1 S and the west property line. Prior to Building Final,the fire pump in Building C shall be fully operational. • • • PERMIT EXPIRES Sunday, August 7, 2016 �+ Permit Issued on Tuesday, September 29, 2015 s I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way5 . al-eirral)Addirk---S.S Owner or agent: C'(U.(4 Date: City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: HIGH POINT APARTMENTS BUILDING M(fka Permit#: 14-104515-00-MF Address: 1066 S 320TH ST BIdgM Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 3,392 0 0 0 Owner Name: HIGH POINT 320 LLC Owner Address: 10900 8TH AVE S BELLEVUE WA 98004 2I2-t tin Building Official Da The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most sever!),affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. +ECEIVED CITY OF SEP 0 9 2014 PERMIT APPLICATION Federal Way CIEEOF y+ DEp ` AY _• ®� PERMIT NUMBER 14 _ L� -•.S1 TARGET DATE SITE ADDRESS SUITE/UNIT# 1066 S 320th St--Building P PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL# $30,599,570.00 CCF 082104-9188 TYPE OF PERMIT X BUILDING 0 PLUMBING 0 MECHANICAL 0 DEMOLITION 0 ENGINEERING 0 FIRE PREVENTION NAME OF PROJECT High Point Apartments PROJECT DESCRIPTION 6-car Garage (lot floor) &Duplex(2nd&3rd floors)/ 3-story Multi-Family building. Detailed description of work to be included on this permit only NAME PRIMARY PHONE PROPERTY OWNER High Point 320,LLC 425 4539551 MAILING ADDRESS E-MAIL 10900 NE 8TH ST Suite 1200 tneubauer@devcoapts.com CITY STATE ZIP Bellevue WA 98004 NAME PHONE Heartland Construction 425 4539551 MAILING ADDRESS E-MAIL CONTRACTOR 10900 NE 8TH ST Suite 1200 tneubaue adevcoapts.com CITY STATE ZIP FAX Bellevue WA 98004 425 4539566 WA STATE CONTRACTOR'S LICENSE# EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE# HEARTCI052Q7 01/13/2016 20-13-102125-00-BL NAME PRIMARY PHONE Jef Mondonedo 253 8409405 APPLICANT MAILING ADDRESS E-MAIL 207 4th Ave SE jm(dj darchitect.com CITY - STATE ZIP FAX Puyallup WA 98372 253 8409503 NAME PRIMARY PHONE PROJECT CONTACT Jef Mondonedo 253 8409405 (The individual to receive and MAILING ADDRESS E-MAIL respond to all correspondence 207 4th Ave SE jm(afdarchitect.com concerning this application) CITY STATE ZIP FAX Puyallup WA 98372 253 8409405 NAME PROJECT FINANCING Citi Bank 0 OWNER-FINANCED Required value of$5,000 or more MAILING ADDRESS,CITY,STATE,ZIP PHONE (RCW 19.27.095) One Sansome St,27th Floor,San Francisco,CA 94104 415 6276027 I certify under penalty of perjury that I am the property owner or authorized agent of the property owner.I certify that to the best of my knowledge,the information submitted in support of this permit application is true and correct.I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit.I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. I further agree to hold harmless the City of Federal Way as to any claim(including costs,expenses,and attorneys'fees incurred in the investigation and defense of such claim),which may be made by any person,including the undersigned,and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the„kity as a part of this application. SIGNATURE: fir' r DATE ti°,- 411;;IC PRINT NAME: Bulletin#100—January 1,2013 Page 1 of 3 k:\Handouts\Permit Application i VALUE OF MECHANICAL WORK MECHANICAL PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. AIR HANDLING UNITS 10 FANS GAS PIPE OUTLETS OTHER(Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS(commercial} BOILERS FURNACES HOT WATER TANKS(Oar) COMPRESSORS GAS LOG SETS REFRIGERATION SYST 12 DUCTING GAS PIPING WOODSTOVES VALUE OF PLUMBING WORK PLUMBING PERMIT $ Indicate how many of each type of fixture to be installed or relocated as part of this project. Do not include existing fixtures to remain. 6 BATHTUBS(erTub/show« 6 LAVS(Hand Sinks 6 TOILETS WATER PIPING Combo) 2 DISHWASHERS RAINWATER SYSTEMS URINALS OTHER(Describe) 12 DRAINS SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS 2 SINKS(Kitchen/Utility) 2 WATER HEATERS (Eimtrio 2 HOSE BIBBS SUMPS 2 WASHING MACHINES 40 TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS YES LAKEHAVEN LAKEHAVEN EXISTING/PREVIOUS USE LOT SIZE(In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? VACANT 428,423 SF(9.84 AC) 0 Yes X No 0 Yes X No RESIDENTIAL - NEW OR ADDITION AREA DESCRIPTION(in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE FIRST FLOOR(or Mobile Home) 1,583 1,583 THIRD FLOOR 1,672 1,672 z 1CK `� r • a \ GARAGE ❑ CARPORT ❑ EXISTING ..•PROPOSED TOTAL Area Totals 4,975 4,975 ESTIMATED SELLING PRICE$ N/A #OF BEDROOMS 10 COMMERCIAL—NEW/ADDITION Area OccupancyConstruction #of AREA DESCRIPTIONAdditional Information in uare FeeGroup(s) Type Stories ��r VB ADDITION COMMERCIAL—REMODEL/TENANT IMPROVEMENTS AREA DESCRIPTION Area Occupancy Group(s) Construction #of Additional Information in Square Feet Type Stories \` \ *FAL '&DIMS'.$n' i �/ TENANT AREA ONLY . Nrq Bulletin#100—January 1,2013 Page 2 of 3 k:\Handouts\Permit Application IF ,� Building Multi Fawily . ' City of Federal Way Permit #: 14-104515-00-MIS Community&Econ. ev.Services 33325 8th Ave S , Federal Way,WA 98003 , Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 i) Project Name: HIGH POINT APARTMENTS BUILDING P Project Address: 1066 S 320TH ST Bldg P Parcel Number: 082104 9188 Project Description: NEW-Construction of a 3-story building with a 6-car garage on first floor and 2-story duplex on the second&third floors,including plumbing& mechanical. Owner Applicant Contractor Lender HIGH POINT 320 LLC JEF MONDONEDO HEARTLAND CONSTRUCTION CITIBANK 10900 8TH AVE S R D+A(ROSS DECKMAN& HEARTCI052Q7(1/3/16) ONE SANSOME ST FLOOR 27 BELLEVUE WA 98004 ASSOCIATES) 11100 MAIN ST SUITE 301 SAN FRANCISCO CA 94104 207 4TH AVE SE BELLEVUE WA 98004 PUYALLUP WA 98372 Census Category: 103 -New Two-Family Building Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 3,392 0 0 0 Additional Permit Information New/Additional Sq.Feet-1st Floor 1720 New/Additional Sq.Feet-2nd Floor 1672 New/Additional Sq.Feet-Garage 1583 Mechanical to be Included Yes Number of Stories. 3 Permit for Building Shell Only9 No Plumbing to be Included? Yes New/Additional Sq.Feet-Total 4975 Occupancy#1-Use Residence(1 or 2 Zoning Designation. CC-F family) Mechanical Fixtures Ducting 12 Fans 10 Plumbing Fixtures Bathtubs 6 Dishwashers 2 Drains 12 Laundry Washer Outlets. 2 Lavatories 6 Sinks 2 Water Closets 6 Water Heaters 2 Hose Bibbs 2 CONDITIONS: Prior to Building Final and/or Certificate of Occupancy(C of 0),all street improvements,street lighting,and traffic signal improvements shall be complete and approved by Public Works. Prior to Building Final and/or Certificate of Occupancy(C of 0),the owner shall dedicate right of way for the 11th P1 S road extension through the site. Prior to Building Final and/or Certificate of Occupancy(C of 0),the owner shall dedicate a 10-foot Tract X along the west property frontage between 11th P1 S and the west property line. • • - •- _ =-Alt-;; . PERMIT EXPIRES Sunday, March 27, 2016 4}, 1.-..,, 1 Permit Issued on Tuesday, September 29, 2015 I hereby certify that the above information is correct and that the construction on the above described property and . the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington Lv--4and the City of Federal Way. Owner or agent: Date: q - City of Federal Way Certificate of Occupancy This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed by City staff. Tenant Name: HIGH POINT APARTMENTS BUILDING P Permit#: 14-104515-00-MF Address: 1066 S 320TH ST BldgP Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V-B Occupancy Load: Floor Area(sq.ft.) 3,392 0 0 0 Owner Name: HIGH POINT 320 LLC Owner Address: 10900 8TH AVE S BELLEVUE WA 98004 2 1Z111, Building Official Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which [ experience has shown most severiy affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible(within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which it is situated. Such compliance is the responsibility of the owner and/or occupant of the premises. . DATE INSPECTOR AREA AND TYPE OF INSPECTIO b44 R(tint 1Y PArh'at �v rwi N - 944 4 11412‘ IA* a Ian 1 v6p-1441 D i - 714,19 I if.swh-kryi • s 111.9 1114, y a w - Twb -Pce,4 hldol pt vclAe✓' VG Ivt, Coe.tic 4112404, i rI sterool - T417 Divevht, v tvcc --1.07 is Hu" Pt:Pi urtIx - Twb tIins• cress t(- I2qu, -G. ww) t l (ii,(1,, 4 tom!►_ K-K ir,e o v 504-4 asumAaootrA • tvj I I"10511-1 l 1%6°4-Cat RK41 hn.t(dt►AY►;Gkt 4 f ttomk is — 01,1 ` THIS CARD IS TO REMAIN ON-SITE CITY°F � Construction Inspection Record Federal Way INSPECTION REQUESTS: (253)835-3050 PERMIT#: 14-104515-00-MF Address: 1066 S 320TH ST Bldg P Project: HIGH POINT 320 LLC FEDERAL WAY, WA 98003 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. O Footings/Setback(4110) 0 Foundation Wall(4115) 0 Drainage/Downspout(4040) Approved to place concrete Approved to place concrete Approved to backfill ' S Date t-2_ \,..k._ l�' By AO Date I 2123115 . .By p, 1� Date i '. ,J5 I Re-steel(4215) '0 Plumbing Groundwork(4190) '0 Slab/Concrete Floor(4255) Approved to place concrete or grout Approved to cover Approved to place concrete By Date By A,IN3 Date ,(5f/(I .By A.N\ Date off[q / i Co ❑ Underfloor Framing(4285) El Floor Sheathing(4105) El Shear Walls(4245)1 Approved to sheath floor Approved to install flooring Approved to install siding By Date By 40 Date Co-I 7,q)/(e, By y4 IJ Date k 12311k •❑ Roof Sheathing(4220) • 'El Rough Plumbing(4230) 0 Mechanical Rough-in(4165) Approved to install roofing Approved Approved By ,1v Date (.9.'22 1 J�. By Date 1 1 S f I b By V4rso Date Cj 124 IlAgs • ® Gas Piping(4125) El Fire/Draft Stops(4095) Prior to scheduling a Framing inspection; Approved to release test Approved Electrical,Plumbing&Mechanical Rough-in and Fire/Draft Stop inspections must be signed-off and By Date By luis Date to(I 1 I (ti approved. IBC 109.3.4 O Framing(4120) El Insulation(4150) ❑Gypsum Wallboard Nailing(4130) Approved to insulate Approved to install wallboard Approved to install mud&tape By lititm Date l o(r,`l y By %w Date lo(2.1 I t c• By M3 Date It[1,11,1,6, ▪ Suspended Ceiling Grid (4265) 4❑ Final-SKF&R(4060) ❑ Final-Planning Approved to drop tile Approved Approved By Date By Date By Date • Final-Public Works(4080) El Final-Mechanical(4065) Final-Plumbing(4075) Approved Approved Approved By Date By t44.4 Date I 11.4,11 ' By Date l I 2,611 7 ❑ Final-Building(4050) Approved By lik4 Date ( I 17 I 11 Rough Electrical Final Electrical Right of Way EJApproved ElApproved ElApproved By Date By Date By Date