Loading...
16-1041231 City ftFederal Way Community & Econ. Dev. Services 33325 8th Ave S e Federal Way, WA 98003 a Ph: (253) 835-2607 Fax: (253) 835-2609 a+ J Project Name: LAKE HAVEN ESTATES LOT 1 Project Address: 1825 SW 340TH ST Building --*-Single -Fa►ily Permit #: 16 -104123 -00 -SF Inspection Request Line: (253) 835-3050 Parcel Number: 403325 0010 Project Description: NEW - Construction of a 2 -story, 2,600 square foot single family residence with a 101 square foot covered entry, a 88 square foot deck and a 511 square foot attached garage, including plumbing and mechanical. *** 4 bedrooms; $400,000 estimated selling price*** Owner nlicant Contractor Lender JK MONARCH LLC FILIPP KAPUSTIN J K MONARCH LLC COLUMBIA BANK PO BOX 188 J K MONARCH JKMONML874NA (8/1/17) 5727 N 21ST ST PUYALLUP WA 98371 PO BOX 188 PO BOX 188 TACOMA WA 98401 Residence (1 or 2 PUYALLUP WA 98371 PUYALLUP WA 98371 Census Category: 434 - Residential altladd - no change in number of units Includes: #1 #2 #3 #4 Occupancy Class: R-3 Construction Type: Type V - B Occupancy Load V - B Floor Areas . ft. 2,600 0 0 0 Additional Permit Information New / Additional Sq. Feet - 1 st Floor....................1913 New / Additional Sq. Feet - 3rd Floor....................0 New / Additional Sq. Feet - Basement.:.................0 Occupancy #1 - Construction Type ........................Type V - B New / Additional Sq. Feet - Garage .......................511 Plumbing Work Valuation?....................................8100 Occupancy #1 - Class.............................................R-3 Plumbing to be Included? ....................................... es Occupancy # 1 - Use ............................................... Residence (1 or 2 family) New / Additional Sq. Feet - 2nd Floor...................687 Occupancy # 1 - Area (Sq. Feet).............................2600 Calculated Structure Valuation..............................319371.98 New / Additional Sq. Feet - Deck .......................... 88 Mechanical to be Included?...................................Yes Mechanical Work Valuation?.................................8000 New / Additional Sq. Feet - Other ..........................101 New / Additional Sq. Feet - Total .......................... 3300 Mechanical Fixtures Fans ................................................ 7 Fireplace Inserts............................. 1 Furnaces......................................... 1 Gas Pipe Outlets ............................. 2 Plumbing Fixtures Bathtubs ......................................... 2 Dishwashers................................... 1 Laundry Washer Outlets................ 1 Lavatories ....................................... 5 Showers.......................................... 2 Sinks..............:. Water Closets ................................. 3 Water Heaters................................. 1 Hose Bibbs..................................... 2 PERMIT EXPIRES Tuesday, March 14, 2017 Permit Issued on Thursday, September 15, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will In accord nce with the laws, rules and regulations of the State of Washington d th ity of Federal Way. Owner or agent Dater Pity of Federal Way Certificate of Occupancy .r - This Certificate issued pursuant to the requirements of Section 110.2 of the International Building Code certifying that at the time of issuance, this structure was in compliance with the various ordinances of the City regulating building construction or use. This certificate is valid ONLY when endorsed byCfty staff. Tenant Name: LAKE HAVEN ESTATES LOT 1 Permit #: 16 -104123 -00 -SF Address: 1825 SW 340TH ST Includes: #1 #2 #3 #4 Occupancy Class. R-3 Construction Type: Type V - B Occupancy Load Floor Area (sq. ft.) 1 2,600 1 0 0 0 Owner Name: JK MONARCH LLC Owner Address: PO BOX 188 PUYALLUP WA 98371 uilding Official 3 9 Date The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which experience has shown most severly affect the health and safety of the general public. Although the City has made as complete a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees nor warrants to the owner/ occupant or to any otherperson that this Certificate evidences strict compliance with each and every ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon which itis situated. Such compliance is the responsibility of the owner and / or occupant of the premises. DATE EN'SPECTOR AREA ANDINIT OF INSPECTION � Z5 ,q. - -etio� Sod'► 5 GK All Crero 0 w 5 , Federal Way PERMIT #: THIS CARD IS TO REMAIN ON-SITE Construction Inspection Record INSPECTION REQU TS: (253) 835-3050 16 -104123 -00 -SF Address: 1825 SW 340TH ST C Project: JK MONARCH LLC FEDERAL WAY, WA 98023 Scheduled inspections maybe failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card - Foundation Wall (4115) Approved to place concrete By� S Date C) _ 6 Slab/Concrete Floor (4255) Approved to place concrete By Date Shear Walls (4245) Approved to install siding By YWj Date 1 C+ v7 0 Mechanical Rough -in (4165) Approved By kNDate too -I Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to install wallboard By Date Final - Mechanical (4065) Approved By Ito Date SI -i 9I Z6 - Mere. C�kr' Drainage/Downspout (4040) Approved to backfill By 4 fj Date IOI 1 z j k Underfloor Framing Approved to sheath floor Date i t 0 Roof Sheathim Approved to install By )4 f j Date 121 -q Gas Piping (4125) Approved to release test By Date — 140 - `.-.) Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in jand Fire/Draft Stop inspections must be signed -off approved IBC 1093.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By p o" Date a- Q - 0 Final - Plumbing (4075) Approved By )v Date 3)4 Plumbing Groundwork (4190) Approved to cover W *+ By Date 1 Floor Sheathing (4105) Approved to install flooring By Date 0 Rough Plumbing (4230) Approved Byes Date - f Q' t1 Fire/Draft Stops (4095) Approved By tW Date I/ l 0 Framing (4120 Approved to insulate kr By Date 0 Final E Control (4375) Approved By Date Final - Building (4050) Approved By Arj Date 3)2V/,' SWM Precon Site Mtg (4400) Initial Erosion Control (43 5)Footing 11 Setback (411 ) Approved Right of Way To be done prior to breaking ground Approved to place concrete By Date [By Date By Alrj Date q12,&111, Foundation Wall (4115) Approved to place concrete By� S Date C) _ 6 Slab/Concrete Floor (4255) Approved to place concrete By Date Shear Walls (4245) Approved to install siding By YWj Date 1 C+ v7 0 Mechanical Rough -in (4165) Approved By kNDate too -I Interim Erosion Control (4370) Approved By Date Insulation (4150) Approved to install wallboard By Date Final - Mechanical (4065) Approved By Ito Date SI -i 9I Z6 - Mere. C�kr' Drainage/Downspout (4040) Approved to backfill By 4 fj Date IOI 1 z j k Underfloor Framing Approved to sheath floor Date i t 0 Roof Sheathim Approved to install By )4 f j Date 121 -q Gas Piping (4125) Approved to release test By Date — 140 - `.-.) Prior to scheduling a Framing inspection; Electrical, Plumbing & Mechanical Rough -in jand Fire/Draft Stop inspections must be signed -off approved IBC 1093.4 Gypsum Wallboard Nailing (4130) Approved to install mud & tape By p o" Date a- Q - 0 Final - Plumbing (4075) Approved By )v Date 3)4 Plumbing Groundwork (4190) Approved to cover W *+ By Date 1 Floor Sheathing (4105) Approved to install flooring By Date 0 Rough Plumbing (4230) Approved Byes Date - f Q' t1 Fire/Draft Stops (4095) Approved By tW Date I/ l 0 Framing (4120 Approved to insulate kr By Date 0 Final E Control (4375) Approved By Date Final - Building (4050) Approved By Arj Date 3)2V/,' Rough Electrical Approved Final Electrical Right of Way Approved Approved By Date By Date By Date K 7 CITY OF Federal Way PERMIT APPLICATION ;0 PERMIT NUMBER � �0 CDs SUITE/UNIT # SITE ADDRESS 18zs 5w 34oi% S -i federal Way, WA 98023 PROJECT VALUATION ZONING ASSESSOR'S TAX/PARCEL # d c $ 250,000 RS 1 a -a 2- © TYPE OF PERMIT 0 BUILDING 0 PLUMBING 64 MECHANICAL D DEMOLITION D ENGINEERING D FIRE PREVENTION NAME OF PROJECT Lakehaven Lot =* i New construction single family residence with attached car garage. PROJECT DESCRIPTION Detailed description of work to be included on this permit only - NAME PRIMARY PHONE PROPERTY OWNER JK Monarch (253)840-5660 MAILING ADDRESS E-MAIL permits@jkmonarch.com PO Box 188 CITY STATE ' ZIP Puyallup WA 98371 NAME JK Monarch PHONE (253)306-4383 MAILING ADDRESS E-MAIL roy@jkmonarch.com y@jkmonarch.com PO Box 188 CITY STATE ZIP FAX PuyallupWA 98371 WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # 20 -15 -103162 -00 -BL JKMONML874NA nQ/ 01 /45 NAME PRIMARY PHONE JK Monarch (253)840-5660 APPLICANT MAILING ADDRESS PO Box 188 E-MAIL ermits 'kmonarch.com CITY STATE "983718371 FAX Puyallup q NAME PRIMARY PHONE Filipp Kapustin (253)840-5660 PROJECT CONTACT MAILING ADDRESS PO Box 188 EMAIL @j permits kmonarch.co (The individual to receive and respond to all correspondence concerning this application) CITY STATE ZIP 98371 FAX Puyallup WA NAME OWNER -FINANCED PROJECT FINANCING Columbia Bank Required value of $5, 000 or more MAILING ADDRESS, CITY, STATE, ZIP PHONE (253) 761-8170 (RCW 19.27.095) 5727 N 21 st St Tacoma, WA I certify under penalty of perjury that I am the property owner or authorized agent of the property owner. I certify that to the best in this application is true and correct. I certify that I will comply with of my knowledge, the information submitted support of permit all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental Iaws. I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and pled against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city as a part of this application. Q / DATE V'! / 22'lL SIGNATURE: PRINT NAME: Filipp Kapustin Bulletin #100 —January 1, 2013 Page 1 of 3 k:\HandoutsTermit Application MECHANICAL PERMIT Indicate how many of each type AIR HANDLING UNITS AIR CONDITIONER BOILERS COMPRESSORS DUCTING V 0 VALUE OF MECHANICAL WORK $ 8,000 fixture to be installed or relocated as part of this project Do not include existing fixtures to remain. 7_ FANS �_ GAS PIPE OUTLETS OTHER (Describe) 1 FIREPLACE INSERTS HOODS (Commercial) FURNACES HOT WATER TANKS (cas) GAS LOG SETS REFRIGERATION SYST GAS PIPING WOODSTOVES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR VALUE OF PLUMBING WORK PLUMBING PERMIT 1 $ 8,100 Indicate how many of each type of fixture to be installed or relocated as art o this ro'ect. Do not include existin ixtures to remain, `' _ BATHTUBS (orT b/shotrercombo) R LAVS (Hand Sinks) _ TOILETS WATER PIPING I DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS 2_ SHOWERS VACUUM BREAKERS DRINKING FOUNTAINS 1_ SINKS (Kitchen/Untity) WATER HEATERS (Electric) 2 HOSE BIBBS SUMPS 1 WASHING MACHINES _j]L TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS Lakehaven Utility District Lakehaven Utility District EXISTING/PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ❑ Yes,0 No ❑ Yes 4 No COMMERCIAL — NEW/ADDITION Area of AREA DESCRConstruction # IPTION in Square Feet Occupancy Groups) T e Stories Additional Information NEW BUILDING PROJECT AREA ONLY Bulletin #100 —January 1, 2013 Page 2 of 3 kMandoutsTermit Application SEGA Engineers ., Structural & Civil Consulting Engineers February 1, 2017 To: Building Official City of Federal Way From: Greg Thesenvitz, PE/SE Principal Re: JK Monarch Plan No. L2B-2600 Lake Haven Estates, Lot 1 SEGA Engineers has provided structural engineering including a lateral loads analysis, shear wall design, and framing calculations for the subject project. We have been asked to review an as -built condition at the main floor where the bearing studs between the 64 windows at the Great Room is a single 3x6 with rather than the specified (3) 2x studs. This is acceptable when the 4x header over the two adjacent windows is continuous. Please address any questions to SEGA Engineers. Cc: File 10-041 22939 SE 292nd Place • Black Diamond, Washington 98010 • (360) 886-1017 -eLO'E GRAVEL WIALE A MWW OF R TO DRAM 10OR GIMATER TO VEGETATED F�CttiGN O' 4E LOT. WAN ON BITE POSITIVE DRAfNAfaE SILT FENGE 12ETAfL NTS SITE DRAINAGE - ROOF -TIGHT LINE TO STORM STUB DRIVEWAY -ROUTE TO ROAD SILT PENCE DETAIL NTS R.99' Pt41 - 8sw4aFFoAR �B � IAi. ,S�? 4• tO 6` OLY.121" 8PALL8 FOR f�blgtlttlN. BPYtE FAMILY LOTS t2• �o e• aurRr SPALLS MAY eE AOCE7'tED AT NSF£CiOYB pISCRcTKxO CONSTRUCTION ENTRANCE NTS 6W 340TH STREET PERMIT #: 16 -104123,00 -SF ADDRESS: 1825 S�^J 340fh Sf PROJECT: New Single Family LAKE HAVEN ESTATES LOT 1 DATE: 8122116 LEGEND: SILT FENCING AS REQUIRED z CONSTRUCTION ENTRANCE STOCKPILED SOIL � x v v t AUG 2 2 2016 CM OF FEDERAL WAY CSS LAKEHAVEN E5TATE5 LOT 1 COVERAGE CALC. LOT AREA- - - 1;286 £F PROPOSED SIRXTURE(FOOTPRINT). .2,113 OF DRIVE/WALKWAY. 180 SF LOT COVERAGE IMPERIOUS• - CONTACT INFO. ,AC MONARCH 263-840-6660 SCALE 1:20 PLAN L28 -2600-3L