17-100893Building - Single Family
City
mtyDFederal elopmetWay
Permit #:17 -100893 -00 -SF
Community Development Dept.
33325 8th Ave S
Federal Way, WA 98003 Inspection Request Line: (253) 835-3050
Ph: (253) 835-2607 Fax: (253) 835-2609
Project Name: EAGLE MANOR LOT 2
Project Address: 2130 SW 344TH CT Parcel Number: 214121 0020
Project Description: NEW - Construction of a 2,668 square foot 2 -story single family residence with an 89 square
foot covered entry and a 564 square foot attached garage. Includes plumbing & mechanical.
***5 Bedrooms; $400,000 Estimated Selling Price***
Census Category: 101- New Single Family House
Includes: #1 #2 #3 #4
Occupancy Class: R-3
Construction T Type V - B
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
New / Additional Sq. Feet - 1st Floor .....................
Owner
Applicant
Contractor
Lender
0
Basic Plan?...........................................................
SSHI LLC, DBA D R HORTON
CAMBRIA SMITHSSHI LLC, dba D
D R HORTON
OWNER IS LENDER
564
Mechanical to be Included? .....................................
910 TOTEM LAKE BLVD SUITE 2
R HORTON
10 NE TOTEM LAKE BLVD SUITE
10000 Number of Stories...................................................
2
New / Additional Sq. Feet - Other ...........................
KIRKLAND WA 98034
:910 TOTEM LAKE BLVD SUITE 2
KIRKLAND WA 98034
3321 Will Certificate of Occupancy be Issued?...............
Yes
Occupancy #I - Use ................................................
Residence (1 or 2 Comprehensive PlamDesignation...........................
KIRKLAND WA 98034
family)Residential
Census Category: 101- New Single Family House
Includes: #1 #2 #3 #4
Occupancy Class: R-3
Construction T Type V - B
Occupancy Load:
Floor Area (sq. ft.)
Additional Permit Information
New / Additional Sq. Feet - 1st Floor .....................
1128 New / Additional Sq. Feet - 2nd Floor....................
1540
New / Additional Sq. Feet - 3rd Floor .....................
0 New / Additional Sq. Feet - Basement....................
0
Basic Plan?...........................................................
No Occupancy #I - Construction T
Type V - B
New / Additional Sq. Feet - Deck ...........................
. 0 New / Additional Sq. Feet - Garage........................
564
Mechanical to be Included? .....................................
Yes Plumbing Work Valuation?.....................................
10000
Mechanical Work Valuation? ..................................
10000 Number of Stories...................................................
2
New / Additional Sq. Feet - Other ...........................
89 Plumbing to be Included? ........................................
Yes
New / Additional Sq. Feet - Total ...........................
3321 Will Certificate of Occupancy be Issued?...............
Yes
Occupancy #I - Use ................................................
Residence (1 or 2 Comprehensive PlamDesignation...........................
SF - High -Density
family)Residential
Zoning Designation .................................................
RS 7.2c
Total Valuation: 327,452.57
t ALED
)-%I _ �"1 _ /t
A
Fans
5 Fireplace Inserts
1 Furnaces
1
Gas Piping
1 Gas Pipe Outlets
6 Hot Water Tanks
1
!htub!s���2!Fishw�ashers���
�JLauRdry asher Outlets
1
Lavatories
6 Showers
2 Sinks
2
Water Closets
4 Hose Bibbs
2
CONDITIONS:
1) One tree shall be planted on the lot prior to final inspection. Either a minimum ten foot evergreen or a
minimum three inch caliper deciduous tree.
PERMIT EXPIRES Tuesday, 12 September, 2017
Permit Issued on Thursday, March 16, 2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date: S'% (0
City of Federal Way
Certificate of Occupancy
This Certificate issued pursuant to the requirements of Section 111 of the International Building Code or Section
R110 of the International Residential Code is certifying that at the time of issuance, this structure was in
compliance with the various ordinances of the City regulating building construction or use. This certificate is valid
ONLY when endorsed by City staff.
Tenant Name: EAGLE MANOR LOT 2
Address: 2130 SW 344TH CT
Includes: #1 #2 #3
Occupancy Class: R-3
Construction Type: Type V - B
Occupancy Load:
Floor Area (sq. ft.)
Owner Name: SSHI LLC, DBA D R HORTON
Owner Address: 12910 TOTEM LAKE BLVD SUITE 22
KIRKLAND WA 98034
Building Official
Permit # 17 -100893 -00 -SF
#4
.� I Ivi 6-1
Date
The priority focus in the review and inspection made by the City prior to issuance of this Certificate was on those matters which
experience has shown most severely affect the health and safety of the general public. Although the City has made as complete
a review and inspection as is reasonably possible (within budgetary time and personnel limitations), the City neither guarantees
nor warrants to the owner/occupant or to any other person that this Certificate evidences strict compliance with each and every
ordinance or regulation of the City or the State of Washington affecting the construction or use of said structure or the land upon
which it is situated. Such compliance is the responsibility of the owner and /or occupant of the premises.
r.
44A
Federal Way
THIS CARD IS TO REMAIN ON-SITE
Construction Inspection Record
INSPECTION REQUESTS: (253) 835-3050
PERMIT #: 17 100893 00 Address: 2130 SW 344TH CT
Project: SSHI LLC, dba D R HORTON FEDERAL WAY WA 98023
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0
SWM Precon Site Mtg (4400)
® Plumbing Groundwork (4190)
Initial Erosion Control (4365)
Approved to backfill
Footings/Setback (4110)
By A0 Datej�
Approved
By Date n
To be done PRIOR to breaking ground
Approved to place concrete
By
Date
By
Date
By
N Date J4/&J,-1
® Foundation Wail (4115)
® Drainage/Downspout (4040)
® Plumbing Groundwork (4190)
Approved to place concrete
Approved to backfill
Approved to cover pj4fte_
By A0 Datej�
By i� Date qJ 11 )',
By Date n
0
Slab/Concrete Floor (4255)
®
Underfloor Framing (4285)
®
Floor Sheathing (4105)
By &,ij Date 5110117
Approved to place concrete
By to, t_� Date 5'
Approved to sheath floor
Approved to install flooring
By
Date
By
K* Date 1+ 20 (
By
tA,.s. Date V5 -t -1
to Shear Walls (4245)
El Roof Sheathing (4220)
Rough Plumbing (4230)
Approved to install siding
Approved to install roofmg
Approved
By &,ij Date 5110117
By Date
By to, t_� Date 5'
13
Mechanical Rough -in (4165)
®
Gas Piping (4125)
Q
Fire/Draft Stops (4095)
By M Date 611,3
Approved
By Date
Approved to release test
Approved
By
�,� Date v5_ t
By e,
Date
By tALA
Date
16 Interim Erosion Control (4370) Prior to scheduling a Framing inspection; 1T Framing (4120)
Approved Electrical, Plumbing & Mechanical Rough -in Approved to insulate
and Fire/Draft Stop inspections must be signed -
By Date off and approved. IBC 109.3.4 By � 1�, Date5=14-0,
18 Insulation (4150)
® Gypsum Wallboard Nailing (4130)
Final Erosion Control (4375)
Approved to install wallboard
Approved to install mud & tape
Approved
By M Date 611,3
By Date S.. J—lq
By Date
21
Final - Mechanical (4065)
®
Final - Plumbing (4075)
Final Electrical
Final - Building (4050)
El
Approved
Approved
Approved
By
Date rl _ i_ -
By 0
tkW Date _-;l 1- I
By
Date -7 ,1T1
t"
Rough Electrical
Final Electrical
El
Right of Way
Approved
Approved
Approved
By
Date
By
Date
By
Date
'�� •
FEB 2 4 2017 PERMIT APPLICATION
CITY OF
Federal W 11% OF FEDERAL WAY PERMIT CENTER + 33325 8th Avenue South +Federal Way, WA 48003-6325
.7 253-835-2697 + FAX 253-835-2609 + permitcenter(dcitvoffederalway.com
PERMIT NUMBER TARGET DATE
SITE ADDRESS
SUITE/UNIT M
2130 SW 344TH COURT, Federal Way, 98023
LOT # 2
PROJECT VALUATION
ZONING
ASSESSOR'S TAX/PARCEL M (Not recorded yet)
$ 100,000.00
A 1 -L -2., -]-- --0 0 � o
TYPE OF PERMIT
X BUILDING X PLUMBING XMECHANICAL ❑ DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION
NAME OF PROJECT
Eagle Manor
PROJECT DESCRIPTION
Detailed description of work to
Construct a New SFR w/ attached 3 car garage at Eagle Manor, LOT # 2
be included on this permit only
NAME
PRIMARY PHONE
SSHI LLC, dba D.R. Horton
(425) 821-340OX 5172
PROPERTY OWNER
MAILING ADDRESS
E-MAIL
i
12910 Totem Lake Blvd #220
csmith drhorton.com
e ON�
CITY Kirkland
Wq
— 98034
NAME SSHI LLC, dba D.R. Horton
PHONE
25) 821-340OX 5172
12910 Totem Lake Blvd #220
E-MAIL
cS ith drhorton.com
CONTRACTOR
CITY
Kirkland
STATE
WA
ZIP
98034
FAX
pt 1 6
WA STATE CONTRACTOR'S LICENSE S
EXPIRATION DATE
FEDERAL WAY BUSINESS LICENSE N
,0116
t
**9Q3Q,9
08// 03 / 17
NAME
SSHI LLC, dba D.R. Horton
PRIMARY PHONE
425 821-340OX 5172
12910 Totem Lake Blvd #220,
csmith@drhorton.com
APPLICANT
CITY Kirkland
STATE
ZIP 98034WA
FAx
PROJECT CONTACT
NAME
Cambria Smith
PRIMARYPHONE
(425 821 340OX 5172
MAILING ADDRESS
12910 Totem Lake Blvd #220
E-MAIL
csmith@drhorton.com
(The individual to receive and
respond to all correspondence
CITY Kirkland STWq ZIP 98034
FAX
concerning this application)
PROJECT FINANCING
NAME Cambria Smith
9 OWNER -FINANCED
When value is $5,000 or more
MAILING ADDRESS, CITY, STATE, ZIP
PHONE
(RCW19.2ZO95)
12910 Totem Lake Blvd #220 Kirkland WA 980
425 821-340OX 5172
I certify under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best
of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with
all applicable City of Federal Way regulations pertaining to the work authorised by the issuance of a permit. I understand that the
issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating
construction or environmental laws.
I further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in
the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city,
but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the
information supplied to the city as as part this application.
r/of
��
—�-'-' DATE 2-13-17
SIGNATURE:
PRINT NAME: Cambria Smith
Bulletin #100 – January 29, 2016 Pagel of 2 k:\landouts\Permit Application
MECHANICAL PERMIT
Indicate how many of each typ
AIR HANDLING UNITS
1 AIR CONDITIONER
BOILERS
COMPRESSORS
1 DUCTING
Ffixture to be installed or rel
5 FANS
1 FIREPLACE INSERTS
_I FURNACES
GAS LOG SETS
1 GAS PIPING
6 GAS PIPE OUTLETS
1 HOODS (commercial)
I HOT WATER TANKS (caa)
1 REFRIGERATION SYST
WOODSTOVES
VALUE OF MECHANICAL WORK
10,000
lude existing fixtures to remain.
OTHER (Describe)
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
SEWER PURVEYOR
VALUE OF EXISTDIG IMPROVEMENTS
N/A
Lakehaven Utility District
VALUE OF PLUMBING WORK
PLUMBING PERMIT
EXISTING/PREVIOUS USE
LOT SIZE )In Square Feet)
EXISTING FIRE SPRINKLER SYSTEM?
PROPOSED FIRE SUPPRESSION SYSTEM?
$ 10,000
Indicate how many of each type offixture
to be installed or relocated as part of thisproject. Do not include existing fixtures to remain.
_ BATHTUBS (or Tub/Shower Comity(
LAVS (Hand Sinks)
t/ �� TOILETS
1 WATER PIPING
1 DISHWASHERS
RAINWATER SYSTEMS
URINALS
OTHER (Describe)
DRAINS
SHOWERS
VACUUM BREAKERS
DRINKING FOUNTAINS
2 SINKS (Kitchan/utility
WATER HEATERS (Electric)
HOSE BIBBS
SUMPS
�_ WASHING MACHINES
26 TOTAL FIXTURES
GENERAL INFORMATION
CRITICAL AREAS ON PROPERTY?
WATER PURVEYOR
SEWER PURVEYOR
VALUE OF EXISTDIG IMPROVEMENTS
N/A
Lakehaven Utility District
Lakehaven Utility District
$ N/A
EXISTING/PREVIOUS USE
LOT SIZE )In Square Feet)
EXISTING FIRE SPRINKLER SYSTEM?
PROPOSED FIRE SUPPRESSION SYSTEM?
❑ Yes XNo
❑ Yes X No
N/A
7,243
Bulletin #100 — January 29, 2016 Page 2 of 2 k:\Handouts\Permit Application
N �
O c�
t
O m Cy
'Q J/U�iNN J1N�
Q QQ µV}s J d
�4 w W
° z w D- d
W Z �— w p( N
W 1L 1L 1 w } W W w{{ ni > a—
W O [w J Q "�M �y
« s a ktl Ik p lZ Q { ! Z
Z 4 l w „o-,tis „s=zz O 6,S,), c{l
,. 0 — u� p w
UA O ' ° x„00 b0°ODS fl C
s�san��iffl t— cv W �'
ww „zr Ul
_
v----------- —------- — — — -�
Lij
o wo I I <Q�� R� n I �z LU
0. wQ I
t ° N E_ { I r ( � < NO -A
_ uikn( i I<0� r o n c,=asz=
y �[�N v z , i s Qlu
� W n
r
o;
-------------------
L
=Q z p W 121.03'
v
iG� FUA
m r Q wo
s - _ j
m
1 Ui( °q a vk,
Nrw „ei f tLlu
Qo°ry<�gti`
FEB Z",4 2047
W�
r