16-100119City of Federal Way Community & Econ. Dev. Services 33325 8th Ave S Federal Way, WA 98003 Ph: (253) 835-2607 Fax: (253) 835-2609 Project Name: CABODI Project Address: 512 SW 293RD ST Project Description: Demolition of single family residence and garage. Demolition Permit #: 16 -100119 -00 -DE Inspection Request Line: (253) 835-3050 Parcel Number: 119600 0535 Owner Applicant Contractor ALAN J CABODI ALAN J CABODI EDGE CONSTRUCTION LLC 16811 78TH ST E 16811 78TH ST E EDGECCL92IBM (2/26/16) SUMNER WA 98390 SUMNER WA 98390 PO BOX 2054 TACOMA WA 98401 Additional Permit Information Demolition Valuation.............................................7000 CONDITIONS: Erosion and Sediment Control Measures shall be installed and maintained in accordance with the King County Surface Water Manual, Appendix C or D, dependent on site size. The City may inspect and require additional controls dependent on erosion or risk of erosion. Upon completion of operations, all disturbed areas shall be stabilized in accordance with the King County Surface Water Manual, Appendix C or D, dependent on site size. This can be accomplished by spreading seed at manufacturer's recommended rate and straw at a rate of 2" - 3" thick or alternate method listed in the manual. PERMIT EXPIRES Friday, January 12, 2018 Permit Issued on Wednesday, January 13, 2016 1 hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordan ith the laws, rules and regulations of the State of Washington a ity ederal Way. Owner or agent: Date: THIS CARD IS TO REMAIN ON-SITE Construction Inspection on RecordFeceral Way INSPECTION REQUESTS: (253) 835-3050 PERMIT #: 16 -100119 -00 -DE Address: 512 SW 293RD ST Project: ALAN J CABODI FEDERAL WAY, WA 98023-3537 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read lett to right, top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-2oinQ inspections are logged on the hark of this rami Final Erosion Control (4375) Final - Building (4050) Approved Approved By Date By e Datcj 2" ❑ SWM Precon Site Mtg (4400) Initial Erosion Control (4365) Final Electrical Interim Erosion Control (4370) Approved Right of Way—� To be done prior to breaking ground rBy Approved By Date By Date Approved Date Final Erosion Control (4375) Final - Building (4050) Approved Approved By Date By e Datcj 2" ❑ Rough Electrical Approved Final Electrical Right of Way—� Approved Approved By Date By Date By Date RECEIVED �iY OF � '. ►- JAN 13 2016 PERMIT APPLICATION Federal Way CITY OF FEDERAL WAY CDS _ f�//'� PERMIT NUMBER _ C �� _D L _ TARGET DATE arm ADDRESSSUITElUNIT # e l ; ���-�� L x.44 IV A 7,00.2-5 SW - -5112- ,24 , PROJECT VALUATION ZONING ASSESSOR'S TAR/PARCEL # TYPE OF PERMIT ❑ BUILDING ❑ PLUMBING ❑ MECHANICAL 9 DEMOLITION ❑ ENGINEERING ❑ FIRE PREVENTION � NAME OF PROJECT �^ PROJECT DESCRIPTION Detailed description of work to be included on this permit only NAME PRIMARY PHONE sIJ a ) 14 gte&e PROPERTY OWNER MAEUNG ADDRESS ri11C E MAH - ..�A)TEd �� #'(� •' C ZIP �y � (� NAME�C .2 � G/ I ii f PHONE __;Z9 I MAILING RESS MAH, j 't'�f� .r5 CONTRACTOR CITY STAT/EE ZIP F P , WA STATE CONTRACTOR'S LICENSE # EXPIRATION DATE FEDERAL WAY BUSINESS LICENSE # r acs L. q2 1 9W NAME PRIMARY PHONE y 3._. MAILING ADDRESS E-MAIL APPLICANT CITY ,O(Af &-4 STATE d°1-!� ZIP 9 �v FAX NAME % PRIMARY PHONE �j Cl —'7.13 3 . PROJECT CONTACT ;2_5-s .13 MAILING ADDRESS E-MAIL (The individual to receive and respond to all correspondence r CITY STATE ZIP PAX concerning this application) PROJECT FINANCING NAME OWNER -FINANCED _ When value is $5,000 or more MAH,ING ADDRESS, CITY, STATE, ZIP PHONE (RCW 19.27.095) 1 certify under penalty of perjury that I am the property owner or authorised agent of the property owner. I certify that to the best of my knowledge, the information submitted in support of this permit application is true and correct. I certify that I will comply with all applicable City of Federal Way regulations pertaining to the work authorized by the issuance of a permit. I understand that the issuance of this permit does not remove the owner's responsibility for compliance with local, state, or federal laws regulating construction or environmental laws. 1 further agree to hold harmless the City of Federal Way as to any claim (including costs, expenses, and attorneys' fees incurred in the investigation and defense of such claim), which may be made by any person, including the undersigned, and filed against the city, but only where such claim arises out of the reliance of the city, including its officers and employees, upon the accuracy of the information supplied to the city art o this a i do SIGNATURE: DATE ® AW16 p PRINT NAME: Bulletin #100 —December 29, 2015 Page 1 of 3 kAHandouts\Permit Application M0 �ftlji 'CrV' C—, MECHANICAL PERMIT A)A VALUE OF MECHANICAL WORK Indicate how many of each e offixture to be installed or relocated as part of this project. Do not include existingfixtures to remain. AIR HANDLING UNITS FANS GAS PIPE OUTLETS OTHER (Describe) AIR CONDITIONER FIREPLACE INSERTS HOODS (commercial) BOILERS FURNACES HOT WATER TANKS (Gas) COMPRESSORS GAS LOG SETS REFRIGERATION SYST DUCTING GAS PIPING WOODSTOVES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR VALUE OF PLUMBING WORK PLUMBING PERMIT 'o1,4 Additional Information ZA ke 4,/ e. -I $ _ EXISTING/PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? Indicate how many of each type offtxture to be installed or relocated as part of this project, Do not include existingftxtures to remain. BATHTUBS (or Tib/shower Combo) LAVS (Hand Sinks) TOILETS WATER PIPING DISHWASHERS RAINWATER SYSTEMS URINALS OTHER (Describe) DRAINS SHOWERS VACUUM BREAKERS TOTAL BUILDING DRINKING FOUNTAINS SINKS (Kitchen/Utility) WATER HEATERS (Electric) HOSE BIBBS SUMPS WASHING MACHINES TOTAL FIXTURES GENERAL INFORMATION CRITICAL AREAS ON PROPERTY? WATER PURVEYOR SEWER PURVEYOR VALUE OF EXISTING IMPROVEMENTS of # ries Stories Additional Information ZA ke 4,/ e. -I $ _ EXISTING/PREVIOUS USE LOT SIZE (In Square Feet) EXISTING FIRE SPRINKLER SYSTEM? PROPOSED FIRE SUPPRESSION SYSTEM? ADDITION ❑ Yes id No ❑ Yes ❑<No COMMERCIAL — REMODEL/TENANT IMPROVEMENTS 2 AREA DESCRIPTION RESIDENTIAL -NEW OR ADDITION 1L.111 1X AREA DESCRIPTION (in square feet) EXISTING PROPOSED TOTAL FOR OFFICE USE BASEMENT FIRST FLOOR (or Mobile Home) SECOND FLOOR COVERED ENTRY DECK GARAGE ❑ CARPORT ❑ OTHER (describe) .... _............. ........ ___._......... ....... -_.._.._.__............. _............. _............ - -.... Mama PROPOS® TOTAL Area Totals "NEW HO1IIE.S ONLY" ESTIMATED SELLING PRICE $ 1 # OF BEDROOMS COMMERCIAL — NEW/ADDITION A A AREA DESCRIPTION ` are rea Feet in Square Occupancy Group(s) Construction a of # ries Stories Additional Information NEW BUILDING ADDITION COMMERCIAL — REMODEL/TENANT IMPROVEMENTS 2 AREA DESCRIPTION Area in Square Feet Occupancy Group(s) Construction # of Stories Additional Information TOTAL BUILDING TENANT AREA ONLY PROJECT AREA ONLY Bulletin #100 - January 1, 2013 Page 2 of 3 k:\Handouts\Permit Application 41k CITY OF . .. • • RsckIV JqN 1 FO Cly OF FF ?016 P,S R De Ck wAY COMMUNITY DEVELOPMENT DEPARTMENT 33325 Bch Avenue South Federal Way, WA 98003-6325 253-835-2607; Fax 253-835-2609 www.cityoffederalway.com A demolition permit is required to remove any structure on a subject property. Demolition of separate structures may require separate permits. ElAddress of Demolition: -5-14 _�56t.r 2'l3 '5;7— r�&­,, IW4 ze© �2---3 ❑ Prior to submitting a demolition permit, the following items must be signed by the respective agency or their approvals attached. Items not applicable to your project should be marked N/A. ❑ A completed Construction Permit Application form is also required. 1. ASBESTOS ABATEMENT (Provide copy of Notice oflntentfrom Puget Sound Clean Air Agency S. ELECTRICITY and copy (? in pection report by AHERA-certified inspector) _SFE ATTAC�C-b (City of Federal Way B (ding Official) (Puget Sound Energy) 2. FUEL STORAGE TANKS ❑ Under grade tank(s) is/are present ❑ Above grade tank(s) are present ❑ Tank(s) has been pumped or removed under South King Fire & Rescue permit prior to any dismantling or excavation •A (South King Fire and Rescue) 3. SEPTIC SYSTEM a (King County Environmental Services) 4. SANITARY SEWER ,/ 5 i✓ �r A 7 -TAC f�C l� (Lakehaven Utility District) 6. GAS SUPPLY (Puget Sound Energy) 7. WATER - Public Source Td C H 6a (Water Supplier) 8. WATER - Private Well A (King County Environmental Services) Bulletin # 122 —May 13, 2015 Page 1 of 1 k:\Handouts\Demolition Permit Requirements 1/12/2016 Approved Transaction RECEIVED pscIeanair.org JAN 132016 PugetSound Agency Single -Family Notification Case #: 201600114 CITY OF FEDERAL WAy 9 Y CDs This page must be printed. A printout of the notification, all amendments to the notification, and the asbestos survey shall be available for inspection at all times at the asbestos project or demolition site (Reg III, 4.03(a)(6)). Fee Amount Paid $65.00 Credit Card Transaction # APOFCCBD8DC7 Transaction Date 01/12/16 Owner's Name Alan Cabodi & Pamela Butterfield Phone (253) 279-7837 Project Street Address 512 SW 293rd st City Federal Way Zip 98023 Contact Person Alan Cabodi Phone (253) 279-7837 Mailing Address 16811 78th St E Sumner, WA 98390 This project includes a demolition. Demolition Start Date 02/22/16 Completion Date 02/25/16 Demolition will be completed by a demolition contractor I certify that: (1) This is a single-family residence project. The structure is used by one family who owns the property as their domicile. (2) The information I have provided is to the best of my knowledge accurate and complete. (3) I understand the fee for this Notification is nonrefundable. Create Another Notification View History If you have questions, contact us at asbestos@pscleanair.org or 206.689.4058. Loa Out https://secure.pscleanair.org/Asbestos/Approved.aspx 1/1 INSPECTION REPORT PROJECT #: 15315 PROJECT: 512 SW 293RD ST. FEDERAL WAY, WA 98023 PREPARED FOR: ALAN CABODI 1681178TH ST. E. SUMNER, WA 98390 DATE OF GOOD FAITH ASBESTOS SURVEY: 11/16/15 RECEIVED JAN 13 2016 CITY OF FEDERAL WAY CDs This report provides the summarized results of the asbestos inspection performed by Brandon Larrieu (AHERA Certified Inspector #153189) of F.S. & GS. Services, Inc. on November 16, 2015 at the above referenced site. The inspection was performed to identify potential asbestos containing building materials (ACBM) that may be present in the residence/structure. 7n un �20 G) 0) NJ ul (D CU Ln 00 to LM BUILDING DESCRIPTION(S): Type of Survey Good Faith Asbestos Survey on house and detached garage # of Structures 2 General Building Type Vacant home for demolition Exterior Finishes Wood shake siding & 3 -tab shingle Floor Finishes Hardwood, tile, sheet vinyl, & carpet Wail & Ceiling Finishes Drywall and plaster Heat Source In wall heaters Insulation Type Rolled insulation Exclusions N/A Address: 512 SW 293rd St. There were a total of 9 suspect building materials (bulk samples) removed from one structure during this survey. Based on the lab analysis, 0 of the 9 samples tested positive above 1 % for asbestos. No suspect building materials were found in the garage. Asbestos Containing Materials: None of the sample taken tested positive for asbestos. ASBESTOS SUMMARY The AHERA regulation, 40 Code of Federal Regulations (CFR) 763, is the primary governing regulation when performing asbestos surveys. This regulation was originally enacted for school buildings, but has since been applied to public and commercial buildings. AHERA Protocol determines the number of samples of each material to be collected, depending on its category and amount of material present. The goal of AHERA is to ensure statistically reliable data and it accomplishes this by requiring or suggesting a minimum number of samples to be collected, and in some cases, by using random sampling techniques to determine sampling locations. However, in every case, AHERA relies on the judgment of the inspectors who are experienced in AHERA methodology and the type of facilities being inspected. Although extreme thoroughness and expertise were exercised to ensure the completeness of this survey, existing conditions may have prevented the discovery of other suspect asbestos containing material. F.S. & GS. Services, Inc. is not responsible for materials that are hidden from sight and cannot be discovered with reasonable diligence. Any suspect material not covered in this survey that is encountered during the renovation or demolition procedure should be verified by analysis prior to disturbance. AHERA regulations segregate suspect materials into three categories: ❖ Surfacing Materials: A sprayed or troweled on texture applied to wails, ceilings, wall cavities and structural members for acoustical, decorative or fireproofing purposes. AHERA requires collection of a minimum of 3 to 7 samples per homogenous material depending on the quantity of material. Thermal System Insulation: Insulation used to inhibit heat transfer or prevent condensation on pipes, boilers, tanks, ducting, furnaces and other components of hot and cold water systems and heating, ventilation, and air conditioning systems. AHERA requires collection of at least 3 samples of each homogenous material. ❖ Miscellaneous Materials: Other, largely non -friable products and materials such as floor coverings, ceiling tile, roofing, outdoor siding, concrete pipe, silver coatings and many others building materials. AHERA requires the collection of at least one sample per homogenous material. After identifying the suspect materials, bulk samples were collected and taken to an independent accredited laboratory to be analyzed for the amount and type of asbestos, if any. The bulk samples were analyzed using Polarized Light Microscopy (PLM) stain dispersion staining techniques in accordance with the EPA Method 600/R-93/166, which has a reliable limit of quantification of one percent asbestos by volume. All suspect materials were analyzed by Schneider Laboratories, Inc. in accordance with 40 Code of Federal Register Chapter 1, Part 763, Sub part F. AIHA Bulk Asbestos Analytical Testing Program (101150-0). F.S. & GS. Services, Inc. is not responsible for variations in analytical results or inaccuracies resulting from laboratory analysis. It should be noted that this survey was conducted only to ascertain the presence of asbestos containing materials. There was no survey conducted by F.S. & GS. Services, Inc. to determine the presence of PCB material (ballast, etc.), UST's, radon gas or any other hazardous material that may be present onsite. A Puget Sound Clean Air Agency (PSCAA) notification is required to obtain a demolition permit. Prior to any demolition or renovation, all friable and non -friable asbestos containing materials (ACM) are to be removed and disposed of in accordance with applicable Federal, State and Local regulations. If there are any asbestos containing materials left on site that will not be disturbed during the renovation or demolition process, we recommend an Asbestos Operational and Maintenance Program (OM) be developed and implemented to monitor the remaining ACM. In the event any suspect materials are detected during the demolition of this structure, you will need to cease all demolition activities and have these materials sampled for asbestos. EPA AND LABOR & INDUSTRY EXTRACTS Current federal regulations (NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS, NESHAPS, CFR 40, PART; 61, SUBPART M [REVISED SUBPART B]) require that no renovation or demolition activity release asbestos fibers to the environment. Therefore, all affected asbestos containing materials must be removed by a certified asbestos contractor prior to remodel or demolition. WAC 296-62-07707, Identification, requires an owner to perform a good faith inspection to determine whether materials to be worked on or removed contain asbestos. LIMITATIONS In accordance with your request, F.S. & GS. Services, Inc. has conducted an A.H.E.R.A. type survey. F.S. & GS. warrants that the survey was performed with the usual thoroughness and competence of this profession, and within the limits of accessibility to materials. The survey was conducted within the guidance provided by 40 CFR Part 763, Subpart E, Appendix C. F.S. & GS. Services, Inc. is not responsible for materials, hidden from sight that cannot be found with reasonable diligence, such as materials in foundations or slab floors. We are providing this information for the express use of Alan Cabodi and we make no warranty of sufficiency of data to any other parties. This survey and demolition intent will need to be submitted to the Puget Sound Clean Air Agency prior to renovation or demolition activity. CHAIN OF CUSTODY F_s.��s_ F.S. & GS. SERVICES INC. S{QYtCF51hY ' 16214-57T" Ave. East Suite A TEL# 253-548-1011 PUYALLUP WA 98375 FAX# 253-536-8488 Asbestos Bulk Samples Chain of Custody Project # 15315 Client Name: Alan Cabodi Project Name: Billing Address: 16811 78th St. E. Sumner, WA 98390 Project Address: 512 SW 293rd St. Federal Way, WA 98023 Owner Name & Address: Pamela Butterfield 512 SW 293`d St. Federal Way, WA 98023 SAMPLE # FLOOR PHOTO# AREA TYPE OF MATERIAL BLO1 BSMT. 1 BATHROOM B CREAM SQUARE PATTERN SHEET VINYL BI -02 BSMT. 2 BATHROOM B JOINT COMPOUND AND SHEET ROCK BI -03 MAIN 3 STORAGE ROOM LIGHT GRAY SQUARE PATTERN SHEET VINYL BI -04 MAIN 4 STORAGE ROOM BROWN FLOORING LAYER 2 UNDER SHEET VINYL BL05 MAIN 5 KITCHEN YELLOW COVE BASE MASTIC BI -06 2`D 6 HALLWAY TAN SHEET VINYL W/ BROWN MASTIC BL07 2`D 7 HALLWAY JOINT COMPOUND AND DRYWALL BL08 2`D 8 EXTERIOR EXTERIOR WALL WRAP BI -09 2ND 9 BEDROOM B JOINT COMPOUND AND DRYWALL Date Samples Taken: 11116/2015 Sampled by: Brandon Larrieu Inspector Signature: Turn around Rush (2 hours) M Same LABORATORY RESULTS Attn: Project: 512 SW 293 St -Location: Federal Way, WA 98023 -Number: 15315-150912 Schneider Laboratories Global, Inc 2512 W. Cary Street • Richmond, Virginia - 23220-5117 804-353-6778 • 800 -785 -LABS (5227) - Fax 804-359-1475 Order #: 150912 Received 11/18/15 Analyzed 11/18/15 Reported 11/18/15 PO Number: 15315-150912 Method:- EPA 600/R-93/116 & 600/M4-82-020 - PLM Analysis Sample ID Collected Cutst ID Location Asbestos Fibers Other Materials 150912-001 11/16/15 BL01 Basement Bathroom B _...... ----------------- — -- -- -... --- - ....._ _ ------- ....... Layer 1: Sheet Vinyl None Detected 40% CELLULOSE FIBER Cream, Org.Bound/Fibrous 60% NON FIBROUS MATERIAL Sample was inhomogenous, subsamples of each component were analyzed separately. -- _ _ _ Basement ----._.... ----------- ---- _......._ . 150912-002 11116/15 BL02 Basement Bathroom B Layer 1: Sheetrock None Detected 15% CELLULOSE FIBER White, Powdery 85% NON FIBROUS MATERIAL Layer 2: Joint Compound White, Granular 150912-003 11!16115 BL03 Layer 1: Sheet Vinyl Light Gray, Org.Bound/Fibrous None Detected Main Floor Storage Room None Detected 100% NON FIBROUS MATERIAL 55% CELLULOSE FIBER, 5% MINERAL/GLASS WOOL 40% NON FIBROUS MATERIAL Sample was inhomogenous, subsamples of each component were analyzed separately. - -._ ...... --.... _............ _._..— --=---._...._._...._.__._..__....._._.._.__..........- ------ 150912-004 11/16/15 BL04 Main Floor Storage Room ---..... . ---- ------ - .... - — ----- Layer 1: Sheet Vinyl None Detected 35% CELLULOSE FIBER Brown/Black, Org.Bound/Fibrous 65% NON FIBROUS MATERIAL Sample was inhomogenous, subsamples of each component were analyzed separately. ....._.... 150912-005 11/16(15 BLOB Main Floor Kitchen Layer 1: Cove Base Mastic None Detected 100% NON FIBROUS MATERIAL Yellow, Soft Method reporting limit is 1%. PLM analysis is based on Visual Estimation and NESHAP recommends that any asbestos content less than 10 percent be verified by PLM Point Count or TEM Analysis. This report must not be reproduced except in full with the approval of the laboratory. The test results reported relate only to the samples submitted. Page 1 of 2 Method: EPA 600/R-931116 & 600/M4-82-020 _ PLM Analysis _ Sample ID Collected Cust. ID Location Asbestos Fibers Other Materials 150912-006 11/16/15 BL06 2nd Floor Hallway ____.. _ __--------.__.__-_ _ ._..... __..... ......... Layer 1: Sheet Vinyl None Detected 2% CELLULOSE FIBER Tan, Organically Bound 98% NON FIBROUS MATERIAL Layer 2: Mastic/Fibrous Mtrl Brown/Red, Brittle/Fibrous None Detected 10% CELLULOSE FIBER 90°% NON FIBROUS MATERIAL Unable to separate individual layers. 150912-007 11/16/15 BL07 2nd Floor Hallway ...................__ Layer 1: Sheetrock None Detected 20°% CELLULOSE FIBER White, Powdery 80°% NON FIBROUS MATERIAL Layer 2: Joint Compound None Detected 100% NON FIBROUS MATERIAL White, Granular 150912-008 11116/15 131-08 Layer 1: Wrap Black, Bituminous/Fibrous 150912-009 11116/15 BL09 2nd Floor Exterior 2nd Floor Bedroom B None Detected 55% CELLULOSE FIBER 45°% NON FIBROUS MATERIAL Layer 1: Drywall None Detected 10% CELLULOSE FIBER White, Powdery 90°% NON FIBROUS MATERIAL Layer 2: Joint Compound None Detected 100% NON FIBROUS MATERIAL White, Granular Analyst: Hashim, Reel Total layers analyzed on order: 13 150912-11/18/15 11:38 AM Reviewed By: Hind Eldanaf Microscopy Supervisor Method reporting limit is 1 °%. PLM analysis is based on Visual Estimation and NESHAP recommends that any asbestos content less than 10 percent be verified by PLM Point Count or TEM Analysis. This report must not be reproduced except in full with the approval of the laboratory. The test results reported relate only to the samples submitted. Page 2 of 2 PHOTOS PHOTO I PHOTO) 4 PHOTO 2 PHOTO - PHOTO 7 PHOTO 8 PHOTOS PHOTO 3 PHOTO 9 SAMPLE LOCATION PLAN Main Upstairs Closet Bedroom AL.,6 Bathroom B 7 SAMPLE LOCATION PLAN Not to Scale Basement Garage SAMPLE Oa • A Not to Scale 10/6/2015 Print Outlook.com Print Message Close ELECTRIC & GAS DISCONNECT FOR DEMO AT 512 SSV 293" ST, FEDERAL WAY From: Ball, Michelle (Michelle.Ball@pse.com) Sent: Tue 9/22/15 3:50 PM ACABODI@MSN.COM (ACABODI@MSN.COM) Good Afternoon Al, Thank you for contacting Puget Sound Energy today. After mentioning what you need for the demo permit to my lead, he said that Federal Way does request that -but, most other cities do not! I have been in this department for about a year and you are my first Federal Way customer that is requesting demo! So, the job notification for the electric is 502315770 and the notification number for the natural gas is 502315792. Please allow 10 business days for contact and if you haven't heard within this timeframe, please contact us at 1-888- 321-7779 and refer to the job notification number. Sincerely, Michelle Ball Customer Construction Representative TAC -CCS 1-888-321-7779, option 8, ext. 88-7120 https://col130.mail.live.com/ol/maii.mvc/PrintMessages?mkt=en-us 1/1 10/6/2015 Print Outlook.com Print Message 512 SW 293RD ST FEDERAL WAY From: Jackson, Alfred (Alfred.Jackson@pse.com) Sent: Mon 9/28/15 2:28 PM To: ACABODI@MSN.COM (ACABODI@MSN.COM) THIS IS A CONFIRMATION EMAIL Please call me or email when ready for service disconnect Alfred Jackson Associate Project Manager PUGET SOUND ENERGY D:253-395-6956 C: 425-505-3858 6905 S. 228th ST. Email: Alfred.Jackson@pse.com Close hUps:Hcol130.mai1.1ive.com/ol/mail.mvc/PrintMessages?mkt--en-us 1/1 '4!28/2015 Outlook.com Print Message 502315770 / 512 SW 293rd St Federal Wav r Lesinski, David T (david.lesinski@pse.com) Bele: Mon 9/28/15 11:27 AM u: acabodi@msn.com (acabodi@msn.com) Hi, Al. Please call me when you are ready to proceed. Thanks much. Dave Lesinski Senior Engineering Specialist PUGET SOUND ENERGY 253-395-6911 tel 253-905-4592 cell david.lesinski0pse.com www.pse.com https://col130.mail.live.comiol/mail.mvc/PrintMessages?mkt=en-us 111