Loading...
17-101331 t;• . "'n Electrical City of Federal Way Permit #:17-101331-00-EL Community Development Dept. FILE 3332558ththAveS Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: KOERPER Project Address: 32005 41ST AVE SW Parcel Number:873190 2210 Project Description: Electrical connection for gas to gas furnace Owner Applicant Contractor SANDRA KOERPER JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC 32005 41ST AVE SW 4601 S 134TH PL (ELECTRICAL 01) FEDERAL WAY WA SEATTLE WA 98168 BRENNHA962DU(3/31/18) 98023-2402 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Is this an Online or O.T.C.application9 Yes �� � �� moi` €€ f���I �✓���, .. 3b R i� Circuits-Residential 1 Thermostat 1 PERMIT EXPIRES Saturday,24 March,2018 Permit Issued on Friday,March 24,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINE Date: FINALED THIS'CARD IS TO REMAIN ON-SITE r Federal Wa Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 101331 00 Address: 32005 41ST AVE SW Project: SANDRA L KOERPER FEDERAL WAY WA 98023-2402 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. • El UFER Ground(4295) 4.#El 4030 Ditch cover k• 3 ( ) Slab/Concrete Floor(4255) Approved Approved Approved to place concrete .By Date 4By Date •�By Date •• • ® Pool Bonding(4195) 1*El Temporary Power(4275) �'® Service(4235) Approved Approved Approved By Date ,�By Date By Date ❑ Feeders/Sub-panels(4045) `,® Rough Electrical(4225) ,• 9 , g ❑ Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date El Final-Electrical(4055) Approved B Date /f- A ❑ Rough Electrical ❑ Final ElectricalRi ht of Way Approved Approved ❑ Right By Date By Date By Date