17-102147 .i: 11.
V Electrical
City of Federal Way Permit #:17-102147-00-EL
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax (253)835-2609 FILE
Project Name: TRANTHAM
Project Address: 29419 4TH AVE S Parcel Number: 186270 0140
Project Description: Install 60-Amp sub-panel& adding(1)circuit for heat pump.
Owner Applicant Contractor
J GARY TRANTHAM BRAD CROCCOELITE ELECTRIC INC ELITE ELECTRIC INC(01)
29419 4TH AVE S 2207 N INTER AVE SUITED ELITEEI055OF(9/6/17)
FEDERAL WAY WA 98003-3666 PUYALLUP WA 98372 2207 INTER AVE UNIT D
PUYALLUP WA 98372
•
Additional Permit Information
Is this an Online or O.T.C.application? Yes
r ai, „r €i,Hcox vi,...✓2s ., ;. ,,, / ✓ �,mi ., Ef' ''�` •
..,
Alt.Serv./Feeder:0 to 200 am] 1 Circuits-Residential 1
PERMIT EXPIRES Friday, 11 May,2018
Permit Issued on Thursday,May 11,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
THIS CARD IS TO REMAIN ON-SITE .
� Construction Inspection Record
Federal Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 102147 00 Address: 29419 4TH AVE S
Project: PATRICIA I TRANTHAM FEDERAL WAY WA 98003-3666
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
• '• •
0 UFER Ground(4295) ❑ Ditch cover(4030) •al Slab/Concrete Floor(4255) '
Approved Approved Approved to place concrete
By Date By Date By Date
Pool Bonding(4195) ® Temporary Power(4275) El Service(4235)
Approved Approved Approved
By Date By Date By Date
• „
Feeders/Sub-panels(4045) El Rough Electrical(4225) ® Ceiling Cover(4020)
Approved Approved Approved
By Date By Date By Date
El Final-Electrical(4055)
Approved
By 0404 Date S114(l 1
0 Rough Electrical 0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date