Loading...
17-101829 Electrical City of Federal way Permit #:17-101829-00-EL Commwuty Development Dept. 33325 8th Ave S Federal Way,WA 98003 FILE Inspection Request Line: (253)835-3050 Ph.(253)835-2607 Fax:(253)835-2609 Project Name: BASKETT Project Address: 30021 21ST AVE SW Parcel Number:012103 9076 Project Description: Electrical circuit for A/C install Owner Applicant Contractor RANDAL BASKETT ETHAN ONATWASHINGTON ENERGY WASHINGTON ENERGY SERVICES CO 29033 229TH AVE SE SERVICES CO (GENERAL 01) BLACK DIAMOND WA 98010 3909 196TH ST SW WASHIES851NS(9/7/17) USA LYNNWOOD WA 98036 3909 196TH ST SW LYNNWOOD WA 98036 Additional Permit Information Is this an Online or O.T.C.application? Yes Circuits-Residential 1 PERMIT EXPIRES Saturday,21 April,2018 Permit Issued on Friday,April 21,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with cjiNtaillE the laws, rules and regulations of the State of Federal Way. Owner or agent: Date: " r rit,Sa3 F I • t THIS CARD IS TO REMAIN ON-SITE "� Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 101829 00 Address: 30021 21ST AVE SW Project: RANDAL R BASKETT FEDERAL WAY WA 98023-2302 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. . '� UFER Ground(4295) 0 Ditch cover(4030) ,•El Slab/Concrete Floor(4255) \ El Approved Approved Approved to place concrete ,By Date •,By Date ..By Date ® Pool Bonding(4195) ® Temporary Power(4275) ® Service(4235) Approved Approved Approved By Date By Date By Date Q Feeders/Sub-panels(4045) El Rough Electrical(4225) El Ceiling Cover(4020) Approved Approved Approved By Date By Date By Date • El Final-Electrical(4055) Approved By Wig Date 43'I IS(I-, _......_ ., _ _ .... ..... „ ... Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date