Loading...
17-102295 .- t Mechanical City of Federal Way Permit #:17-102295-00-ME Community Development Dept. 33325 8th Ave 5LE Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax(253)835-2609 Project Name: TIMME Project Address: 34737 27TH AVE SW Parcel Number:502946 0260 Project Description: Replace existing gas furnace Owner Applicant Contractor DAVID TIMME JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC PO BOX 1541 4601 S 134TH PL (GENERAL 01) SUMNER WA 98390 SEATTLE WA 98168 BRENNHA971R9(12/29/17) 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation9 3852 Is this an Online or O.T.C.application? Yes Furnaces 1 PERMIT EXPIRES Monday, 13 November,2017 Permit Issued on Wednesday,May 17,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ON �' N E Date: \—nr4 THIS CARD IS TO REMAIN ON-SITE ��� Construction Inspection Record Federa.Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 102295 00 Address: 34737 27TH AVE SW Project: JENNIFER TIMME FEDERAL WAY WA 98023-3077 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if `" you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Mechanical Rough-in(4165) 12 Gas Piping(4125) 3❑ Final-Mechanical(4065) Approved Approved to release test Approved �By Date ,�By Date .�By G � Date j ,.g,_-1�, 0 Rough Electrical 0 Final Electrical ❑ Right of Way Approved Approved Approved By Date By Date By Date