17-102295 .- t
Mechanical
City of Federal Way Permit #:17-102295-00-ME
Community Development Dept.
33325 8th Ave 5LE
Federal Way,WA 98003 Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax(253)835-2609
Project Name: TIMME
Project Address: 34737 27TH AVE SW Parcel Number:502946 0260
Project Description: Replace existing gas furnace
Owner Applicant Contractor
DAVID TIMME JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
PO BOX 1541 4601 S 134TH PL (GENERAL 01)
SUMNER WA 98390 SEATTLE WA 98168 BRENNHA971R9(12/29/17)
4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation9 3852 Is this an Online or O.T.C.application? Yes
Furnaces 1
PERMIT EXPIRES Monday, 13 November,2017
Permit Issued on Wednesday,May 17,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: ON �' N E Date:
\—nr4
THIS CARD IS TO REMAIN ON-SITE
��� Construction Inspection Record
Federa.Way INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 102295 00 Address: 34737 27TH AVE SW
Project: JENNIFER TIMME FEDERAL WAY WA 98023-3077
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if `"
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
0 Mechanical Rough-in(4165) 12 Gas Piping(4125) 3❑ Final-Mechanical(4065)
Approved Approved to release test Approved
�By Date ,�By Date .�By G � Date j ,.g,_-1�,
0 Rough Electrical 0 Final Electrical ❑ Right of Way
Approved Approved Approved
By Date By Date By Date