Loading...
17-102158 . z Mechanical City of Federal Way Permit #:17-102158-00-ME Community Development Dept. 33325 8th Ave S Federal Way,WA 98003 FILE Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 Project Name: BENITEZ Project Address: 1238 SW 318TH ST Parcel Number:416796 0390 Project Description: Replace gas furnace and install 2 1/2 ton a/c Owner Applicant Contractor STEPHANIE BENITEZ JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC 1238 SW 318TH ST 4601 S 134TH PL (GENERAL 01) FEDERAL WAY WA SEATTLE WA 98168 BRENNHA971R9(12/29/17) 98023 4601 S 134TH PL TUKWILA WA 98168 Additional Permit Information Mechanical Work Valuation? 7030 Is this an Online or O.T.C.application'? Yes '9)140°, Air Conditioners-Stand Along 1 Furnaces 1 PERMIT EXPIRES Tuesday,7 November,2017 Permit Issued on Thursday,May 11,2017 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: Date: A. THIS CARD IS TO REMAIN ON-SITE 'Construction Inspection Record Federal Way INSPECTION REQUESTS:(253)835-3050 PERMIT#: 17 102158 00 Address: 1238 SW 318TH ST Project: MIGUEL BENITEZ FEDERAL WAY WA 98023-4739 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible (read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. ElMechanical Rough-in(4165) . 2❑ Gas Piping(4125) •,Q Final-Mechanical(4065) , Approved Approved to release test Approved By Date By Date .By ✓ Date 5(23(rt • 0 Rough Electrical 0 Final Electrical Right of Way Approved Approved Approved By Date By Date By Date