17-102158 . z Mechanical
City of Federal Way Permit #:17-102158-00-ME
Community Development Dept.
33325 8th Ave S
Federal Way,WA 98003 FILE Inspection Request Line: (253)835-3050
Ph:(253)835-2607 Fax:(253)835-2609
Project Name: BENITEZ
Project Address: 1238 SW 318TH ST Parcel Number:416796 0390
Project Description: Replace gas furnace and install 2 1/2 ton a/c
Owner Applicant Contractor
STEPHANIE BENITEZ JAIMIE HOWBRENNAN HEATING&A/C BRENNAN HEATING&A/C LLC
1238 SW 318TH ST 4601 S 134TH PL (GENERAL 01)
FEDERAL WAY WA SEATTLE WA 98168 BRENNHA971R9(12/29/17)
98023 4601 S 134TH PL
TUKWILA WA 98168
Additional Permit Information
Mechanical Work Valuation? 7030 Is this an Online or O.T.C.application'? Yes
'9)140°,
Air Conditioners-Stand Along 1 Furnaces 1
PERMIT EXPIRES Tuesday,7 November,2017
Permit Issued on Thursday,May 11,2017
I hereby certify that the above information is correct and that the construction on the above described property
and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of
Washington and the City of Federal Way.
Owner or agent: Date:
A.
THIS CARD IS TO REMAIN ON-SITE
'Construction Inspection Record
Federal Way
INSPECTION REQUESTS:(253)835-3050
PERMIT#: 17 102158 00 Address: 1238 SW 318TH ST
Project: MIGUEL BENITEZ FEDERAL WAY WA 98023-4739
Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible
(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if
you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card.
ElMechanical Rough-in(4165) . 2❑ Gas Piping(4125) •,Q Final-Mechanical(4065) ,
Approved Approved to release test Approved
By Date By Date .By ✓ Date 5(23(rt
•
0 Rough Electrical
0 Final Electrical Right of Way
Approved Approved Approved
By Date By Date By Date