Loading...
16-104669 • ." Plumbing City of Federal Way Community&Econ.Dev.Services Permit #: 16-104669-00-P L 33325 8th Ave S Federal Way,WA 98003 Inspection Request Line: (253)835-3050 Ph:(253)835-2607 Fax:(253)835-2609 FILE p q Project Name: RUSSELL • Project Address: 33605 39TH AVE vs! Parcel Number: 921151 0390 Project Description: Add new shower in basement,reroute kitchen drain,swap shower and tub/shower,install new fixtures Owner Applicant Contractor ANTHONY B RUSSELL JUSTIN LEES LIBERTY PLUMBING LLC BRIAN R RUSSELL LIBERTY PLUMBING LLC LIBERPL855DO(3/20/17) 33605 39TH AVE SW 26116 112TH ST E 26116 112TH ST E FEDERAL WAY WA 98023 BUCKLEY WA 98321 BUCKLEY WA 98321 Plumbing Fixtures Bathtubs 1 Dishwashers 1 Drains 1 Laundry Washer Outlets. 1 Lavatories 3 Showers 2 Sinks 1 Water Closets 3 Water Heaters 1 PERMIT EXPIRES Sunday, March 19, 2017 Permit Issued on Tuesday, September 20, 2016 I hereby certify that the above information is correct and that the construction on the above described property and the occupancy and the use will be in accordance with the laws, rules and regulations of the State of Washington and the City of Federal Way. Owner or agent: ONLINEI\J Date: . -,4A, THIS CARD IS TO REMAIN ON-SITE Federa! Way Construction Inspection Record INSPECTION REQUESTS:(253)835-3050 PERMIT#: 16-104669-00-PL Address: 33605 39TH AVE SW Project: ANTHONY B RUSSELL FEDERAL WAY, WA 98023-2912 Scheduled inspections may be failed if this card is not on-site. DO NOT LOSE THIS CARD. Inspections are listed as close to sequential order as possible(read left to right,top to bottom). Please schedule inspections as appropriate. Work must not be covered until it is approved. Check with your inspector if you are unsure about any of the inspections or the inspection sequence. On-going inspections are logged on the back of this card. 0 Plumbing Groundwork(4190) 0 Rough Plumbing(4230) 0 Gas Piping(4125) Approved to cover Approved Approved to release test By Date By , Date )6)2.-r Ji, By Date 0 Final-Plumbing(4075) ` . ' Approved By AI ) Date ' 115 7 , D Rough Electrical 0 Final Electrical El Right of Way Approved Approved Approved By Date By Date By Date